公开(公告)号:WO2021071361A1
公开(公告)日:2021-04-15
申请号:PCT/NL2020/050626
申请日:2020-10-09
Applicant: SPT EQUIPMENT BV , VAN BLAADEREN, Engel Albert
Inventor: VAN BLAADEREN, Engel Albert
Abstract: Unity of a group of at least two or three suction buckets (7) and a pump system (1) of which a central device (10) is temporary connected by convenient means, e.g. a suction pipe (5, 9), to 5 the suction space of all the suction buckets of the group simultaneously, preferably wherein the complete pump system, or at least the central device, rests on top of the top bulkhead (6) of the upward extending suction bucket. The pump system comprises pump modules, each containing a private pump and pump 10 drive to generate the required suction and connected to a relevant bucket. The central device (10), enclosed within a protective frame, and the pump modules being mutually separate and remote.
-
公开(公告)号:WO2020161340A1
公开(公告)日:2020-08-13
申请号:PCT/EP2020/053210
申请日:2020-02-07
Applicant: PETRODEC B.V.
Inventor: LE GAL, Jean-Christophe
Abstract: Structure and method for decommissioning offshore platforms presenting topsides (12) mounted on a jacket having a plurality of jacket legs. The offshore decommissioning structure comprises a jack-up-vessel (1) comprising a hull, a main deck (5), an elevating jacking device and a plurality of jack-up legs, wherein said jack-up vessel (1) is elevated on its legs above the sea level by the elevating jacking device. Furthermore, the structure comprises a carrying and skidding system for shifting the topsides (12)from the platform jacket onto the main deck (5) of the jack-up vessel (1).Besides, the method comprises the following steps: position the jack-up vessel (1) close to the platform (12); position skid beams (18) on jack-up main deck (5) relative to the platform legs; push jacket skid beams toward the jacket legs;cut the platform jacket legs below the topside (12); and shift the topsides (12) on the skid beams (18) to the jack-up main deck (5).
-
73.
公开(公告)号:WO2020160857A1
公开(公告)日:2020-08-13
申请号:PCT/EP2020/050177
申请日:2020-01-07
Applicant: INNOGY SE
Inventor: BARTMINN, Daniel
Abstract: Die Erfindung betrifft ein Verfahren zur Bildung einer Verbindung (3,20) zwischen zwei Rohrsegmenten (1,2,21,22) unterschiedlicher Weite, vorzugsweise eines turmartigen Bauwerks, insbesondere einer Windkraftanlage. Um Rohrsegmente unterschiedlicher Weite einfacher, zuverlässiger und kostengünstiger miteinander verbinden zu können, ist vorgesehen, dass das weitere Rohrsegment (1,31) mit einem Ende teilweise über ein Ende des schmaleren Rohrsegments (2,32) geschoben wird, dass die Rohrsegmente (1,2,21,22) unter Ausbildung eines Ringspalts (5,27) zwischen den Rohrsegmenten (1,2,21,22) voneinander beabstandet positioniert werden, dass im Ringspalt (5,27) zwischen den beiden Rohrsegmenten (1,2,21,22) eine sich in Längsrichtung (L) der Rohrsegmente (1,2,21,22) und/oder in radialer Richtung (R) erstreckende Trennschicht (4,14) vorgesehen wird, dass der Ringspalt (5,27) angrenzend zu der Trennschicht (4,14) und zu wenigstens einer Seite der Trennschicht (4,14) wenigstens teilweise mit einer Vergussmasse (9,30) ausgegossen wird, dass beim Aushärten der Vergussmasse (9,30) die Vergussmasse (9,30) auf einer Seite der Trennschicht (4,14) nur mit einem der Rohrsegmente (1,2,21,22) und/oder die Vergussmasse (9,30) auf der anderen Seite der Vergussmasse (9,30) nur mit dem anderen Rohrsegment (1,2,21,22) eine feste Verbindung (3,20) eingeht und dass die Rohrsegmente (1,2,21,22) nach dem Aushärten der Vergussmasse (9,30) mit den zugehörigen, insbesondere durch die ausgehärtete Vergussmasse (9,30) gebildeten, separaten Verbindungselementen (10,11,21,22) wieder entlang der Trennschicht (4,14) voneinander getrennt werden.
-
公开(公告)号:WO2020067896A1
公开(公告)日:2020-04-02
申请号:PCT/NL2019/050646
申请日:2019-09-25
Applicant: GUSTOMSC RESOURCES B.V.
Inventor: HOFMAN, Andries Johannes
IPC: E02B17/02
Abstract: Method for stabilizing a jack-up platform unit, the unit including a hull, a plurality of legs which are extendible from and/or through the hull and which are arranged to support the platform unit during off-shore operations, and a jacking system arranged to move the legs between a transport position and an operational position, wherein the jacking system is also arranged to move the hull along the plurality of legs between a floating position and an operational position, the method comprising the steps of lowering the plurality of legs until the legs stand on or in the seabed, raising the hull substantially above the sea surface, temporarily applying a preloading on the plurality of legs, further raising the hull to an operational height above the sea surface.
-
公开(公告)号:WO2019231329A1
公开(公告)日:2019-12-05
申请号:PCT/NL2019/050319
申请日:2019-05-31
Applicant: ITREC B.V.
Inventor: ROODENBURG, Joop , VEHMEIJER, Terence Willem August
Abstract: The invention relates to an offshore wind turbine installation vessel comprising a crane, which crane is provided with a computerized crane control system. The computerized crane control system is linked to the slew drive, the luffing drive, and the hoisting winch of the crane, and is programmed to perform a foundation pile installation routine providing a coordinated pattern of slew motion of the superstructure and of luffing motion of the boom structure, as well as operation of the hoisting winch so that the load connector of the crane moves from a foundation pile pick up position thereof, where the load connector is connected to the top end of a horizontally oriented foundation pile stored on a storage deck, to a foundation pile overboarding position thereof, wherein the foundation pile is in vertical suspended from the load connector, outside of the hull.
