-
公开(公告)号:US20210192643A1
公开(公告)日:2021-06-24
申请号:US17190402
申请日:2021-03-03
申请人: TSINGHUA UNIVERSITY
发明人: Ning ZHANG , Jingkun LIU , Yi WANG , Chongqing KANG
摘要: Disclosed is a centralized cloud energy storage system for massive and distributed users and a transaction settlement method thereof, a storage medium, and a terminal. The system includes: a centralized energy storage facility invested and operated by a cloud energy storage service provider; the massive and distributed users; and a power network and a user energy management system connecting the centralized energy storage facility with the massive and distributed users. A user sends a charging and discharging request to the cloud energy storage service provider through the user energy management system, and the cloud energy storage service provider issues a charging and discharging instruction to the centralized cloud energy storage system.
-
公开(公告)号:US20220294224A1
公开(公告)日:2022-09-15
申请号:US17824113
申请日:2022-05-25
申请人: Tsinghua University
发明人: Ning ZHANG , Jingkun LIU , Yi WANG , Chongqing KANG
IPC分类号: H02J3/28 , G05B19/042 , H02J3/00
摘要: An operation decision-making method for centralized cloud energy storage capable of participating in power grid auxiliary services. The method includes: establishing a model predictive control model; obtaining operating parameters of the current period t from a grid control center at a beginning of a current decision-making cycle; predicting operating parameters within the predetermined time range based on historical data; obtaining decision variables according to the model predictive control model, the operating parameters of the current period and the operating parameters within the predetermined time range; setting a charging power of the centralized energy storage facility in the current period t and a discharging power according to the decision variables; obtaining an actual power of the centralized energy storage facility at an end of the current period t through sensors installed on the centralized energy storage facility as a parameter for a next decision period.
-