SYSTEM AND METHOD FOR COMPUTING AND OVERWRITING THE APPEARANCE OF PROJECT TASKS AND MILESTONES
    1.
    发明申请
    SYSTEM AND METHOD FOR COMPUTING AND OVERWRITING THE APPEARANCE OF PROJECT TASKS AND MILESTONES 审中-公开
    用于计算和整理项目任务和里程碑外观的系统和方法

    公开(公告)号:US20140365938A1

    公开(公告)日:2014-12-11

    申请号:US13912130

    申请日:2013-06-06

    IPC分类号: G06F3/0484

    摘要: A computer-implemented system that transforms one or more project plans to create a graphical project view. The appearance of the project view is determined by a default style, one or more style rules applied to each task or milestone in the chart, or both. Once the project view has been created, users may alter its appearance by changing the default style settings, modifying the data-driven style rules, or by manually changing the appearance of selected tasks and milestones to deviate from the default style or style rules. As project plans are updated, the project view may be refreshed to create a new snapshot, or to replace an existing snapshot. As data is refreshed, the system will preserve manual style changes, and will also reapply style rules, which may result in a change to the project view's appearance. Snapshots may have different appearances, based on rules and manual changes.

    摘要翻译: 一个计算机实现的系统,用于转换一个或多个项目计划以创建图形项目视图。 项目视图的外观由默认样式,一个或多个样式规则应用于图表中的每个任务或里程碑,或两者都确定。 创建项目视图后,用户可以通过更改默认样式设置,修改数据驱动样式规则,或通过手动更改所选任务和里程碑的外观来偏离默认样式或样式规则来更改其外观。 随着项目计划的更新,可以刷新项目视图以创建新的快照,或者替换现有的快照。 随着数据刷新,系统将保留手动样式更改,并重新应用样式规则,这可能会导致项目视图的外观更改。 根据规则和手动更改,快照可能会有不同的外观。

    SYSTEM AND METHOD FOR NON-LINEAR AND DISCONTINUOUS PROJECT TIMELINES

    公开(公告)号:US20190130611A1

    公开(公告)日:2019-05-02

    申请号:US15797327

    申请日:2017-10-30

    IPC分类号: G06T11/20 G06Q10/10 G06Q10/06

    摘要: A computer-implemented system that transforms one or more project plans to create a graphical project view. The project view contains a set of markers along a time axis, and one or more time axis rules which define the appearance of discontinuous timespans, non-linear timespans, or both along the time axis. Once created, users may alter its appearance by adding, removing, or changing the time axis rules to modify the set of timespans along the time axis. Timespan adjustment also causes markers to shift horizontally and adjust their widths so that the dates on the time axis always align with the dates of the markers. The system also can create templates containing time axis rules and other settings, but no markers. Templates are used to create new project views from different project plans, while maintaining the same time axis geometry.

    System and Method For Computer Visualization of Project Timelines
    3.
    发明申请
    System and Method For Computer Visualization of Project Timelines 有权
    计算机可视化项目时间表的系统和方法

    公开(公告)号:US20140006938A1

    公开(公告)日:2014-01-02

    申请号:US14018256

    申请日:2013-09-04

    IPC分类号: G06F17/24

    摘要: A computer-implemented method for collecting, animating in chronological sequence, and presenting the progression of events is disclosed. The method includes providing a set of event data to form a database, the data relating to events that constrained, summarized, or led up to some of the events. Then presenting the database graphically to allow user selection and editing of the Event data in the database to create a set of Events to be presented in an animated manner, and then assigning properties to the manner of presentation of the set of Events to be presented in an animated manner to create a movie. The movement of the movie is provided by an engine that moves a cursor along the timeline to represent the forward or backward change of time and displaying a marker representing an Event from Event data contained in the database.

    摘要翻译: 公开了一种用于收集,按时间顺序动画并呈现事件进展的计算机实现的方法。 该方法包括提供一组事件数据以形成数据库,该数据涉及受约束,总结或导致某些事件的事件。 然后以图形方式呈现数据库,以允许用户选择和编辑数据库中的事件数据,以创建一组要以动画方式呈现的事件,然后将属性分配给呈现在一组事件中的方式 一个动画的方式来创建一部电影。 电影的移动由引擎沿着时间线移动光标以表示时间的向前或向后的改变,并且显示表示数据库中包含的事件数据的事件的标记。

    System and method for minimizing text collisions in project timelines

    公开(公告)号:US11016651B1

    公开(公告)日:2021-05-25

    申请号:US17136755

    申请日:2020-12-29

    摘要: A computer-implemented system that transforms one or more project plans to create a graphical project view. The project view contains a set of markers in rows and along a time axis, with each marker having associated text that must be placed into the project view in a manner that does not interfere with other nearby markers or other nearby text. To avoid such collisions, the user may turn on an algorithm that finds an optimal text position by seeking available white space. The user may also choose to invoke one or more escape paths which apply transformations to the conflicting text to either change the amount of space that they require, change the location of the text to a less-crowded location, increase the amount of available whitespace, or a combination of these approaches.

    SYSTEM AND METHOD FOR COMPUTING AND OVERWRITING THE APPEARANCE OF PROJECT TASKS AND MILESTONES
    5.
    发明申请
    SYSTEM AND METHOD FOR COMPUTING AND OVERWRITING THE APPEARANCE OF PROJECT TASKS AND MILESTONES 审中-公开
    用于计算和整理项目任务和里程碑外观的系统和方法

    公开(公告)号:US20160103578A1

    公开(公告)日:2016-04-14

    申请号:US14972068

    申请日:2015-12-16

    IPC分类号: G06F3/0484 G06F3/0481

    摘要: A computer-implemented system that transforms one or more project plans to create a graphical project view. The appearance of the project view is determined by a default style, one or more style rules applied to each task or milestone in the chart, or both. Once the project view has been created, users may alter its appearance by changing the default style settings, modifying the data-driven style rules, or by manually changing the appearance of selected tasks and milestones to deviate from the default style or style rules. As project plans are updated, the project view may be refreshed to create a new snapshot, or to replace an existing snapshot. As data is refreshed, the system will preserve manual style changes, and will also reapply style rules, which may result in a change to the project view's appearance. Snapshots may have different appearances, based on rules and manual changes.

    摘要翻译: 一个计算机实现的系统,用于转换一个或多个项目计划以创建图形项目视图。 项目视图的外观由默认样式,一个或多个样式规则应用于图表中的每个任务或里程碑,或两者都确定。 创建项目视图后,用户可以通过更改默认样式设置,修改数据驱动样式规则,或通过手动更改所选任务和里程碑的外观来偏离默认样式或样式规则来更改其外观。 随着项目计划的更新,可以刷新项目视图以创建新的快照,或者替换现有的快照。 随着数据刷新,系统将保留手动样式更改,并重新应用样式规则,这可能会导致项目视图的外观更改。 根据规则和手动更改,快照可能会有不同的外观。