公开(公告)号:US11994011B2
公开(公告)日:2024-05-28
申请号:US17761018
申请日:2020-09-16
申请人: PetroChina Company Limited , Sichuan Shengnuo Oil. And Gas Engineering Technology Service Co. Ltd
发明人: Weilin Wang , Huiyun Ma , Changqing Ye , Hao Tan , Hanbing Tang , Daogang Cai , Xueqiang Wang , Yukui Hong , Fengjing Sun , Wei Zhou , Ting Zhang , Zonghao Dong , Yan Huang , Yun Miao
IPC分类号: E21B43/12 , E21B33/12 , E21B33/129
CPC分类号: E21B43/122 , E21B33/1208 , E21B33/1294
摘要: The present invention discloses a permanent packer and an extended gas lift method using the permanent packer, the method comprising: S1. imbedding the extended gas lift embedded pipe when setting the permanent packer, wherein the extended gas lift embedded pipe has an upper end being closed and a lower end being open, is provided therein with a one-way valve through which the fluid can pass from top to bottom; S2. lowering a breaking device from the production casing when in the extended gas lift, to break the upper end of the extended gas lift embedded pipe such that the upper and lower ends of the extended gas lift embedded pipe are communicated; and S3. injecting gas into the production casing, lifting the accumulated liquid in the bottom hole to the ground surface, to complete the extended gas lift. The method does not affect the sealing property of the permanent packer, can fully adapt to the demand in the early and middle stages of gas well development, and meanwhile can realize extended gas lift without workover in the middle and later stages of gas well development, and has low implementation cost and good safety.
-
公开(公告)号:US20220349282A1
公开(公告)日:2022-11-03
申请号:US17761018
申请日:2020-09-16
申请人: PetroChina Company Limited , Sichuan Shengnuo Oil And Gas Engineering Technology Service Co.Ltd
发明人: Weilin Wang , Huiyun Ma , Changqing Ye , Hao Tan , Hanbing Tang , Daogang Cai , Xueqiang Wang , Yukui Hong , Fengjing Sun , Wei Zhou , Ting Zhang , Zonghao Dong , Yan Huang , Yun Miao
IPC分类号: E21B43/12 , E21B33/129 , E21B33/12
摘要: The present invention discloses a permanent packer and an extended gas lift method using the permanent packer, the method comprising: S1. imbedding the extended gas lift embedded pipe when setting the permanent packer, wherein the extended gas lift embedded pipe has an upper end being closed and a lower end being open, is provided therein with a one-way valve through which the fluid can pass from top to bottom; S2. lowering a breaking device from the production casing when in the extended gas lift, to break the upper end of the extended gas lift embedded pipe such that the upper and lower ends of the extended gas lift embedded pipe are communicated; and S3. injecting gas into the production casing, lifting the accumulated liquid in the bottom hole to the ground surface, to complete the extended gas lift. The method does not affect the sealing property of the permanent packer, can fully adapt to the demand in the early and middle stages of gas well development, and meanwhile can realize extended gas lift without workover in the middle and later stages of gas well development, and has low implementation cost and good safety.
-