METHOD OF FABRICATING INTEGRALLY INSULATED CONCRETE WALL OR WALL COMPONENTS
    1.
    发明申请
    METHOD OF FABRICATING INTEGRALLY INSULATED CONCRETE WALL OR WALL COMPONENTS 审中-公开
    整体绝缘混凝土墙壁或墙壁构件的制造方法

    公开(公告)号:WO2009006440A1

    公开(公告)日:2009-01-08

    申请号:PCT/US2008/068846

    申请日:2008-06-30

    Abstract: A method for forming integrally insulated concrete sandwich walls or wall components is disclosed. The walls are fabricated by casting the walls vertically and pumping the concrete from the bottom of the form or from sides near the base. Walls fabricated thus can be used in commercial, industrial, residential, and agricultural buildings. These walls can be cast on-site or in a manufacturing plant.

    Abstract translation: 公开了一种用于形成一体绝缘的混凝土三明治壁或壁部件的方法。 墙壁通过垂直浇筑墙壁并从混合物的底部或从基部附近的侧面抽出来制造。 因此,制造的墙壁可用于商业,工业,住宅和农业建筑。 这些墙壁可以在现场或在制造工厂铸造。

    PROCEDE ET ENSEMBLE POUR LA REALISATION D'UN INTERVALLE DE SEPARATION ENTRE DEUX PAROIS PARALLELES
    2.
    发明申请
    PROCEDE ET ENSEMBLE POUR LA REALISATION D'UN INTERVALLE DE SEPARATION ENTRE DEUX PAROIS PARALLELES 审中-公开
    用于生产两个平行井眼之间的分离缝隙的方法和装配

    公开(公告)号:WO2015075376A1

    公开(公告)日:2015-05-28

    申请号:PCT/FR2014/052961

    申请日:2014-11-19

    Applicant: MABAMURE

    CPC classification number: E04G11/18 E04G15/063 E04G21/142

    Abstract: Selon ce procédé : - on réalise au moins une première paroi (1), - on applique contre celle-ci au moins un organe intercalaire (20), comprenant un corps (30) en un matériau rigide entouré par une enveloppe périphérique souple (40), - on réalise la seconde paroi (2) et - on extrait l'organe intercalaire, en le soulevant par des moyens de préhension (44), prévus sur l'enveloppe, de façon à réaliser cet intervalle. L'opération de levage est simplifiée, puisque les moyens de préhension sont facilement accessibles pour l'engin de levage. De plus ce dernier n'a pas à être déplacé au voisinage immédiat des parois en béton. Enfin, il n'est pas nécessaire de déchirer au préalable l'enveloppe.

    Abstract translation: 该方法包括: - 产生至少一个第一壁(1), - 向该壁施加至少一个间隔件(20),其包括由柔性周边封套(40)包围的刚性材料制成的主体(30) - 产生所述第二壁(2)和 - 通过借助于设置在所述外壳上的夹持装置(44)提升所述间隔构件,以产生所述间隙。 提升操作简化,因为夹紧装置可以被起重设备容易地接近。 此外,后者不需要移动到混凝土墙壁的附近。 最后,撕裂信封是不必要的。

    CONNECTOR ASSEMBLY FOR INSULATED CONCRETE WALLS
    3.
    发明申请
    CONNECTOR ASSEMBLY FOR INSULATED CONCRETE WALLS 审中-公开
    绝缘混凝土连接器总成

    公开(公告)号:WO0225023A3

    公开(公告)日:2002-08-15

    申请号:PCT/US0129851

    申请日:2001-09-21

    Inventor: LONG ROBERT T SR

    Abstract: A through-insulation connector assembly for use in the construction of insulated concrete sandwich wall. The connector assembly includes a spool-shaped connector body (10) comprised of two, interconnecting pieces (12, 14) and a tie (50) that engages the connector body (10). The two pieces (12, 14) of the connector body (10) are installed at the place of manufacture in a sheet of foam insulation board (48) that will be used as the insulation layer (46) in the construction of an insulated concrete sandwich wall.

