摘要: Disclosed herein is an integrated method and system for managing human resources. Specifically, the method and system integrates several processes (e.g., a process for developing a strategy and particularly for developing a set of rules on how human resources will be managed and sourced, a process for developing a long-term strategic plan for sourcing human resources to satisfy demands, a process for developing a near-term operational plan recommending individual human resources be used to satisfy selected demands, a process for selecting and assigning individual resources to specific engagements, etc.). Thus, the method operates through a spectrum of time horizons from the strategic to real time, providing a coherent and cohesive system for matching supply to demand based on the priorities of the business as represented through the set of rules.
摘要翻译: 本文公开了一种用于管理人力资源的集成方法和系统。 具体来说,该方法和系统集成了几个过程(例如,制定战略的过程,特别是制定一套关于如何管理和采购人力资源的规则的过程,制定人力资源采购长期战略计划的过程 为了满足需求,可以使用建立个人人力资源的近期业务计划的过程来满足所选择的需求,选择和分配特定资源的过程等)。 因此,该方法通过从战略到实时的时间范围运行,提供一个连贯一致的凝聚力的系统,用于根据通过一套规则表示的业务优先级来匹配供需。
-
公开(公告)号:US20070073576A1
公开(公告)日:2007-03-29
申请号:US11238909
申请日:2005-09-29
申请人: Daniel Connors , John Deeb , John Fasano , Matthew Florian , Philip Garofolo , Donna Gresh , David Quinney , Ronald Zink
发明人: Daniel Connors , John Deeb , John Fasano , Matthew Florian , Philip Garofolo , Donna Gresh , David Quinney , Ronald Zink
IPC分类号: G06F17/30
CPC分类号: G06Q10/06 , G06Q10/06315
摘要: An integrated Resource Capacity Planning (RCP) process and tool program is presented. The RCP program includes identifying future labor needs and predicted labor supply. A gap analysis between the predicted future needs and supply is performed. Based on the gap analysis, resource actions are planned and taken to alleviate predicted future labor shortages. The predicted gap analysis is later compared with actual future needs/supply to evaluate the effectiveness of the parameters used in the RCP program. The RCP program is enterprise-independent, thus permitting re-use of data and parameters, and allowing the RCP program to be scalable.