-
公开(公告)号:US20090321553A1
公开(公告)日:2009-12-31
申请号:US12448952
申请日:2008-01-10
CPC分类号: B65H75/185 , B65H2301/5321
摘要: A core (2) for receiving wound sheet material, which core (2) comprises a tube (4), a first end member (6) inserted in a first end (8) of the tube (4), and a second end member (10) inserted in a second end (12) of the tube (4), the core (2) being such that it is able to be earthed in order to enable the discharge of static electricity from the core (2), and the earthing (16) being such that it is effected by a chuck (14) of a machine handling the core (2) during use of the core (2) whereby the static electricity is discharged through the machine.
摘要翻译: 一种用于接收缠绕片材的芯体(2),所述芯体(2)包括管(4),插入在管(4)的第一端(8)中的第一端部构件(6)和第二端构件 (10)插入管(4)的第二端(12)中,芯(2)使得能够接地以便能够从芯(2)排出静电,并且 接地(16)使得其在使用芯(2)期间由处理芯(2)的机器的卡盘(14)实现,从而静电通过机器排出。
-
公开(公告)号:US20100025522A1
公开(公告)日:2010-02-04
申请号:US12449288
申请日:2008-02-06
CPC分类号: B65H75/10 , B65H75/185 , B65H75/22
摘要: A core for receiving sheet material, which core comprises a tube (2), a first end member (4) which extends into a first end of the tube (2), and a second end member which extends into a second end of the tube (2), and the core being such that the tube is formed of a plurality of part circular tube portions (6) which are connected together along longitudinally extending edges (8), and the first and the second end members are each formed of a plurality of part circular end member portions (10) which are connected together along longitudinally extending edges (12).
摘要翻译: 用于接收片材的芯,该芯包括管(2),延伸到管(2)的第一端中的第一端部构件(4)和延伸到管的第二端的第二端构件 (2),并且所述芯部使得所述管由沿着纵向延伸边缘(8)连接在一起的多个部分圆形管部分(6)形成,并且所述第一和第二端部部件由 多个部分圆形端部构件部分(10)沿着纵向延伸的边缘(12)连接在一起。
-
3.
公开(公告)号:US08181335B2
公开(公告)日:2012-05-22
申请号:US12449829
申请日:2008-02-06
IPC分类号: B23Q15/00
CPC分类号: B65H75/185 , B65H75/50 , Y10T29/53022 , Y10T29/53039 , Y10T29/53061 , Y10T29/53078
摘要: Apparatus for assembling a core for wound sheet material, comprising a tube, a first end member, and a second end member; the apparatus comprising a base, a first chuck for insertion in the first end member, a second chuck for insertion in the second end member, a ram for applying axial pressure such that the first end member is forced into the first end of the tube and the second end member is forced into a second end of the tube, drill devices for drilling fixing apertures, and a monitor device for sensing ambient temperature and enabling the length of the core to be measured at the time of the assembly of the core in the ambient temperature so that the length of the core falls in temperature and length parameters set for subsequent winding of the sheet material on the core.
摘要翻译: 用于组装用于缠绕片材的芯的装置,包括管,第一端构件和第二端构件; 该装置包括基座,用于插入第一端构件的第一卡盘,用于插入第二端构件的第二卡盘,用于施加轴向压力的冲头,使得第一端构件被迫进入管的第一端,并且 第二端构件被迫进入管的第二端,用于钻孔固定孔的钻孔装置和用于感测环境温度的监测装置,并且使得在芯的组装时可测量芯的长度 环境温度使得芯的长度落在温度和长度参数中,用于随后将芯片材料卷绕在芯上。
-
4.
公开(公告)号:US20100018037A1
公开(公告)日:2010-01-28
申请号:US12449829
申请日:2008-02-06
IPC分类号: B23P21/00
CPC分类号: B65H75/185 , B65H75/50 , Y10T29/53022 , Y10T29/53039 , Y10T29/53061 , Y10T29/53078
摘要: Apparatus (2) for assembling a core (4) for receiving wound sheet material: which core (4) comprises a tube (6), a first end member (8) inserted in a first end (10) of the tube (6), and a second end member (12) inserted in a second end (14) of the tube (6); and the apparatus (2) comprising a base (16), first chuck means (18) mounted on the base (16) and for insertion in the first end member (8), second chuck means (20) mounted on the base (16) and for insertion in the second end member (12), a ram (22) mounted on the base (16) and for applying axial pressure on one of the first and the second end members (8, 12) such that the first end member (8) is forced into the first end (10) of the tube (6) and the second end member (12) is forced into the second end (14) of the tube (6) thereby to ensure that the first and the second end members (8, 12) are accurately fitted in the tube (6), first drill means (24) for drilling at least one fixing aperture in the first end (10) of the tube (6) and the first end member (8) thereby to enable the fixing of the first end member (8) in the first end (10) of the tube (6), second drill means (26) for drilling at least one fixing aperture in the second end (14) of the tube (6) and the second end member (12) thereby to enable the fixing of the second end member (12) in the second end (14) of the tube (6), and monitor means (28) for sensing ambient temperature and enabling the length of the core (4) to be measured at the time of the assembly of the core (4) in the ambient temperature and thereby to ensure that the length of the core (4) falls in temperature and length parameters set for subsequent winding of the sheet material on the core (4).
摘要翻译: 用于组装用于接收缠绕片材的芯(4)的装置(2):该芯(4)包括管(6),插入管(6)的第一端(10)中的第一端构件(8) ,以及插入所述管(6)的第二端(14)中的第二端部构件(12)。 并且所述装置(2)包括基座(16),安装在基座(16)上并用于插入第一端部构件(8)中的第一卡盘装置(18),安装在基座(16)上的第二卡盘装置 )并且用于插入在第二端部构件(12)中,安装在基座(16)上并用于在第一和第二端构件(8,12)中的一个上施加轴向压力的冲头(22),使得第一端 构件(8)被迫进入管(6)的第一端(10),并且第二端构件(12)被迫进入管(6)的第二端(14),从而确保第一和第 第二端构件(8,12)精确地装配在管(6)中,用于在管(6)的第一端(10)和第一端构件(6)中钻出至少一个固定孔的第一钻孔装置(24) 8),从而能够将第一端部构件(8)固定在管(6)的第一端(10)中,第二钻孔装置(26)用于在第二端部(14)中的至少一个固定孔 管(6)和第二端部构件(12) 从而能够将第二端部构件(12)固定在管子(6)的第二端部(14)中,以及用于检测环境温度的监视装置(28),并且能够测量芯子(4)的长度 在芯体(4)在环境温度下组装时,从而确保芯部(4)的长度落在温度和长度参数中,以便随后将片材卷绕在芯部(4)上。
-
-
-