    Abstract translation: 一种用于建筑绝缘混凝土夹心墙的绝缘连接器组件。 连接器组件包括由两个互连件(12,14)构成的卷轴状连接器主体(10)和与连接器主体(10)接合的连接件(50)。 连接器主体(10)的两个部件(12,14)在生产场所安装在用作绝缘混凝土结构中的绝缘层(46)的泡沫绝缘板(48)中 三明治墙。

    A DEVICE AND A PROCEDURE FOR CAST-IN-SITU A WALL OR SIMILAR
    4.
    发明申请
    A DEVICE AND A PROCEDURE FOR CAST-IN-SITU A WALL OR SIMILAR 审中-公开
    一种墙壁或类似墙壁的设备和程序

    公开(公告)号:WO2015023223A1

    公开(公告)日:2015-02-19

    申请号:PCT/SE2014/050918

    申请日:2014-08-07

    Applicant: INCOFORM AB

    Inventor: SALEKÄRR, David

    Abstract: The present invention concerns a shuttering (100) for the formation of a wall or similar, comprising a first wall formwork device (10) of an insulating material and a second wall formwork device (20), which are formed to be arranged in parallel so that a space (x) is formed between them intended to be filled with flowing concrete. A number of form ties (30) are arranged to connect the first and second wall formwork devices (10,20). The first wall formwork device (10) comprises a number of building or plastic foam blocks (11), and the second wall formwork device (20) comprises a number of sheathings (21). Each form tie (30) is provided with a first end having a fastening element (40) formed for connection with the first wall formwork device (20), and in its second end provided with a clamp tie device (50) for locking to the second wall formwork device upon temporary mounting and retention/clamping of said second wall formwork device (20) during the concreting, and releasing/unlocking after casting for allowing the wall formwork device (20) to be removed, form stripping. The invention also concerns a procedure for forming, for instance, a wall as well as a support for a said shuttering.

    Abstract translation: 本发明涉及一种用于形成壁或类似物的挡板(100),其包括绝缘材料的第一壁模板装置(10)和第二壁模板装置(20),所述第一壁模板装置形成为平行布置 在它们之间形成用于填充流动混凝土的空间(x)。 布置多个连接件(30)以连接第一和第二壁模板装置(10,20)。 第一壁模板装置(10)包括多个建筑物或塑料泡沫块(11),并且第二壁模板装置(20)包括多个护套(21)。 每个形状连接件(30)设置有第一端,其具有形成为用于与第一壁模板装置(20)连接的紧固元件(40),并且在其第二端中设置有夹紧装置(50),用于锁定到 第二壁模板装置,在所述混凝土期间临时安装和保持/夹持所述第二壁模板装置(20),并且在铸造之后释放/解锁以允许所述壁模板装置(20)被移除,形成剥离。 本发明还涉及用于形成例如墙壁以及用于所述遮蔽的支撑件的过程。

    一种复合保温隔热混凝土剪力墙
    5.
    发明申请

    公开(公告)号:WO2007134517A1

    公开(公告)日:2007-11-29

    申请号:PCT/CN2007/001188

    申请日:2007-04-12

    Applicant: 陈信孚 曲萍

    Inventor: 陈信孚 曲萍

    CPC classification number: E04B1/161 E04B2001/7679 E04B2002/8682 E04G11/18

    Abstract: A composite concrete shear wall for heat insulation comprises a wall (1) and a link beam (2). The wall (1) is composed of a prefabricated concrete wall for heat insulation (11) and a cast-in-place concrete wall. The prefabricated concrete wall (11) is a concrete panel (5), one surface of which is covered with heat insulation layer (4), and steel members (14) are embedded in the prefabricated concrete wall (11). One end of the steel members is embedded in concrete panels, and the other is projected from the heat insulation layer. The steel members are connected and located along the prefabricated concrete wall to form a framework of steel reinforcement. The prefabricated concrete wall (11) and the cast-in-place concrete wall (12) are cast and folded to be an integral.

    EXTRUDED POLYSTYRENE FOAM INSULATION LAMINATES FOR POUR-IN-PLACE CONCRETE WALLS
    6.
    发明申请
    EXTRUDED POLYSTYRENE FOAM INSULATION LAMINATES FOR POUR-IN-PLACE CONCRETE WALLS 审中-公开
    挤出聚苯乙烯泡沫绝缘层压板

    公开(公告)号:WO00066848A1

    公开(公告)日:2000-11-09

    申请号:PCT/US2000/011519

    申请日:2000-04-28

    Abstract: By using a thermal insulation foam/film laminate wherein each major planar surface of a foam panel has a facer film bonded thereto that meets certain performance criteria rather than a foam panel by itself, composite walls that have a foam panel sandwiched between concrete layers can be made with fewer steps.

