-
公开(公告)号:US11862973B2
公开(公告)日:2024-01-02
申请号:US17333510
申请日:2021-05-28
Applicant: XIANGTAN UNIVERSITY
Inventor: Juan Zou , Xu Yang , Tingrui Pei , Jinhua Zheng , Zhongbing Liu
Abstract: The present disclosure discloses a method for optimizing equipment capacity and equipment power of an energy hub system. The method includes establishing an energy hub model containing natural gas boilers, electric boilers, coolers and heat pumps, establishing a bilevel optimized upper model to solve the optimal heat pump capacity, and establishing a bilevel optimized lower model to solve the optimal power utilization of each energy device based on the binary search algorithm of the quadratic function solves the upper model by using the multi-objective evolutionary algorithm NSGA-II to solve the lower model. The optimization method of the present invention can solve the multi-objective bilevel model problem without the help of commercial optimization software. Obtaining a reasonable, efficient and green planning scheme makes the total operating cost and total exhaust gas emissions of the energy hub relatively optimal.