-
公开(公告)号:US08641804B2
公开(公告)日:2014-02-04
申请号:US13194123
申请日:2011-07-29
CPC分类号: B01D53/06 , B01D53/261 , B01D2257/80 , B01D2258/06 , B01D2259/4009 , B01D2259/45 , F24F3/1423 , F24F2003/1458
摘要: Systems and methods to condition air are disclosed. An example system includes a desiccant heat transfer device to supply conditioned air to a facility, an air intake to receive air to be conditioned via the desiccant heat transfer device, and a make-up exhaust to provide exhaust air from a heat dissipating device in the facility to provide heated air to reactivate the desiccant heat transfer device.
摘要翻译: 公开了调节空气的系统和方法。 示例性系统包括用于向设施供应经调节的空气的干燥剂热传递装置,用于接收经由干燥剂传热装置调节的空气的进气口和补充排气,以从散热装置提供排气 提供加热空气以重新激活干燥剂传热装置的设施。
-
公开(公告)号:US20130025450A1
公开(公告)日:2013-01-31
申请号:US13194123
申请日:2011-07-29
CPC分类号: B01D53/06 , B01D53/261 , B01D2257/80 , B01D2258/06 , B01D2259/4009 , B01D2259/45 , F24F3/1423 , F24F2003/1458
摘要: Systems and methods to condition air are disclosed. An example system includes a desiccant heat transfer device to supply conditioned air to a facility, an air intake to receive air to be conditioned via the desiccant heat transfer device, and a make-up exhaust to provide exhaust air from a heat dissipating device in the facility to provide heated air to reactivate the desiccant heat transfer device.
摘要翻译: 公开了调节空气的系统和方法。 示例性系统包括用于向设施供应经调节的空气的干燥剂热传递装置,用于接收经由干燥剂传热装置调节的空气的进气口和补充排气,以从散热装置提供排气 提供加热空气以重新激活干燥剂传热装置的设施。
-
公开(公告)号:US20110106501A1
公开(公告)日:2011-05-05
申请号:US12608524
申请日:2009-10-29
申请人: Thomas W. Christian , Yuan Chen , Chih C. Shih , Ratnesh Kumar Sharma , Christopher Edward Hoover , Manish Marwah , Amip J. Shah , Chandrakant Patel , Cullen E. Bash , Daniel Juergen Gmach
发明人: Thomas W. Christian , Yuan Chen , Chih C. Shih , Ratnesh Kumar Sharma , Christopher Edward Hoover , Manish Marwah , Amip J. Shah , Chandrakant Patel , Cullen E. Bash , Daniel Juergen Gmach
IPC分类号: G06F17/50
CPC分类号: H04L67/16
摘要: A method for automated design of an IT infrastructure, includes a) identifying IT equipment to support services to be provided to meet one or more user requirements; b) identifying one or more auxiliary infrastructures to meet requirements of the identified computer equipment; c) synthesizing the IT equipment and the one or more auxiliary infrastructures to generate a candidate design; d) analyzing one or more operating characteristics of the candidate design; e) repeating steps a)-d) on at least one additional candidate design that differs from the candidate design generated at step c); and f) storing at least one of the candidate design and the at least one additional candidate design.
摘要翻译: 一种用于自动设计IT基础设施的方法,包括:a)识别IT设备以支持要提供的服务以满足一个或多个用户需求; b)识别一个或多个辅助基础设施以满足所识别的计算机设备的要求; c)合成IT设备和一个或多个辅助基础设施以产生候选设计; d)分析候选人设计的一个或多个经营特征; e)在与步骤c)中生成的候选设计不同的至少一个附加候选设计上重复步骤a)-d); 以及f)存储所述候选设计和所述至少一个附加候选设计中的至少一个。
-
公开(公告)号:US08392157B2
公开(公告)日:2013-03-05
申请号:US12744898
申请日:2007-11-27
申请人: Amip J. Shah , Ratnesh Kumar Sharma , Chih C. Shih , Abdimonem Beitelal , Cullen E. Bash , Chandrakant Patel
发明人: Amip J. Shah , Ratnesh Kumar Sharma , Chih C. Shih , Abdimonem Beitelal , Cullen E. Bash , Chandrakant Patel
IPC分类号: G06F17/50
CPC分类号: G06F1/20 , H05K7/20836
摘要: In a method of synthesizing components to design a system meeting an exergy loss target value, one or more candidate sets of components are synthesized and an exergy loss value for each of the one or more candidate sets of components are calculated. A determination as to whether at least one of the candidate set of components meets the exergy loss target value is made and at least one candidate set of components determined to meet the exergy loss target value is identified as the set of components for use in the design of the system.
