-
1.
公开(公告)号:US20150252669A1
公开(公告)日:2015-09-10
申请号:US14638337
申请日:2015-03-04
Applicant: Shell Oil Company
Inventor: Phillip Scott FAIR , Robert James DOMBROWSKI , Ernesto Rafael FONSECA OCAMPOS , Alan Clifford REYNOLDS , Darren HUYNH , Lang ZHAN , David Lindsay Alexander LANGILLE , Wayne L. DUMONT
IPC: E21B49/08 , E21B47/06 , E21B47/12 , E21B43/14 , E21B34/12 , E21B33/124 , E21B43/116
CPC classification number: E21B43/14 , E21B43/116 , E21B43/11855 , E21B47/06 , E21B49/008
Abstract: An apparatus may include a tubular, a first isolator connected to the tubular and configured to engage an interior surface of the wellbore, a first pressure gauge connected to the tubular and configured to take multiple pressure readings over a period of time, and a first perforation gun connected to the tubular without compromising the communication of fluid through an inner flow channel of the tubular. A method may include placing the apparatus in a wellbore, and actuating the isolator to provide isolation of a first zone in a formation. The method may include activating the perforation gun to provide fluid communication between an annulus of the wellbore and the zone in the formation. The method may include allowing the pressure gauge to take a plurality of pressure readings over a period of time. Based on the pressure readings, the method may include determining a formation characteristic.
Abstract translation: 装置可以包括管状的第一隔离器,其连接到管状并且被配置成接合井眼的内表面;第一压力表,其连接到管状并被配置成在一段时间内取多个压力读数;以及第一穿孔 枪连接到管,而不损害通过管的内部流动通道的流体的连通。 方法可以包括将设备放置在井眼中,并且致动隔离器以提供地层中的第一区域的隔离。 该方法可以包括激活穿孔枪以提供在井筒的环空和地层中的区域之间的流体连通。 该方法可以包括允许压力计在一段时间内采取多个压力读数。 基于压力读数,该方法可以包括确定地层特征。
-
公开(公告)号:US20130228337A1
公开(公告)日:2013-09-05
申请号:US13781185
申请日:2013-02-28
Applicant: SHELL OIL COMPANY
Inventor: Robert James DOMBROWSKI , Ernesto Rafael FONSECA , John Michael KARANIKAS , Mauricio Jose Farinas MOYA , Barbara Caterina LAMANTIA
IPC: E21B43/26
CPC classification number: E21B43/26 , E21B43/168 , E21B43/17
Abstract: A method of producing hydrocarbons from a tight formation includes injecting a fluid, such as a miscible gas, and retrieving the hydrocarbons. The fluid may be injected into an injection fracture via and retrieved from a recovery fracture. The injection fracture and recovery fractures may be in the same wellbore, the injection fracture may be in a first wellbore and the recovery fracture in a second wellbore, or the injection fracture and recovery fracture may be in a first wellbore and additional injection or recovery fractures may be in a second wellbore.
Abstract translation: 从紧密形成生产烃的方法包括注入诸如混溶气体之类的流体和回收烃。 流体可以通过回收裂缝注入到注射裂缝中并从恢复骨折中取出。 注射断裂和恢复性骨折可能在相同的井眼中,注射断裂可能在第一井眼中,第二井眼中的恢复断裂,或者注入断裂和恢复骨折可能在第一井眼中,并且额外的注射或恢复骨折 可能在第二个井眼。
-