公开(公告)号:US20220112738A1
公开(公告)日:2022-04-14
申请号:US17431531
申请日:2019-10-31
Applicant: NABRAWIND TECHNOLOGIES, S.L
Inventor: Hely Ricardo SAVII COSTA , Ion AROCENA DE LA RÚA , Eneko SANZ PASCUAL , Javier IRIARTE ELETA , Jose Alberto ROJO CARRIÓN
Abstract: A transition piece for a wind turbine tower including a hollow frustoconical piece that is connected to an upper ring and a lower ring. The upper ring is connected to crossbars and the lower ring to radial columns. The transition piece also includes three connectors, each of them being connected to a crossbar, two radial columns and two connection profiles that keep the three connectors joined together, so that a pair of radial columns is arranged between a connector and the lower ring and the crossbars are arranged between the upper ring and a respective connector. The radial columns form an angle of between 65° and 75°, measured between the longitudinal axis of the corresponding radial column with the normal axis of the frustoconical piece.
-
公开(公告)号:US20200157759A1
公开(公告)日:2020-05-21
申请号:US16688191
申请日:2019-11-19
Applicant: NABRAWIND TECHNOLOGIES, S.L.
Inventor: Hely Ricardo SAVII COSTA , Ion AROCENA DE LA RÚA , Eneko SANZ PASCUAL , Arantxa ESPARZA ZABALZA
Abstract: Foundation for a tower of a wind turbine with at least three columns. The foundation includes a reinforced concrete pile corresponding to each of the tower columns. According to one embodiment the pile includes a bolt cage and a main reinforcement formed by a cylindrical framework made up of horizontal rings interconnected by vertical bars. The bolt cage is arranged inside the main reinforcement radially at a distance of less than 0.1 meters. Each of the piles resides in a hole formed in the ground. Concrete is not poured into the holes until the main reinforcements and bolt cages are placed therein and aligned with one another.
-