-
公开(公告)号:WO2019206690A1
公开(公告)日:2019-10-31
申请号:PCT/EP2019/059564
申请日:2019-04-12
Applicant: ØRSTED WIND POWER A/S
Inventor: SCHUPP, Jens , GENGENBACH, Jens , PEDERSON, Jan
Abstract: A foundation (1) for a structure. The foundation (1) has a body (2) for insertion into a soil in a insertion direction during installation. The body (2) has a toe (8) at its distal end. The toe (2) defines an aperture (11) into an internal cavity (15). Movement of the toe (2) through the soil displaces soil laterally into a displaced soil region within the internal cavity (15). One or more nozzles (10) are provided for directing a fluid to the displaced soil region during installation for transporting soil away from the displaced soil region. A pumping system (24) is also provided for evacuating fluid from the internal cavity (15) during installation for reducing the soil suspension pressure within the displaced soil region.
-
公开(公告)号:WO2019110086A1
公开(公告)日:2019-06-13
申请号:PCT/EP2017/081457
申请日:2017-12-05
Applicant: TRELLEBORG RIDDERKERK B.V.
CPC classification number: F16J15/46 , E02B17/027 , E02B2017/0065 , E02B2017/0091 , E04H12/085 , F03D13/20 , F03D13/25 , F05B2240/57
Abstract: A structure comprising at least two interconnected structural members (101, 103), wherein an outer end of a first one (101) of said at least two structural members abuts an outer end of a second one (103) of said at least two structural members, and wherein the outer end of said first structural member (101) is provided with a sealing system (109) for preventing fluid to enter from the environment to the interior of the structure, wherein said sealing system (109) comprises: - a compressible sealing member (111) extending along a surface adjacent the outer end of said second structural member (103); - an expandable expansion member (113) extending along and against said sealing member (111); - an inwardly facing rigid flange surface extending along and against said expansion member (113), wherein said flange surface is rigidly connected to the outer end of said first structural member (101); wherein said expansion member (113) is arranged to, in an expanded state, urge the sealing member (111) against the surface adjacent the outer end of said second structural member (103).
-
78.
公开(公告)号:WO2019066653A3
公开(公告)日:2019-04-04
申请号:PCT/NL2018/050641
申请日:2018-09-27
Applicant: ITREC B.V.
Inventor: ROODENBURG, Joop , WIJNING, Diederick Bernardus
Abstract: A method for permanent plug and abandonment of one or more offshore platform wellbores of an offshore platform and for decommissioning of said offshore platform, wherein said platform has a jacket and a topsides. Use is made of a marine jack-up type vessel. The method comprises: - arranging the vessel adjacent the offshore platform bringing the vessel in an operational position wherein the cantilever is movable in an extended position above the topsides of the offshore platform, - moving the cantilever into said extended position above the topsides and aligning the wellbore activities station with a wellbore, - performing a plug and abandonment operation involving the use of the wellbore activities station, - retracting the cantilever, - disconnecting the topsides from the jacket, - lifting the topsides from the jacket and placing said topsides on board the vessel, - operating the elevating units so as to lower the hull of the vessel into the sea and to retract the jack-up legs upward.
-
公开(公告)号:WO2019059534A1
公开(公告)日:2019-03-28
申请号:PCT/KR2018/009534
申请日:2018-08-20
Applicant: 한국해양과학기술원
Abstract: 본 발명은 외력에 의해 승강되며, 하부에 제1 결합부가 형성된 본체; 상기 본체의 제1 결합부에 대응하는 제2 결합부가 형성되어 상기 본체와 결합하면서 상기 본체를 지지하는 하부지지체; 및 상기 제1 결합부 또는 상기 제2 결합부에 설치되어 상기 제1,2 결합부의 결합여부에 따라 각도가 조절되는 각도변환유닛을 포함하고, 상기 각도변환유닛은, 각도조절을 통해 단면적이 변화되면서 상기 본체의 제1 결합부와 상기 하부지지체의 제2 결합부가 정렬되어 결합되도록 유도하는 것을 특징으로 하여, 하부지지체와의 결합을 위한 본체의 승강 시에, 상호 결합하는 제1,2 결합부에 대해 접촉가능한 단면적 범위를 보다 확장시키는 각도변환유닛을 통해 용이하게 수직정렬을 유도할 수 있게 되고, 이에 따라, 보다 신속하고 정확한 설치를 달성할 수 있다.
-
公开(公告)号:WO2018176916A1
公开(公告)日:2018-10-04
申请号:PCT/CN2017/116128
申请日:2017-12-14
Applicant: 华南理工大学
Abstract: 一种自升式海上休闲度假平台,包括桩腿(1)、船体(2)、套筒(20)、至少一个亲水平台(3)、扶梯装置(4)和上层建筑(5),桩腿(1)的下端设有用于置于海底的支撑部(6);套筒(20)的下端内壁通过升降机构安装于桩腿(1),船体(2)安装于套筒(20)的下端外壁;船体(2)的下侧设有滑杆(7),亲水平台(3)的内侧设有与滑杆(7)匹配的连接部(8),连接部(8)与滑杆(7)滑动连接;扶梯装置(4)的上端与船体(2)连接,扶梯装置(4)的下端与亲水平台(3)连接,船体(2)设有入口,此入口位于扶梯装置(4)的上方;上层建筑(5)安装于套筒(20)的上端。该平台可满足人们在海洋上休闲度假使用,减小陆地的压力,还保证使用的人员的舒适性。
-
-
-
-
-
-
-
-
-