公开(公告)号:US20250103991A1
公开(公告)日:2025-03-27
申请号:US18727966
申请日:2023-01-13
Inventor: Yuta SHIMAZAKI , Akira MINEGISHI
IPC: G06Q10/0633 , G06Q50/04
Abstract: An anomaly determination method, in a production management system that manages a production line including first, second, and third production devices, includes: obtaining, from among first, second, and third operating status data of the first, second, and third production devices, respectively, at least the first and third operating status data; when it is determined that the second operating status data was not obtained, predicting a dummy operation timepoint corresponding to a planned production quantity of the second production device, and generating dummy operating status data including the planned production quantity and the dummy operation timepoint; performing anomaly determination processing on production processes as a whole based on the first and third operating status data and the dummy operating status data; and outputting determination result information representing a result of the anomaly determination processing to display the determination result information on a display device included in the production management system.
-
公开(公告)号:US20250076858A1
公开(公告)日:2025-03-06
申请号:US18727601
申请日:2023-01-13
Inventor: Yuta SHIMAZAKI , Akira MINEGISHI
IPC: G05B19/418
Abstract: An anomaly determination method, in a production management system that manages a production line including first, second, and third production devices, includes: obtaining, from among first, second, and third operating status data of the first, second, and third production devices, respectively, at least the first and third operating status data; when determined that the second operating status data was not obtained, predicting a dummy operation timepoint and a dummy wait time based on operation timepoints and wait times of preceding and subsequent processes and generating dummy operating status data corresponding to the second operating status data including the dummy operation timepoint and wait time; performing anomaly determination processing on production processes as a whole based on the first, third, and dummy operating status data; and outputting determination result information representing a result of the anomaly determination processing on a display device in the production management system.
-
公开(公告)号:US20230384759A1
公开(公告)日:2023-11-30
申请号:US18249467
申请日:2021-10-29
Inventor: Hironori OHIGASHI , Akira MINEGISHI , Yuta SHIMAZAKI , Yukinori SASAKI
IPC: G05B19/4065
CPC classification number: G05B19/4065 , G05B2219/40335
Abstract: An information processing method includes: calculating a probability density distribution of a work time that is at least part of a setup time, based on production performance data read from storage, the setup time being time taken for a setup work that is performed between lots; determining whether the work time is anormal, based on the probability density distribution; and outputting a result of the determining.
-
-