-
公开(公告)号:US20250140101A1
公开(公告)日:2025-05-01
申请号:US19007100
申请日:2024-12-31
Applicant: RAPIDSOS, INC.
Inventor: Conor Fucci , James Patrick Olejar, JR. , Zachery LaValley , Patricia Ann Beesley , Lillian Nguyen , Leah Lewy , Indranil Chatterjee , Henry Katz , Zvika Ferentz , Jeffrey Sternberg , Nicholas Edward Horelik , William Thomas Guthrie
IPC: G08B25/00 , G06F3/0482 , G06F3/0486 , G06F9/54 , G08B25/01 , G08B25/08 , G08B27/00
Abstract: Described herein are systems, devices, methods, and media for an emergency response data exchange system. The system provides an operations center emergency management application with a textual and/or graphical notification of emergency communications initiated on a premises managed by the operations center. The system exchanges operations center data (e.g., floorplans, video feeds, point of contact information, building access controls) with an emergency communications center (ECC) and/or with a first responder device to facilitate reducing emergency response times. The system selectively establishes communications (e.g., messaging windows) between the operations center, ECC, and/or first responder device to facilitate real-time information sharing between relevant parties of an emergency.
-
公开(公告)号:US20250115283A1
公开(公告)日:2025-04-10
申请号:US18759647
申请日:2024-06-28
Applicant: RAPIDSOS, INC.
Inventor: Zachery LaValley , Daniel Richard Seidberg , Conor Fucci
IPC: B61L23/30
Abstract: A railroad crossing blockage detection and notification system gathers emergency call data and/or infrastructure sensor data and uses the data to generate a blockage score that is representative of a likelihood of a railroad blockage at a railroad crossing. The system may include and use a machine learning model to generate the blockage score. Using historical train collision data, the machine learning model may be trained on emergency call data and/or on infrastructure sensor data available in proximity to railroad crossing. The system may receive current emergency call data and/or infrastructure sensor data, may apply the data to the machine learning model to generate a likelihood of a blockage, and may notify emergency communication centers (ECCs), network operations centers (NOCs), emergency responders, and/or train systems of the potential blockage. In response to a potential blockage, a train may be slowed down or stopped to reduce the likelihood of a collision.
-