-
1.
公开(公告)号:US20160266630A1
公开(公告)日:2016-09-15
申请号:US14707051
申请日:2015-05-08
Applicant: VMWARE, INC.
Inventor: HEMANTH KUMAR PANNEM , KUMAR GAURAV , BHASKARDAS KAMBIVELU
Abstract: A power distribution unit having a power supply inputs including mains, secondary, generator, and renewable can be configured to measure how much power is drawn from each of the power supply inputs over a time period and to provide data to a unit rate of power engine indicating the same. A cost information engine can be configured to provide cost information, applicable over the time period, for each of the power supply inputs to the unit rate of power engine. The unit rate of power engine can be configured to compute the unit rate of power consumed in the data center over the time period based on the power drawn from each of the power supply inputs and the cost information.
Abstract translation: 具有包括电源,次级,发电机和可再生电力的电源输入的配电单元可以被配置为测量在一段时间内从每个电源输入抽取多少功率并且向电力发动机的单位速率提供数据 表示相同。 成本信息引擎可以配置成为每个电源输入提供功率发动机的单位速率的成本信息,在时间段内适用。 电力发动机的单位率可以被配置为基于从每个电源输入和成本信息获得的功率来计算数据中心在该时间段内消耗的功率的单位率。
-
2.
公开(公告)号:US20160103711A1
公开(公告)日:2016-04-14
申请号:US14554075
申请日:2014-11-26
Applicant: VMWARE, INC.
Inventor: KUMAR GAURAV , HEMANTH KUMAR PANNEM , BHASKARDAS KAMBIVELU
CPC classification number: G06F9/4893 , G06F1/329 , Y02D10/00 , Y02D10/24
Abstract: Methods and systems of determining an optimum power-consumption profile for virtual machines running in a data center are disclosed. In one aspect, a power-consumption profile of a virtual machine and a unit-rate profile of electrical power cost over a period are received. The methods determine an optimum power-consumption profile based on the power-consumption profile and the unit-rate profile. The optimum power-consumption profile may be used reschedule the virtual machine over the period.
Abstract translation: 公开了确定在数据中心中运行的虚拟机的最佳功耗曲线的方法和系统。 一方面,接收虚拟机的功耗曲线和一段时间内的电力成本的单位率曲线。 这些方法基于功耗曲线和单位速率曲线确定最佳功耗曲线。 可以使用最佳功耗曲线在这段时间内重新安排虚拟机。
-