APPARATUS AND JOB SCHEDULING METHOD THEREOF
    1.
    发明申请
    APPARATUS AND JOB SCHEDULING METHOD THEREOF 审中-公开
    装置和作业调度方法

    公开(公告)号:US20150331719A1

    公开(公告)日:2015-11-19

    申请号:US14800002

    申请日:2015-07-15

    IPC分类号: G06F9/50

    摘要: An apparatus and a job scheduling method are provided. For example, the apparatus is a multi-core processing apparatus. The apparatus and method minimize performance degradation of a core caused by sharing resources by dynamically managing a maximum number of jobs assigned to each core of the apparatus. The apparatus includes at least one core including an active cycle counting unit configured to store a number of active cycles and a stall cycle counting unit configured to store a number of stall cycles and a job scheduler configured to assign at least one job to each of the at least one core, based on the number of active cycles and the number of stall cycles. When the ratio of the number of stall cycles to a number of active cycles for a core is too great, the job scheduler assigns fewer jobs to that core to improve performance.

    摘要翻译: 提供了一种装置和作业调度方法。 例如,该装置是多核处理装置。 该装置和方法通过动态地管理分配给设备的每个核心的最大数量的作业来最小化共享资源所引起的核心性能下降。 所述设备包括至少一个核心,其包括被配置为存储多个活动周期的活动周期计数单元和被配置为存储多个失速周期的失速循环计数单元,以及作业调度器,其被配置为将至少一个作业分配给 至少一个核心,基于活动周期的数量和失速周期的数量。 当停顿周期数与核心的活动周期数之比太大时,作业调度程序为该核心分配较少的作业以提高性能。

    APPARATUS AND JOB SCHEDULING METHOD THEREOF
    4.
    发明申请
    APPARATUS AND JOB SCHEDULING METHOD THEREOF 有权
    装置和作业调度方法

    公开(公告)号:US20140337849A1

    公开(公告)日:2014-11-13

    申请号:US14276522

    申请日:2014-05-13

    IPC分类号: G06F9/46

    摘要: An apparatus and a job scheduling method are provided. For example, the apparatus is a multi-core processing apparatus. The apparatus and method minimize performance degradation of a core caused by sharing resources by dynamically managing a maximum number of jobs assigned to each core of the apparatus. The apparatus includes at least one core including an active cycle counting unit configured to store a number of active cycles and a stall cycle counting unit configured to store a number of stall cycles and a job scheduler configured to assign at least one job to each of the at least one core, based on the number of active cycles and the number of stall cycles. When the ratio of the number of stall cycles to a number of active cycles for a core is too great, the job scheduler assigns fewer jobs to that core to improve performance.

    摘要翻译: 提供了一种装置和作业调度方法。 例如,该装置是多核处理装置。 该装置和方法通过动态地管理分配给设备的每个核心的最大数量的作业来最小化共享资源所引起的核心性能下降。 所述设备包括至少一个核心,其包括被配置为存储多个活动周期的活动周期计数单元和被配置为存储多个失速周期的失速循环计数单元,以及作业调度器,其被配置为将至少一个作业分配给 至少一个核心,基于活动周期的数量和失速周期的数量。 当停顿周期数与核心的活动周期数之比太大时,作业调度程序为该核心分配较少的作业以提高性能。