Abstract:
The present invention relates to a method for constructing a continuously reinforced concrete pavement including: the reinforcing steel bar arrangement step of moving reinforcing steel bar introducing/fixing equipment having guide tubes adapted to guide reinforcing steel bars to proper positions thereof and a reinforcing steel bar holding apparatus adapted to apply an instant tensile force to the reinforcing steel bars upon concrete casting to allow the reinforcing steel bars to be located at the proper positions thereof, and longitudinally arranging the reinforcing steel bars; the concrete casting step of casting concrete on top of the reinforcing steel bars arranged in the reinforcing steel bar arrangement step; and the finishing step of flattening the surface of the concrete cast in the concrete casting step by means of a paver.
Abstract:
A method for constructing a continuously reinforced concrete pavement includes: the reinforcing steel bar arrangement step of moving reinforcing steel bar introducing/fixing equipment having guide tubes adapted to guide reinforcing steel bars to proper positions thereof and a reinforcing steel bar holding apparatus adapted to apply an instant tensile force to the reinforcing steel bars upon concrete casting to allow the reinforcing steel bars to be located at the proper positions thereof, and longitudinally arranging the reinforcing steel bars; the concrete casting step of casting concrete on top of the reinforcing steel bars arranged in the reinforcing steel bar arrangement step; and the finishing step of flattening the surface of the concrete cast in the concrete casting step by means of a paver.