-
公开(公告)号:US09056385B2
公开(公告)日:2015-06-16
申请号:US14131756
申请日:2012-06-22
IPC分类号: B24B5/37 , B24B51/00 , B24B49/03 , B24B49/05 , B24B19/06 , B24B49/02 , B23Q15/04 , G05B19/404 , B24B5/40
CPC分类号: B24B51/00 , B23Q15/04 , B24B5/37 , B24B5/40 , B24B19/06 , B24B49/02 , B24B49/03 , B24B49/05 , G05B19/404 , G05B2219/34389 , G05B2219/36196 , G05B2219/49319
摘要: Teaching (contacting) operation is performed, and from the contact position (SX), the workpiece (2) is ground by a given “test grinding amount (A).” Subsequently, the diameter of the workpiece is measured. Based on the result of the measurement, the residual amount to be ground (residual grinding amount) to obtain the finished dimensions is calculated, and grinding by the “residual grinding amount (R)” is performed.
摘要翻译: 执行教学(接触)操作,并且从接触位置(SX),通过给定的“测试研磨量(A)”对工件(2)进行磨削。随后,测量工件的直径。 基于测量结果,计算出要获得最终尺寸的待研磨余量(残余研磨量),并通过“残余研磨量(R)”进行研磨。
-
公开(公告)号:US20140148081A1
公开(公告)日:2014-05-29
申请号:US14131756
申请日:2012-06-22
IPC分类号: B24B51/00
CPC分类号: B24B51/00 , B23Q15/04 , B24B5/37 , B24B5/40 , B24B19/06 , B24B49/02 , B24B49/03 , B24B49/05 , G05B19/404 , G05B2219/34389 , G05B2219/36196 , G05B2219/49319
摘要: Teaching (contacting) operation is performed, and from the contact position (SX), the workpiece (2) is ground by a given “test grinding amount (A).” Subsequently, the diameter of the workpiece is measured. Based on the result of the measurement, the residual amount to be ground (residual grinding amount) to obtain the finished dimensions is calculated, and grinding by the “residual grinding amount (R)” is performed.
摘要翻译: 执行教学(接触)操作,并且从接触位置(SX),通过给定的“测试研磨量(A)”对工件(2)进行磨削。随后,测量工件的直径。 基于测量结果,计算出要获得最终尺寸的待研磨余量(残余研磨量),并通过“残余研磨量(R)”进行研磨。
-