Abstract:
A pile is driven through a first formation and into a subterranean second formation of the earth beneath a body of water, a cavity is formed below the pile and extends outwardly beyond the pile, and a concrete volume is thereafter formed in the cavity and a portion of the pile. The pile is in intimate contact with the first and second formations and the concrete is in intimate sealing contact with the pile and the second formation.