Balancing reactive current between a DFIG stator and a grid-side inverter

    公开(公告)号:US11233400B2

    公开(公告)日:2022-01-25

    申请号:US16062888

    申请日:2017-05-16

    Abstract: Aspects of the present invention relate to a method for controlling an amount of reactive current provided from a wind turbine generator to a power grid during an abnormal power grid event, said wind turbine generator comprising a doubly-fed induction generator having a rotor and a stator, and a power converter coupling the rotor to the power grid, the power converter comprising a grid-side inverter, wherein the method comprises the step of balancing the reactive current provided to the power grid between a reactive stator current and a reactive grid-side inverter current, wherein the reactive grid-side inverter current is controlled in accordance with a reactive current capacity of a grid breaker receiving the reactive current provided by the grid-side inverter. Aspects of the present invention also relate to a wind turbine generator being capable of performing the method.

    Fault ride through method for load impact minimization

    公开(公告)号:US10704534B2

    公开(公告)日:2020-07-07

    申请号:US16143818

    申请日:2018-09-27

    Abstract: Controlling a wind turbine during a grid fault where the grid voltage drops below a nominal grid voltage. After detection of a grid fault, the total current limit for the power converter output is increased to a total maximum overload current limit. Depending on whether active or reactive current generation is prioritized, an active or reactive current reference is determined. The active current reference is determined in a way so that a reduction in active power production due to the grid voltage drop is minimized and based on the condition that the vector-sum of the active output current and the reactive output current is limited according to the total maximum overload current limit, and a maximum period of time is determined in which the power converter can be controlled based on the active/reactive current references. Afterwards the power converter is controlled based on the active and reactive current references.

    Fault ride through method for load impact minimization

    公开(公告)号:US10570885B2

    公开(公告)日:2020-02-25

    申请号:US16143818

    申请日:2018-09-27

    Abstract: Controlling a wind turbine during a grid fault where the grid voltage drops below a nominal grid voltage. After detection of a grid fault, the total current limit for the power converter output is increased to a total maximum overload current limit. Depending on whether active or reactive current generation is prioritized, an active or reactive current reference is determined. The active current reference is determined in a way so that a reduction in active power production due to the grid voltage drop is minimized and based on the condition that the vector-sum of the active output current and the reactive output current is limited according to the total maximum overload current limit, and a maximum period of time is determined in which the power converter can be controlled based on the active/reactive current references. Afterwards the power converter is controlled based on the active and reactive current references.

    Method for handling an over voltage ride through event

    公开(公告)号:US10199970B2

    公开(公告)日:2019-02-05

    申请号:US15563754

    申请日:2016-03-08

    Abstract: The present invention relates to a method for operating a doubly fed induction generator wind power facility during an OVRT event, said the wind turbine facility being adapted to inject active and/or reactive current into an associated grid, the method comprising the steps of determining the occurrence of an over voltage grid event, and maintaining a grid-side inverter of the doubly fed induction generator wind power facility fully operable during the over voltage ride though event so as to maintain a controllable active and/or reactive current capability during the over voltage grid event.

Patent Agency Ranking