-
公开(公告)号:US20190094279A1
公开(公告)日:2019-03-28
申请号:US15717533
申请日:2017-09-27
Applicant: QUANTA COMPUTER INC.
Inventor: Kuang-Hua OU YANG , Chih-Chang TSAI , Shu-Chen NING
Abstract: A power supply unit that allows measurement of the capacitance without interrupting operation of the unit is disclosed. The unit includes a controller that causes a voltage change of a capacitor from a first threshold voltage between two periods of time. The time difference of when the voltage reaches a second threshold voltage is measured and the capacitance is determined from the time measurement, voltage change and power dissipation. The determination of capacitance may be performed while the power supply unit is actively supplying power.
-
公开(公告)号:US20150331468A1
公开(公告)日:2015-11-19
申请号:US14691160
申请日:2015-04-20
Applicant: Quanta Computer Inc.
Inventor: Maw-Zan JAU , Shu-Chen NI , Chin-Hsiang CHAN , Yi-Sheng CHEN , Chih-Chang TSAI
CPC classification number: G06F1/30 , G06F1/3287 , H02J9/06
Abstract: In some implementations, power provided to a computing system, such as a rack system, may be interrupted. This interruption is detected, and in response, power from a battery backup system is directed to the computing system to replace the interrupted power source, which in some implementations may be a main AC power grid source. A signal is received indicating that a backup power source, for example a backup generator system, is online and prepared to deliver power to the computing system. For an initial period of time, this backup power source is prevented from providing power to the computing system. For example, the backup generator system may be providing power to a power supply unit of the computing system, but the power is not allowed to flow to the computing system. After the initial period of time passes, the power provided to the computing system by the battery backup unit is reduced at a particular rate of change while the power from the backup generator system is allowed to flow to the computing system through the power supply unit.
Abstract translation: 在一些实现中,提供给诸如机架系统的计算系统的功率可能被中断。 检测到这种中断,作为响应,来自电池备份系统的电力被引导到计算系统以替代中断的电源,其在一些实施方式中可以是主交流电网源。 接收到指示备用电源(例如备用发电机系统)在线并准备向计算系统发送电力的信号。 在初始时间段内,该备用电源被阻止向计算系统提供电力。 例如,备用发电机系统可以向计算系统的电源单元提供电力,但不允许电力流向计算系统。 在初始时间段过去之后,通过电池备用单元提供给计算系统的电力以特定的变化率被减小,而来自备用发电机系统的电力被允许通过电源单元流到计算系统。
-