In a method for producing a plurality of concrete cast elements of prestressed concrete, in particular for producing of railway sleepers, in a long bed which is a multiple of the length of a concrete cast element, in which separating elements are installed in the long bed to define the length of each of the concrete cast elements to be casted, a first and a second separating element for defining the length of a concrete cast element together with a tensioning device with tensioning elements for tensioning the concrete cast element between the two separating elements are mounted in the long bed, whereupon the concrete cast element is cast between the two separating elements and is at least partially hardened in the long bed.
摘要:
The method according to the invention for producing a prestressed concrete workpiece is characterized in that the prestress is created by a heat treatment, wherein the concrete and the reinforcement therefor are selected in such a way that, when cooling the concrete workpiece from an elevated temperature, the heat expansion coefficient of the concrete is less than that of the reinforcement, and in that, during cooling, the concrete and the reinforcement adhere sufficiently strongly to one another if, during cooling, the concrete is hydrated at least to such an extent in order to be able to expand the reinforcement on account of the different heat expansion coefficients, and in that the concrete, together with the reinforcement, is brought to the elevated temperature in such a way that and is hydrated during cooling at least to such an extent that it is prestressed by the reinforcement after cooling.
摘要:
A pre-stressed concrete body is disclosed. The concrete body is elongated with a first end and an opposite second end. A plurality of reinforcement strands within the concrete body extend from the first end to the second end and impart a compressive force. A baseplate is disposed on the first end, and has a plurality of first fastener receiving holes and a plurality of second fastener receiving holes.
摘要:
A method for the production of prestressed concrete products and a plant for implementing the method. Moulds provided with pretensioned wires are moved through fixed casting machines into a hardening space. In the hardening space, the combination of mould and product is lifted sideways from the casting line before hardening, using synchronised lifting equipment. The combination may be stacked for space economy. After hardening, the product is removed from the mould using the same lifting equipment. The moulds are returned to the beginning of the casting line, during which stage they are cleaned and refurbished. The products are transferred to cutting and finishing stations.
摘要:
A mold bed for fabricating pre-stressed concrete elements has a mold frame (8) that extends between the ends of the bed. Tensioning heads are mounted at the bed ends for tensioning reinforcement ropes or lines (10) extending in the mold cavity. The mold frame (8) includes longitudinally extending beam elements (4) that take up pressure forces which constitute counter-pressure forces that are generated by the tension forces that are taken up by the tensioning heads when tensioning the ropes. These beam elements have the form of long bars (4), e.g., bars of rectangular profiles, that are surrounded by continuously or discontinuously extending sleeve elements (5). The bars (4) are therewith prevented from buckling or breaking sideways as a result of the pressure forces generated by the tension in the ropes (10). The sleeve elements (5) are stiffened by means of anchoring devices (14) that engage in the underlying surface. A layer or coating of nylon for instance is applied between the bars (4) and the sleeve elements so as to facilitate relative movement between the bars and the sleeve elements. Alternatively, wheels or rollers may be used to this end.
摘要:
A precast, prestressed concrete joist having web openings through which mechanical and electrical equipment may pass. In an exemplary embodiment, the joist comprises generally horizontal opposite top and bottom concrete members with a concrete web interposed between them. This web may have openings through which mechanical and electrical equipment may pass. Prestress steel strands may extend lengthwise through both the top and bottom members to provide prestress in the concrete joist. The concrete joist may further comprise strand restraining devices for deflecting the prestress steel strands. The precast, prestressed concrete joist having a web opening may be constructed using a reusable casting apparatus. This casting apparatus comprises a prestressing bed onto which a frame may be mounted. The frame provides a means of applying tension to the prestress steel strands and of supporting prestress strand restraining devices. A mold comprising an outer form and web opening forms may be attached to the prestressing bed. This mold may be used to cast the joist. The web opening forms preferably comprise a plurality of blocks which may be specially shaped to be removably attached together and secured to the prestressing bed to increase or decrease the span and depth of the desired web openings. The precast, prestressed concrete joist may be fabricated by first assembling the frame on a prestressing bed. The mold may next be assembled inside the frame. Strand restraining devices may be bolted to the frame by threaded rods. Prestress strands may then be threaded through these strand restraining devices and anchored to the frame. A prestressing force may then be applied to the prestress strands. Concrete is then poured into the mold and allowed to cure. The frame and mold are removed from around the finished joist.
摘要:
A method for the manufacture of pretensioned prestressed concrete sleepers wherein, the tensioning wires are taken directly from one or more rolls of wire and are introduced in a longitudinal feed into a tensioning frame, and the tensioning wires (5) are initially anchored at the end thereof located at the front in feed direction. The wires are tensioned by a tensioning device arranged outside of the tensioning frame and resting against the opposite end thereof, and the wires (5) are anchored at the tensioning device; only then are the wires severed by means of a severing device. In this manner, it is possible to combine in a single station the operating stages of cutting to length, introducing and tensioning the wires, which stages in the past were distributed over several manufacturing stations, so that the labor intensive and time consuming manipulation of wires which have been previously cut to length is eliminated.
摘要:
A plant to manufacture elongated concrete elements, particularly railway sleepers of prestressed reinforced concrete. In the plant according to the invention, the forms for the production of said elements are supported on carriages sliding along parallel side-by-side tracks, and the operating machines designed to perform in succession a series of operations on said forms are positioned into a limited working area, housed inside a shed, and are mounted above said tracks, substantially fixed in respect of the longitudinal axis of the tracks but movable transversely thereto. The curing area for the concrete elements is arranged externally to the working area. In the case of prestressed reinforced concrete elements, the tensioning device for the reinforcement strands are mounted directly on each of said slidable carriages supporting the forms.
摘要:
Prestressed concrete railroad ties are formed in molds which are supported by existing track near the area where they are to be installed. Each mold will form a number of ties. Reinforcing strands are located within a plurality of longitudinally spaced molds. Concrete is then poured into the molds and the ties are formed bottoms up in the molds. A group of ties are simultaneously removed from a given mold by a special extractor which first simultaneously clamps the reinforcing strands extending outwardly from a given mold, and then lifts the strands as a group from the mold by a suitable crane. Preferably the center of gravity of ties is spaced from a pivot point which will cause 180.degree. rotation locating the ties in upright position to be loaded on a railway car or other vehicle to take them to the site where they are to be installed.
摘要:
A portable system for making harped, reinforced concrete beams includes a series of inverted T-shaped concrete bed sections, with aligned longitudinally extending holes for receiving tensioning cables to hold the sections together, to provide two beds, one on either side of the center wall of the sections, to make the concrete beams. At points near the center of each beam to be formed, arrangements for "harping" or depressing the longitudinally extending tensioning steel strands or cables are provided. The harping arrangements include a lever pivotally mounted on the central wall of the concrete sections to pivot in either direction to alternatively harp beams on either side, with intermediate lever actuated arrangements including a harping fork for engaging the steel strands, and screw threaded arrangements at the outer end of the lever for pulling the lever down toward the outer edge of the concrete bed, thereby depressing and harping the tensioning steel strands which are to be embedded in the concrete beams.