Method for Running Tubulars in Wellbores
    1.
    发明申请
    Method for Running Tubulars in Wellbores 有权
    在井筒中运行管子的方法

    公开(公告)号:US20080115942A1

    公开(公告)日:2008-05-22

    申请号:US11883470

    申请日:2006-02-03

    IPC分类号: E21B19/16

    CPC分类号: E21B43/10 E21B34/06

    摘要: Methods for installing tubulars (for example, conduits, casing or liners) into a highly deviated wellbore are disclosed. In a first embodiment, the method comprises a) drilling the well to the planned total depth of the interval, b) placing a first fluid into the wellbore below a prescribed measured depth in the high-angle portion of the wellbore, said first fluid having a density that causes the portion of the tubular that extends into the first fluid to become substantially neutrally buoyant, c) placing a second fluid into the wellbore above the prescribed measured depth, said second fluid having a density less than said first fluid, d) plugging the distal portion of the tubular with a lower plug (or check valve) and an upper plug, e) as the tubular is run into the wellbore, placing a lightweight fluid into the plugged section of tubular and a heavy fluid above the plugged section of tubular, and f) running the tubular into the wellbore to the planned total depth.

    摘要翻译: 公开了将管(例如,管道,套管或衬管)安装到高度偏离的井筒中的方法。 在第一实施例中,该方法包括:a)将井钻井到所述间隔的预定总深度,b)将第一流体放置在所述井筒的高角度部分中规定的测量深度以下的所述井筒内,所述第一流体具有 使得延伸到第一流体中的管状部分的密度变得基本上是中性浮力的密度,c)将第二流体置于高于规定测量深度的井眼中,所述第二流体的密度小于所述第一流体,d) 当管状物进入井眼时,用下塞(或止回阀)和上塞塞塞住管状物的远端部分,将轻质流体放置在管状物的堵塞部分中,并在堵塞部分上方形成重质流体 的管状,以及f)将管状物运入井筒至计划的总深度。

    Method for running tubulars in wellbores
    2.
    发明授权
    Method for running tubulars in wellbores 有权
    在井筒中运行管子的方法

    公开(公告)号:US07789162B2

    公开(公告)日:2010-09-07

    申请号:US11883470

    申请日:2006-02-03

    IPC分类号: E21B7/04

    CPC分类号: E21B43/10 E21B34/06

    摘要: Methods for installing tubulars into a highly deviated wellbore may include a) drilling the well to the planned total depth of the interval, b) placing a first fluid into the wellbore below a prescribed measured depth in the high-angle portion of the wellbore, c) placing a second fluid into the wellbore above the prescribed measured depth, d) plugging the distal port ion of the tubular with a lower plug and an upper plug, e) as the tubular is run into the wellbore, placing a lightweight fluid into the plugged section of tubular and a heavy fluid above the plugged section of tubular, and f) running the tubular into the wellbore to the planned total depth. The first fluid has a density that causes the portion of the tubular that extends into the first fluid to become substantially neutrally buoyant, and the second fluid has a density less than the first fluid.

    摘要翻译: 将管道安装到高度偏离的井筒中的方法可以包括:a)将井钻井到所述间隔的计划总深度,b)将第一流体置于井筒的高角度部分中规定的测量深度以下的井眼中,c )将第二流体放置在高于规定的测量深度的井眼中,d)用下塞和上塞塞塞管管的远端离子,e)当管子进入井眼时,将轻质流体放入 管状的堵塞部分和管状物的堵塞部分上方的重质流体,以及f)将管道运行到井筒中至计划的总深度。 第一流体具有使得延伸到第一流体中的管状部分变得基本上中性浮力的密度,并且第二流体的密度小于第一流体。