    Abstract translation: 通过使用隔热泡沫/膜层压体,其中泡沫板的每个主平面表面具有粘合到其上的面膜,其自身符合某些性能标准而不是泡沫板,具有夹在混凝土层之间的泡沫板的复合壁可以是 用较少的步骤。

    A METHOD FOR CONSTRUCTING CAST-IN-PLACE WALLS WITH BINDER
    7.
    发明申请
    A METHOD FOR CONSTRUCTING CAST-IN-PLACE WALLS WITH BINDER 审中-公开
    一种用于构造具有粘结剂的嵌入式墙壁的方法

    公开(公告)号:WO2016010488A1

    公开(公告)日:2016-01-21

    申请号:PCT/TH2015/000044

    申请日:2015-07-16

    Abstract: The present invention relates to a cast-in-place wall construction method comprising the steps of: determining the wall line; forming kicker along the determined wall line; providing at least one of heat protection material or sound protection material or water protection material inside the formwork; installing the formwork along the wall line such that there is a gap between the two panels of the formwork or a gap between one panel of the formwork and a rigid body located on the opposite side of said panel; filling the binder into the gap of the formwork; leaving said binder to harden and to cure within the formwork; and removing the formwork. According to the invention, the filling of binder into the gap of the formwork is carried out by positioning an end of at least one binder filling tube above the slurry surface level at which the binder is to be filled, with at least one binder filling tube being moved vertically or horizontally or with at least one binder filling tube being moved both vertically and horizontally in a relative manner.

    Abstract translation: 本发明涉及一种现浇墙施工方法,包括以下步骤:确定墙线; 沿着确定的墙线形成踢球者; 在模板内提供至少一种防热材料或防护材料或防水材料; 沿着墙线安装模板,使得模板的两个面板之间存在间隙或模板的一个面板之间的间隙和位于所述面板的相对侧上的刚体; 将粘合剂填充到模板的间隙中; 使所述粘合剂在模板内硬化和固化; 并移除模板。 根据本发明,通过将至少一个粘合剂填充管的端部定位在待填充粘合剂的浆料表面水平面上方的至少一个粘合剂填充管上,将粘合剂填充到模板的间隙中 垂直或水平移动或至少一个粘合剂填充管以相对的方式垂直和水平地移动。

    A METHOD FOR CONSTRUCTING CAST-IN-PLACE WALLS
    8.
    发明申请
    A METHOD FOR CONSTRUCTING CAST-IN-PLACE WALLS 审中-公开
    一种建筑工地墙的方法

    公开(公告)号:WO2016010487A1

    公开(公告)日:2016-01-21

    申请号:PCT/TH2015/000043

    申请日:2015-07-16

    Abstract: The present invention relates to a cast-in-place wall construction method comprising the steps of: determining the wall line; forming kicker along the determined wall line; providing at least one of heat protection material or sound protection material or water protection material inside the formwork; installing the formwork along the wall line such that there is a gap between the two panels of the formwork or a gap between one panel of the formwork and a rigid body located on the opposite side of said panel; filling the mortar into the gap of the formwork; leaving said mortar to harden and to cure within the formwork; and removing the formwork. According to the invention, the filling of mortar into the gap of the formwork is carried out by positioning an end of at least one mortar filling tube above the slurry surface level at which the mortar is to be filled, with at least one mortar filling tube being moved vertically or horizontally or with at least one mortar filling tube being moved both vertically and horizontally in a relative manner.

    Abstract translation: 本发明涉及一种现浇墙施工方法,包括以下步骤:确定墙线; 沿着确定的墙线形成踢球者; 在模板内提供至少一种热保护材料或防声材料或防水材料; 沿着墙线安装模板,使得模板的两个面板之间存在间隙或模板的一个面板之间的间隙和位于所述面板的相对侧上的刚体; 将砂浆填充到模板的间隙中; 留下砂浆在模板内硬化和固化; 并移除模板。 根据本发明,通过至少一个砂浆填充管将至少一个砂浆填充管的端部定位在浆料表面水平面上方,将砂浆填充到模板的间隙中 垂直或水平移动或至少一个砂浆填充管以相对的方式垂直和水平地移动。

    PROCEDE ET OUTILLAGE POUR LA REALISATION IN SITU D'UN MUR SANDWICH COMPORTANT DEUX PAROIS EN BETON SEPAREES PAR UN PANNEAU ISOLANT
    9.
    发明申请
    PROCEDE ET OUTILLAGE POUR LA REALISATION IN SITU D'UN MUR SANDWICH COMPORTANT DEUX PAROIS EN BETON SEPAREES PAR UN PANNEAU ISOLANT 审中-公开
    包括由绝缘板分离的两个混凝土墙的三面墙的现场施工方法和设备

