-
公开(公告)号:US11797500B2
公开(公告)日:2023-10-24
申请号:US17896445
申请日:2022-08-26
Applicant: T-Mobile USA, Inc.
Inventor: Debadrita Roy , Kevin Pearson , Venkat Mondreti
IPC: G06F16/21 , H04W24/02 , G06F16/215 , H04L67/306 , G06F16/26 , H04L67/30
CPC classification number: G06F16/215 , G06F16/26 , H04L67/306 , H04W24/02
Abstract: The system ensures database validity by obtaining a data structure representing data processing blocks and a data flow among the data processing blocks. A first data processing block includes a first data input and the second data processing block includes a second data output. The system obtains controls associated with the data structure, where a first control corresponds to the first data output, and a second control corresponds to the second data input. The system obtains data to be processed by the first data processing block, processes the data through the first data processing block, and executes the first control based on the processed data. Based on the execution, the system determines whether the processed data satisfies the first control. If the processed data does not satisfy the first control, the system generates an alert indicating a problem with the output data validity.
-
公开(公告)号:US20230252414A1
公开(公告)日:2023-08-10
申请号:US17666435
申请日:2022-02-07
Applicant: T-Mobile USA, Inc.
Inventor: Prashant Kulkarni , Debadrita Roy , Sreevidya Baladhandapani , Sampath Devadiga , Yehuda Maor
CPC classification number: G06Q10/101 , G06F8/30 , G06F8/77 , G06F11/3684 , G06Q10/103 , H04L67/36 , H04L67/327
Abstract: A method performed by a platform for real-time intake capacity assessment of a project includes routing, to a service desk, a request to assess capacity for the project. In response, an electronic message is communicated with a link to a form to retrieve structured information about the project. An assessment template is populated with structured information that includes feature-level information of the project (e.g., a level-of-effort (LOE) for developing a software product). The platform can dynamically estimate a capacity measure for the project, which is then used to generate a visualization on a dashboard based on the estimate of the capacity measure. As such, the platform enables better decision-making, planning, and prioritization.
-
公开(公告)号:US20220414073A1
公开(公告)日:2022-12-29
申请号:US17896445
申请日:2022-08-26
Applicant: T-Mobile USA, Inc.
Inventor: Debadrita Roy , Kevin Pearson , Venkat Mondreti
IPC: G06F16/215 , H04L67/306 , G06F16/26 , H04W24/02
Abstract: The system ensures database validity by obtaining a data structure representing data processing blocks and a data flow among the data processing blocks. A first data processing block includes a first data input and the second data processing block includes a second data output. The system obtains controls associated with the data structure, where a first control corresponds to the first data output, and a second control corresponds to the second data input. The system obtains data to be processed by the first data processing block, processes the data through the first data processing block, and executes the first control based on the processed data. Based on the execution, the system determines whether the processed data satisfies the first control. If the processed data does not satisfy the first control, the system generates an alert indicating a problem with the output data validity.
-
公开(公告)号:US20240264803A1
公开(公告)日:2024-08-08
申请号:US18634753
申请日:2024-04-12
Applicant: T-Mobile USA, Inc.
Inventor: Prashant Kulkarni , Debadrita Roy , Sreevidya Baladhandapani , Sampath Devadiga , Yehuda Maor
CPC classification number: G06F8/30 , G06F8/77 , G06F11/3684 , G06Q10/101 , G06Q10/103 , H04L67/63 , H04L67/75
Abstract: A method performed by a platform for real-time intake capacity assessment of a project includes routing, to a service desk, a request to assess capacity for the project. In response, an electronic message is communicated with a link to a form to retrieve structured information about the project. An assessment template is populated with structured information that includes feature-level information of the project (e.g., a level-of-effort (LOE) for developing a software product). The platform can dynamically estimate a capacity measure for the project, which is then used to generate a visualization on a dashboard based on the estimate of the capacity measure. As such, the platform enables better decision-making, planning, and prioritization.
-
公开(公告)号:US11977858B2
公开(公告)日:2024-05-07
申请号:US17666435
申请日:2022-02-07
Applicant: T-Mobile USA, Inc.
Inventor: Prashant Kulkarni , Debadrita Roy , Sreevidya Baladhandapani , Sampath Devadiga , Yehuda Maor
CPC classification number: G06F8/30 , G06F8/77 , G06F11/3684 , G06Q10/101 , G06Q10/103 , H04L67/63 , H04L67/75
Abstract: A method performed by a platform for real-time intake capacity assessment of a project includes routing, to a service desk, a request to assess capacity for the project. In response, an electronic message is communicated with a link to a form to retrieve structured information about the project. An assessment template is populated with structured information that includes feature-level information of the project (e.g., a level-of-effort (LOE) for developing a software product). The platform can dynamically estimate a capacity measure for the project, which is then used to generate a visualization on a dashboard based on the estimate of the capacity measure. As such, the platform enables better decision-making, planning, and prioritization.
-
公开(公告)号:US11461297B1
公开(公告)日:2022-10-04
申请号:US17343140
申请日:2021-06-09
Applicant: T-Mobile USA, Inc.
Inventor: Debadrita Roy , Kevin Pearson , Venkat Mondreti
IPC: G06F16/21 , G06F16/215 , H04L67/306 , H04W24/02 , G06F16/26 , H04L67/30
Abstract: The system ensures database validity by obtaining a data structure representing data processing blocks and a data flow among the data processing blocks. A first data processing block includes a first data input and the second data processing block includes a second data output. The system obtains controls associated with the data structure, where a first control corresponds to the first data output, and a second control corresponds to the second data input. The system obtains data to be processed by the first data processing block, processes the data through the first data processing block, and executes the first control based on the processed data. Based on the execution, the system determines whether the processed data satisfies the first control. If the processed data does not satisfy the first control, the system generates an alert indicating a problem with the output data validity.
-
-
-
-
-