METHOD FOR WIND TURBINE PLACEMENT IN A WIND POWER PLANT
    1.
    发明申请
    METHOD FOR WIND TURBINE PLACEMENT IN A WIND POWER PLANT 有权
    风力发电厂风力发电机组的方法

    公开(公告)号:US20090295165A1

    公开(公告)日:2009-12-03

    申请号:US12130509

    申请日:2008-05-30

    IPC分类号: F03D11/00 G06F17/50

    摘要: A method for determining wind turbine location within a wind power plant based on at least one design criteria. A wind turbine layout including at least one wind turbine location is prepared and site conditions at each wind turbine location are determined. One or more plant design metrics are evaluated in response to the site conditions. The plant design metrics are analyzed in response to the site conditions. The method further includes applying constraints to the wind turbine layout and comparing the plant design metrics to the design criteria and constraints. Thereafter, the wind turbine locations are selectively adjusted within the layout in response to the comparing step until a stop criteria is reached.

    摘要翻译: 一种用于基于至少一个设计标准来确定风力发电厂内的风力涡轮机位置的方法。 制备包括至少一个风力涡轮机位置的风力涡轮机布局并确定每个风力涡轮机位置处的现场条件。 响应于现场条件评估一个或多个工厂设计指标。 根据现场情况分析工厂设计指标。 该方法还包括对风力涡轮机布局应用约束并将工厂设计度量与设计标准和约束进行比较。 此后,响应于比较步骤,在布局内选择性地调整风力涡轮机位置,直到达到停止标准。