-
公开(公告)号:US20210148195A1
公开(公告)日:2021-05-20
申请号:US17044893
申请日:2019-04-04
Applicant: PETROLEO BRASILEIRO S.A. - PETROBRAS
Inventor: Ricardo FREIRE GRANDI , Renan DA SILVA COSTA , Otavio CAMPOS DE ARAUJO , Leonardo MARAZZO GARCIA , Kris PERNASETTI DUNLOP , Jose Ricardo BRIGIDO DE MOURA FILHO , Joao Paulo SANSEVERINO ABDU , Joao Marcelo MUSSI BAPTISTA , Gustavo SALGUEIRO DE OLIVEIRA , Giovani FERREIRA MACHADO , George SOUZA COSTA , Frederico FERREIRA CHAVES VAZ , Ednaldo GONCALVES DE MOURA , Cristiane KOSLINSKI , Carolina BERTHOLDO DA CUNHA , Aliel FARIA RIENTE , Antonio Carlos RAMOS JUNIOR , Alexandre CAMPOS MANHAES
Abstract: There is provided a method for well construction comprising the steps of: a first phase of the well construction, in which a bottom hole assembly, BHA, with a first drill is used for drilling, and a conductor casing is lowered into the well and cemented; a second phase of the well construction, in which a second drill is used for drilling, wherein a production adapter base, PAB, is installed in parallel with lowering a blowout preventer, BOP; and a third phase of the well construction in which a third drill is used for drilling, for the steps of landing and geonavigation inside a reservoir.