摘要翻译: 在合成组件以设计满足有效能损失目标值的系统的方法中,合成一个或多个候选组分,并且计算所述一个或多个候选组分组中的每一个的有效能损失值。 确定候选组件中的至少一个是否符合有效能损失目标值,并且确定满足有效能损失目标值的至少一个被确定的组件的候选组被确定为用于设计中的组件集合 的系统。
-
公开(公告)号:US20090132097A1
公开(公告)日:2009-05-21
申请号:US12260704
申请日:2008-10-29
IPC分类号: G05D23/00
CPC分类号: G05D23/1917 , G06F1/20 , H05K7/20836
摘要: A virtual cooling infrastructure includes a demand manager having logical descriptions of a plurality of heat loads and the demand manager is configured to determine cooling load demands of the heat loads. The infrastructure also includes a capacity manager having logical descriptions of a plurality of cooling system components configured to supply cooling resources to cool the heat loads. The infrastructure further includes a service operator configured to map the cooling resources of the cooling system components to the cooling load demands of the heat loads.
摘要翻译: 虚拟冷却基础设施包括具有多个热负荷的逻辑描述的需求管理器,并且需求管理器被配置为确定热负荷的冷却负载需求。 该基础设施还包括容量管理器,其具有被配置为提供冷却资源以冷却热负荷的多个冷却系统组件的逻辑描述。 该基础设施还包括服务操作者,其被配置为将冷却系统部件的冷却资源映射到热负荷的冷却负载需求。
-
公开(公告)号:US20110307110A1
公开(公告)日:2011-12-15
申请号:US12813012
申请日:2010-06-10
IPC分类号: G06F1/26
CPC分类号: G06F1/26
摘要: A virtual power infrastructure for managing distribution of power to a plurality of power demanding units from a plurality of power generators includes a demand manager having logical descriptions of the power demanding units, in which the demand manager is configured to determine power load demands of the power demanding units using the logical descriptions of the power demanding units, and a capacity manager having logical descriptions of the power generators. The capacity manager is configured to determine allocation of power capacity supplied to the power generators from one or more of the power generators to meet the power load demands of the power demanding units, while satisfying one or more predetermined constraints associated with at least one of the power demanding units and the power generators.
摘要翻译: 用于管理来自多个发电机的多个功率需求单元的电力分配的虚拟电力基础设施包括具有对功率需求单元的逻辑描述的需求管理器,其中需求管理器被配置为确定电力的功率负载需求 使用功率要求单元的逻辑描述的要求苛刻的单元,以及具有发电机的逻辑描述的容量管理器。 容量管理器被配置为确定从一个或多个发电机提供给发电机的功率容量的分配,以满足功率需求单元的功率负载需求,同时满足与至少一个功率发生器相关联的一个或多个预定约束 电力要求单位和发电机。
-
7.
公开(公告)号:US20110099043A1
公开(公告)日:2011-04-28
申请号:US12999615
申请日:2008-06-17
CPC分类号: G06Q10/06 , G06Q10/0635 , G06Q99/00
摘要: In a method of managing a structure having an infrastructure system, a plurality of candidate components configured to provide redundancy to the infrastructure system are identified. Reliability levels of the structure are evaluated with a plurality of different combinations of candidate components. In addition, the structure is managed based upon the evaluated reliability levels.
