公开(公告)号:US11506022B2
公开(公告)日:2022-11-22
申请号:US17044893
申请日:2019-04-04
Applicant: PETROLEO BRASILEIRO S.A.—PETROBRAS
Inventor: Ricardo Freire Grandi , Renan da Silva Costa , Otavio Campos de Araujo , Leonardo Marazzo Garcia , Kris Pernasetti Dunlop , Jose Ricardo Brigido de Moura Filho , Joao Paulo Sanseverino Abdu , Joao Marcelo Mussi Baptista , Gustavo Salgueiro de Oliveira , Giovani Ferreira Machado , George Souza Costa , Frederico Ferreira Chaves Vaz , Ednaldo Goncalves de Moura , Cristiane Koslinski , Carolina Bertholdo da Cunha , Aliel Faria Riente , Antonio Carlos Ramos Junior , Alexandre Campos Manhaes
Abstract: There is provided a method for well construction comprising the steps of: a first phase of the well construction, in which a bottom hole assembly, BHA, with a first drill is used for drilling, and a conductor casing is lowered into the well and cemented; a second phase of the well construction, in which a second drill is used for drilling, wherein a production adapter base, PAB, is installed in parallel with lowering a blowout preventer, BOP; and a third phase of the well construction in which a third drill is used for drilling, for the steps of landing and geonavigation inside a reservoir.