公开(公告)号:US12027857B2
公开(公告)日:2024-07-02
申请号:US17372458
申请日:2021-07-10
申请人: STATE GRID GANSU ELECTRIC POWER RESEARCH INSTITUTE , STATE GRID GANSU ELECTRIC POWER COMPANY , State Grid Qinghai Electric Power Research Institute , State Grid Qinghai Electric Power Company , State Grid Corporation of China
发明人: Jien Niu , Qiang Zhou , Yanqi Zhang , Junhong Duan , Long Zhao , Diangang Hu , Jianjun Wu , Jinping Zhang , Zhicheng Ma , Xushan Han , Jun Song , Qingquan Lv , Ruixiao Zhang , Yanhong Ma , Jianmei Zhang , Guodong Wu , Pengfei Gao , Chengjia Bao , Weicheng Shen , Jin Li , Kequan Liu , Xiaodong Pang
CPC分类号: H02J3/0012 , G05B13/042 , G06N3/126 , H02J13/00002
摘要: A method for controlling peak saving by wind power grid. The method includes: S1: evaluating dispatchability of a cluster virtual wind power unit; S2: developing a method for calculating a dispatchability index of the cluster virtual wind power unit; S3: analyzing a source-load peak-shaving resource strategy; and S4: distributing a control strategy for tie-line peak shaving. The present disclosure has the following beneficial effects: In the present disclosure, real-time dispatchability of wind power participating in real-time power balance is first analyzed, specific evaluation indexes and calculation methods are provided, and calculation examples are given for verification. Then, an optimized real-time dispatch strategy is provided based on demand-side response resources, and DC and AC tie-lines are coordinated for operation. The peak shaving control method for emergent source-grid coordination when a sending-end power grid is faulty can ensure normal operation.