摘要翻译: 在管理具有基础设施系统的结构的方法中,识别被配置为向基础设施系统提供冗余的多个候选组件。 利用候选部件的多种不同组合来评估结构的可靠性水平。 另外,基于评估的可靠性水平来管理结构。
-
公开(公告)号:US09063715B2
公开(公告)日:2015-06-23
申请号:US12813012
申请日:2010-06-10
CPC分类号: G06F1/26
摘要: A virtual power infrastructure for managing distribution of power to a plurality of power demanding units from a plurality of power generators includes a demand manager having logical descriptions of the power demanding units, in which the demand manager is configured to determine power load demands of the power demanding units using the logical descriptions of the power demanding units, and a capacity manager having logical descriptions of the power generators. The capacity manager is configured to determine allocation of power capacity supplied to the power generators from one or more of the power generators to meet the power load demands of the power demanding units, while satisfying one or more predetermined constraints associated with at least one of the power demanding units and the power generators.
摘要翻译: 用于管理来自多个发电机的多个功率需求单元的电力分配的虚拟电力基础设施包括具有对功率需求单元的逻辑描述的需求管理器,其中需求管理器被配置为确定电力的功率负载需求 使用功率要求单元的逻辑描述的要求苛刻的单元,以及具有发电机的逻辑描述的容量管理器。 容量管理器被配置为确定从一个或多个发电机提供给发电机的功率容量的分配,以满足功率需求单元的功率负载需求,同时满足与至少一个功率发生器相关联的一个或多个预定约束 电力要求单位和发电机。
-
公开(公告)号:US20100305923A1
公开(公告)日:2010-12-02
申请号:US12744898
申请日:2007-11-27
申请人: Amip Shah , Ratnesh Kumar Sharma , Chih C. Shih , Cullen E. Bash , Chandrakant Patel , Abdlmonem Beitelal
发明人: Amip Shah , Ratnesh Kumar Sharma , Chih C. Shih , Cullen E. Bash , Chandrakant Patel , Abdlmonem Beitelal
IPC分类号: G06G7/48
CPC分类号: G06F1/20 , H05K7/20836
摘要: In a method of synthesizing components to design a system meeting an exergy loss target value, one or more candidate sets of components are synthesized and an exergy loss value for each of the one or more candidate sets of components are calculated. A determination as to whether at least one of the candidate set of components meets the exergy loss target value is made and at least one candidate set of components determined to meet the exergy loss target value is identified as the set of components for use in the design of the system.
摘要翻译: 在合成组件以设计满足有效能损失目标值的系统的方法中,合成一个或多个候选组分,并且计算所述一个或多个候选组分组中的每一个的有效能损失值。 确定候选组件中的至少一个是否符合有效能损失目标值,并且确定满足有效能损失目标值的至少一个被确定的组件的候选组被确定为用于设计中的组件集合 的系统。
-
公开(公告)号:US08565931B2
公开(公告)日:2013-10-22
申请号:US12913368
申请日:2010-10-27
申请人: Manish Marwah , Ratnesh Kumar Sharma , Amip J. Shah , Thomas W. Christian , Cullen E. Bash , Chandrakant Patel , Martin Arlitt , Geoff M. Lyon
发明人: Manish Marwah , Ratnesh Kumar Sharma , Amip J. Shah , Thomas W. Christian , Cullen E. Bash , Chandrakant Patel , Martin Arlitt , Geoff M. Lyon
CPC分类号: G06F1/26 , G06F9/4893 , Y02D10/24
摘要: In a method for managing energy demand in an infrastructure, a coefficient of performance (COP) of the infrastructure as a function of time is determined. The COP is a measure of efficiency of the infrastructure. In addition, an energy demand on the infrastructure as a function of time is determined and an energy demand schedule for the infrastructure that temporally reallocates the energy demand based upon the determined COP of the infrastructure is determined.
摘要翻译: 在用于管理基础设施中的能量需求的方法中,确定作为时间的函数的基础设施的性能系数(COP)。 缔约方会议是对基础设施效率的衡量标准。 此外,确定基础设施作为时间的函数的能量需求,并且确定基于确定的基础设施的COP暂时地重新分配能量需求的基础设施的能量需求计划。
-
-
-
-
-
-
-
-
-