Group determination method and group determination apparatus

    公开(公告)号:US10893641B2

    公开(公告)日:2021-01-12

    申请号:US15866703

    申请日:2018-01-10

    Abstract: A group determination method includes a step of calculating an external set-up work time for an external set-up work by which a component supplier used in a group that is a next production target of a group under production in a component mounting line, including a plurality of the component mounters capable of attaching and detaching a component supply carriage which can arrange a plurality of the component suppliers (tape feeders), is removed from the component mounting line and arranged in the component supply carriage; and a step of calculating a production completion time at which the production of all the mounting boards that are the production targets is completed in consideration of the external set-up work time. A plurality of groups which are common in an arrangement of component suppliers for the mounting boards that are the production targets are determined so that production completion time is shortened.

    Group determination method and group determination apparatus

    公开(公告)号:US10345792B2

    公开(公告)日:2019-07-09

    申请号:US15865526

    申请日:2018-01-09

    Abstract: In two component mounting lines or more each including the plurality of the component mounters, a set-up changing work time, necessary for executing set-up changing work in the two component mounting lines or more based on the number of workers assigned for production in the two component mounting lines or more in each time zone, and the number of workers necessary for the set-up changing work necessary when the mounting board is changed in the two component mounting lines or more, is calculated; and a production completion time, which includes a set-up changing work time and at which the production of all the mounting boards that are the production targets is completed, is calculated; and a group is determined so that the production completion time is shortened within a predetermined time period in the two component mounting lines or more.

Patent Agency Ranking