-
公开(公告)号:US20160271674A1
公开(公告)日:2016-09-22
申请号:US15167423
申请日:2016-05-27
发明人: Qingxue HUANG , Lin ZHU , Yugui LI , Cunlong ZHOU , Lifeng MA , Guanghui ZHAO , Jiang ZHANG
CPC分类号: B21D13/04 , B21B1/38 , B21B2001/383 , B21B2001/386 , B21H8/005 , B23K9/025 , B23K9/18 , B23K11/11
摘要: A method for preparing a metal composite plate/strip by rolling, comprises the following steps: 1) respectively rolling the composite surfaces of a base plate and a cladding plate to obtain the base plate corrugation and the cladding plate corrugation for mating with each other; 2) cleaning the composite surfaces of the base plate and the cladding plate to expose the metal matrixes; 3) sequentially laminating the base plate and the cladding plate so that the base plate corrugation on the base plate and cladding plate corrugation on the cladding plate mate with each other, compacting, and performing welding sealing treatment to obtain a composite plate slab; 4) rolling the qualified composite plate after inspection by using a compositing machine to a desirable thickness, to obtain a composite plate/strip.
摘要翻译: 一种通过轧制制备金属复合板/带的方法,包括以下步骤:1)分别轧制基板和包层板的复合表面,以获得基板波纹和包层板波纹用于彼此配合; 2)清理基板和包层板的复合表面以暴露金属基体; 3)依次层压基板和包层板,使基板上的基板波纹和包层板上的包层板波纹相互配合,压实,进行焊接密封处理,得到复合板坯; 4)通过使用合成机进行检查后将合格的复合板轧制成合适的厚度,得到复合板/条。
-
公开(公告)号:US20170297121A1
公开(公告)日:2017-10-19
申请号:US15641308
申请日:2017-07-04
发明人: Qingxue HUANG , Lifeng MA , Jinli MENG , Zhibing CHU , Heyong HAN , Hongjie LI , Yugui LI
CPC分类号: B23D15/06 , B23D15/04 , B23D15/08 , B23D15/14 , B23D33/02 , B23D35/005 , B23D36/0008 , B23K26/38
摘要: Hydraulic two-side rolling-cut shears, including: a front transport roller device, a rear transport roller device, a shear body, and a roller carrier. The front transport roller device includes a laser scriber, a magnetic alignment device, and a pinch roller device. The rear transport roller device includes a vertical guide roller. The laser scriber is disposed on the front end of the front transport roller device. The magnetic alignment device is disposed in the middle part of the front transport roller device. The pinch roller device is disposed on the rear end of the front transport roller device in front of the shear body. The roller carrier is disposed longitudinally in the middle of the shear body. The vertical guide roller is disposed on the rear transport roller device and behind the shear body.
-