Flange-to-flange connection of precast concrete members

    公开(公告)号:US09903119B2

    公开(公告)日:2018-02-27

    申请号:US15139173

    申请日:2016-04-26

    摘要: Flange-to-flange connectors and construction methods using such connectors are disclosed. The connector may include a first and second anchored plates secured to a first and second sets of anchoring bars. The connector may also include a first and second alignment plates configured to mate with the first and second anchored plates. The connector may further include at least one shim configured to be positioned between the first and second anchored plates. A bolt may be configured to secure the first and second alignment plates with the first and second anchored plates, respectively, and when the bolt is tightened, the bolt pulls the first and second alignment plates and the first and second anchored plates together to form a rigid connection, which may eliminate the need to form and cure concrete at job sites, allowing the time, cost, and construction complexity to be reduced significantly compared to conventional connection systems.

    Adjustable Dap Assembly
    7.
    发明申请

    公开(公告)号:US20170241139A1

    公开(公告)日:2017-08-24

    申请号:US15436803

    申请日:2017-02-18

    申请人: Edwin Moyano

    发明人: Edwin Moyano

    IPC分类号: E04C5/06 E04B5/04 E04B1/06

    摘要: A vertically adjustable steel reinforcing assembly, especially adapted for effective use with dapped beam ends. The reinforcing assembly includes an upper assembly and a lower assembly. Running vertically through the center of each of the assemblies are aligning pin holes. Assembly is configured at the time of casting to accommodate most recent dap design.

    Panel lifting process
    9.
    发明授权
    Panel lifting process 有权
    面板提升过程

    公开(公告)号:US09469987B2

    公开(公告)日:2016-10-18

    申请号:US14827770

    申请日:2015-08-17

    摘要: This invention relates to a process for the lifting of a dual concrete panel composite truss and especially to the process of lifting of a composite truss having a pair of spaced apart prestressed concrete panels. A lifting assembly can be rolled on the surface of a generally flat concrete panel to position a plurality of sling hooks for connection to a plurality of said lifting eye members on the generally flat concrete panel for lifting the concrete panel.

    摘要翻译: 本发明涉及一种用于提升双混凝土板复合桁架的方法,特别涉及提升具有一对间隔开的预应力混凝土板的复合桁架的方法。 提升组件可以在大体上平坦的混凝土面板的表面上滚动以定位多个吊钩,用于连接到大体上平坦的混凝土面板上的多个所述提升眼部件,用于提升混凝土面板。

    CONCRETE DECK FOR AN INTEGRATED BUILDING SYSTEM ASSEMBLY PLATFORM
    10.
    发明申请
    CONCRETE DECK FOR AN INTEGRATED BUILDING SYSTEM ASSEMBLY PLATFORM 审中-公开
    一体化建筑系统装配平台的混凝土结构

    公开(公告)号:US20160251853A1

    公开(公告)日:2016-09-01

    申请号:US15148546

    申请日:2016-05-06

    申请人: Aditazz, Inc.

    摘要: Embodiments of a method for constructing a floor in a steel framed building are disclosed. In an embodiment, the method includes placing a modular concrete deck platform on horizontal beams and girders of a steel framed building, the modular concrete deck platform having a perimeter shape that corresponds to dimensions of a bay of the steel framed building. Shear connector openings located on the sides of the modular concrete deck expose a portion of the top surface. The shear connector openings are recesses on side surfaces of the modular concrete deck platform and a shear connector rebar extends out of each shear connector opening. The method further includes, after the modular concrete deck platform is placed on the horizontal beams and girders, attaching shear connections to the horizontal beams and girders of the steel framed building in the exposed portion of the top surface and within the closed loop.

    摘要翻译: 公开了一种用于在钢结构建筑物中构造地板的方法的实施例。 在一个实施例中,该方法包括将模块化混凝土甲板平台放置在钢结构建筑物的水平梁和桁架上,该模块化混凝土甲板平台具有对应于钢框架建筑物的间隔的尺寸的周边形状。 位于模块化混凝土甲板侧面的剪切连接器开口暴露了顶部表面的一部分。 剪切连接器开口是在模块化混凝土甲板平台的侧表面上的凹槽,并且剪切连接器钢筋从每个剪切连接器开口延伸出来。 该方法还包括在模块化混凝土甲板平台放置在水平梁和桁架上之后,将附接的剪切连接件连接到钢框架建筑物的水平梁和梁的顶部表面的暴露部分中并在闭环内。