公开(公告)号:WO2009030549A1
公开(公告)日:2009-03-12
申请号:PCT/EP2008/059147
申请日:2008-07-14
Applicant: NV BEKAERT SA , AMILS, Xavier , KING, Dale
Inventor: AMILS, Xavier , KING, Dale
CPC classification number: D07B1/068 , D07B1/0693 , D07B5/007 , D07B5/10 , D07B2201/2002 , D07B2201/2011 , D07B2201/2019 , D07B2201/2023 , D07B2201/2027 , D07B2201/2059 , D07B2201/2065 , D07B2205/306 , D07B2205/3071 , E01F15/06 , E04C5/08 , D07B2801/12 , D07B2801/18
Abstract: The present invention is directed to a steel rope safety system (30) comprising at least one steel rope (10, 20) having at least one strand(22), characterized in that said at least one rope (10, 20) or at least one strand is compacted. Further, the present invention is directed to a method for making a steel rope safety system (30) comprising the step of providing at least two wires (24), the step of stranding the wires thereby forming a strand for a rope and the step of compacting the strand. The present invention is also directed to the use of compacted steel ropes as impact reducing material.
Abstract translation: 本发明涉及一种钢丝绳安全系统(30),其包括至少一根钢丝绳(10,20),该绳索具有至少一根股线(22),其特征在于,所述至少一根绳索(10,20)或至少 一条链被压实。 此外,本发明涉及一种制造钢丝绳安全系统(30)的方法,所述方法包括提供至少两根丝线(24)的步骤,绞合丝线的步骤,从而形成绳索的线束,并且步骤 压扁股。 本发明还涉及使用压实钢丝绳作为减震材料。
-
公开(公告)号:WO2019001872A1
公开(公告)日:2019-01-03
申请号:PCT/EP2018/063953
申请日:2018-05-28
Applicant: NV BEKAERT SA
Inventor: KING, Dale
Abstract: A pre-stressed concrete structure comprises a steel wire or a steel strand. The steel wire or steel strand has been pre-tensioned before curing of the concrete or grout. The steel wire or steel strand is provided with a zinc coating. The zinc coating has a weight ranging between 70 g/m² and 950 g/m². The steel wire or steel strand has an outer surface that is provided with indentions to provide mechanical anchorage points in the concrete structure. The steel wire or steel strand is further provided with a passivation layer in the form of a metal oxide layer.
-