-
公开(公告)号:US08010220B1
公开(公告)日:2011-08-30
申请号:US12240852
申请日:2008-09-29
申请人: Ryan Christopher Ames , John Campbell , Yozo Handa , David Wayne Hicks , Hiroshi Kawaguchi , Joseph P. Lewis , Masahiko Minamikawa , Steven Michael Swank , Toshihide Tanaka , Yasushi Nagura
发明人: Ryan Christopher Ames , John Campbell , Yozo Handa , David Wayne Hicks , Hiroshi Kawaguchi , Joseph P. Lewis , Masahiko Minamikawa , Steven Michael Swank , Toshihide Tanaka , Yasushi Nagura
摘要: A parts delivery management system and method that synchronizes production line side parts deliveries with a production schedule to facilitate delivering the right part to the right production line location at the right time. A consolidation center for receiving parts from suppliers is co-located with an assembly plant. Parts are received in returnable containers and organized for line side delivery according to the manufacturer's production schedule. Parts are delivered to production line locations using multi-cart “trains” that transport parts to the locations. Trains made of multiple carts are assembled throughout the production day and loaded with containers holding the parts that are then delivered line side. A delivery management system application executing on a computer receives production schedule data as well as part and container data to determine which parts are needed throughout the day at the various production line side locations and when they are needed.
摘要翻译: 零件交付管理系统和方法,使生产线侧部件交付与生产计划同步,以便在正确的时间将合适的零件交付到正确的生产线位置。 供应商接收零件的合并中心与装配厂共处。 部件在可回收的容器中接收,并根据制造商的生产计划进行线路交付。 部件通过使用将零件运输到位置的多车“火车”运送到生产线位置。 在整个生产日期组装由多个车组成的列车,并装载容纳部件的容器,然后将其运送到线路侧。 在计算机上执行的递送管理系统应用程序接收生产计划数据以及部件和容器数据,以确定在各种生产线侧位置和需要时全天需要哪些部件。