-
公开(公告)号:US20210247740A1
公开(公告)日:2021-08-12
申请号:US17260744
申请日:2019-04-29
Inventor: Shun JIA , Yujie ZHENG , Chao LIU , Qinghe YUAN , Zhiqiang WANG , Xiaoyuan MA , Li ZHANG , Haiyang WANG
IPC: G05B19/4155 , G06K7/10
Abstract: A load-energy efficiency evaluation and monitoring method includes an actual part processing number and a theoretical part processing number of the numerical control machine tool within an evaluation period are obtained to calculate a loading performance of the numerical control machine tool. A waste time value and a standby power value of the numerical control machine tool are obtained to calculate a waste energy value of the numerical control machine tool. A single-part actual processing energy consumption is obtained and used, together with a single-part ideal processing energy consumption, to calculate the load-energy efficiency of the numerical control machine tool. A relationship model between the load-energy efficiency and the loading performance of the numerical control machine tool is built based on the obtained model of the load-energy efficiency of the numerical control machine tool and the obtained model of the loading performance of the numerical control machine tool.