    公开(公告)号:WO2011107696A1

    公开(公告)日:2011-09-09

    申请号:PCT/FR2011/050396

    申请日:2011-02-25

    Inventor: BEAUMONT, Gilles

    CPC classification number: E04G17/06 E04C5/16 E04G11/18 E04G17/0652

    Abstract: L'invention concerne un procédé pour la réalisation d'un mur avec deux parois en béton entre lesquelles est emprisonné au moins un panneau isolant (4), les deux parois étant réalisées de façon simultanée par coulage de béton entre le panneau isolant (4) et deux banches interne (6) et externe (7). Le procédé consiste par la mise en place; sur chaque panneau isolant (4) avant leur positionnement, de systèmes de positionnement (13) comportant chacun au moins un crochet orientable angulairement, d'un ferraillage de structure interne (9) du côté de la face interne de la banche interne (6), de chaque panneau isolant (4) avec passage à travers du ferraillage de structure interne (7), des systèmes de positionnement (13), pour chaque dispositif d'assemblage (14), avant le positionnement de la banche externe (7), d'une entretoise tubulaire traversant le panneau isolant (4) et traversée par une tige de serrage (41) s'étendant à l'extérieur des banches pour recevoir à chaque extrémité un organe de serrage (42).

    Abstract translation: 本发明涉及一种用于构造墙壁的方法,其包括两个混凝土壁,所述混凝土壁具有夹在其间的至少一个绝缘板(4),所述两个壁同时通过将混凝土浇注在绝缘板(4)和内部(6)之间, 和外部(7)表格面板。 该方法包括以下步骤:在每个绝缘板(4)定位之前,将定位系统(13)安装在每个绝缘板(4)上,每个所述系统包括至少一个可角度定向的钩子; 在内部表面板(6)的内侧上安装内部加强件(9); 每个绝缘板(4)的定位使得定位系统(13)延伸穿过内部加强件(7); 并且对于每个组装装置(14)并且在定位外部模板之前,安装延伸穿过绝缘板(4)的管状隔离件,并且紧固杆(41)穿过绝缘板 以便在每个端部处接纳紧固件(42)。

    A TIE ROD FOR FORMWORK
    10.
    发明申请
    A TIE ROD FOR FORMWORK 审中-公开
    FORMWORK的TIE ROD

    公开(公告)号:WO2007053027A1

    公开(公告)日:2007-05-10

    申请号:PCT/NO2006/000376

    申请日:2006-10-27

    CPC classification number: E04G17/0721 E04G11/18 E04G17/06 E04G17/0742

    Abstract: A tie rod (1) for joining opposite side sections (23a, 23b) of a casting formwork (21) , the tie rod (1) being provided with a mid portion (3) and two rod end portions (5a, 5b) and there being formed, in the transitions between the mid portion (3) and either rod end portion (5a, 5b) at least one abutment surface (7) which is arranged to rest supportingly on an internal side surface (23c) of the side sections (23a, 23b) , and the rod end portions (5a, 5b) including rests (9) for wedge devices (11) for securing the side sections (23a, 23b) of the casting formwork (21) , and the tie rod (1) including a stem (2) of great tensile strength and a surrounding mantle (2a), the mid portion (3) and the mantle (2a) of the stem (2) being formed as a continuous structure, the stem (2), the mantle (2a) and mid portion (3) being formed of non- corrosive materials.

    Abstract translation: 一种用于连接铸造模板(21)的相对侧部分(23a,23b)的拉杆(1),所述拉杆(1)设置有中间部分(3)和两个杆端部分(5a,5b)和 在中间部分(3)和任一个杆端部分(5a,5b)之间的过渡中形成有至少一个邻接表面(7),其被支撑地搁置在侧部分的内侧表面(23c)上 (23a,23b),并且包括用于固定铸模(21)的侧部(23a,23b)的楔形装置(11)的搁板(9)的杆端部(5a,5b)和拉杆 1)包括具有很大拉伸强度的杆(2)和周围地层(2a),杆(2)的中部(3)和地幔(2a)形成为连续结构,杆(2) ,地幔(2a)和中部(3)由非腐蚀性材料形成。

Patent Agency Ranking