-
公开(公告)号:US3779025A
公开(公告)日:1973-12-18
申请号:US3779025D
申请日:1971-10-07
Applicant: RAYMOND INT INC
CPC classification number: E02D5/38
Abstract: Piles are installed by driving a tubular lower pile shell section into the ground to a first location beyond which the shell section refuses to penetrate, thereafter, filling the shell with concrete, allowing the concrete to harden and stiffen the shell, and thereafter continuing to drive the concreted shell down to a final bearing depth substantially beyond the first location.
Abstract translation: 通过将管状下桩壳部分驱动到地面到第一位置而安装桩,其中壳部分不允许穿透,之后用混凝土填充壳体,允许混凝土硬化和加固壳体,然后继续驱动 混凝土壳体到达基本上超过第一位置的最终轴承深度。
-
公开(公告)号:US3707847A
公开(公告)日:1973-01-02
申请号:US3707847D
申请日:1968-02-06
Applicant: RAYMOND INT INC
CPC classification number: E02D3/106
Abstract: Formation of sand drains in the earth by drilling and forcing a fluid at high velocity to wash out a hole and thereafter filling the hole by forcing filler material down through a pipe; the pipe being outfitted with special valve control means to control the flow of fluid and filler therethrough in generally inverse manner.
-
公开(公告)号:US3772894A
公开(公告)日:1973-11-20
申请号:US3772894D
申请日:1971-12-08
Applicant: RAYMOND INT INC
CPC classification number: E02D3/106
Abstract: Formation of sand drains in the earth by drilling and forcing a fluid at high velocity to wash out a hole and thereafter filling the hole by forcing filler material down through a pipe; the pipe being outfitted with special valve control means to control the flow of fluid and filler therethrough in generally inverse manner.
Abstract translation: 通过高速钻孔和强制流体冲洗一个孔,然后通过管道将填料向下挤压来填充孔,从而形成泥土排水沟; 该管配备有特殊的阀控制装置,以大致相反的方式控制流体和填料的流动。
-
-