LOAD CONTROL FROM CONTROL PLANE CIoT EPS OPTIMISATION

    公开(公告)号:US20200305022A1

    公开(公告)日:2020-09-24

    申请号:US16088881

    申请日:2017-03-23

    Abstract: A core network node includes a transmitter configured to transmit a control plane data back-off timer to restrict a request from a UE for data transmission via Control Plane CIoT EPS Optimization. A UE includes a receiver configured to receive a control plane data back-off timer from a core network node, and a controller configured to not initiate data transmission via Control Plane CIoT EPS Optimization while the control plane data back-off timer is running.

Patent Agency Ranking