公开(公告)号:WO2022210358A1
公开(公告)日:2022-10-06
申请号:PCT/JP2022/014408
申请日:2022-03-25
Applicant: 戸田建設株式会社 , 国立大学法人九州大学
Abstract: 【課題】洋上において、バラスト水の注水によるスパー型洋上風力発電設備用浮体の立て起こしを安全かつ効率的に行う。 【解決手段】海上において、横向きで浮かんだスパー型洋上風力発電設備用浮体4をバラスト水の注水によって立て起こしするに当たって、前記スパー型洋上風力発電設備用浮体4に対して、重心偏心化手段によって重心位置を偏心させた状態とする第1手順と、バラスト水の注水を行い、前記スパー型洋上風力発電設備用浮体4を直立に起立させる第2手順とからなる。前記重心偏心化手段としては、浮体4の外面に取り付けたウエイト2又は浮体4の内部に投入した固形バラスト34とすることができる。
-
公开(公告)号:WO2021254786A1
公开(公告)日:2021-12-23
申请号:PCT/EP2021/064903
申请日:2021-06-03
Applicant: CEFRONT TECHNOLOGY AS
Inventor: ARNESEN NYHUS, Audun , SYVERTSEN, Kåre , AARSNES, Jan, Vidar
IPC: B63B1/10 , B63B35/44 , B63B77/10 , B63B1/107 , B63B1/125 , B63B2035/446 , B63B2039/067 , B63B35/003 , B63B73/10
Abstract: The invention describes a floating support structure (1) for connection to a tower (101) of a wind turbine (100) without using a crane for mounting the tower (101). The support structure (1) comprises a first and second pivot line buoyancy unit (3, 5 4) having a pivot line (2) between them and a top buoyancy unit (5), wherein the top buoyancy unit (5) is positioned in a top corner of an isosceles triangle (T) with equal sides extending from the top buoyancy unit (5) to each of the first and second pivot line buoyancy unit (3, 4) and the support structure flange (15) is positioned on the lower half of a perpendicular line (H) from the top corner. The inventive support structure (1) have a stable vertical floating position with the first and second pivot line buoyancy units (3, 4) floating in a body of water and the top buoyance unit (21) vertically above them.
-
公开(公告)号:WO2023057671A1
公开(公告)日:2023-04-13
申请号:PCT/ES2022/070624
申请日:2022-10-03
Applicant: SENER, INGENIERÍA Y SISTEMAS, S.A.
Inventor: PEÑA SAGASTUY, Jorge , LÓPEZ BECERRA, David , ZABALA CALVO, Iñaki , MARTIN SÁNCHEZ, José Luis , AMETLLER MALFAZ, Sergi
IPC: B63B77/10 , B63B1/10 , F03D13/25 , B63B35/44 , B63B1/107 , B63B2001/126 , B63B2001/128 , B63B2035/446 , B63B2039/067 , F05B2240/93 , F05B2240/95
Abstract: La invención describe una plataforma (1) flotante semisumergible que comprende seis columnas (CV, CL) dispuestas formando un triángulo de manera que tres columnas de vértice (CV) están dispuestas en los vértices del triángulo y tres columnas de lado (CL) están dispuestas en los centros de los lados del triángulo, y donde cada columna (CV, CL) está conectada mediante un elemento de unión (B) respectivo a cada una de las columnas (CV, CL) adyacentes. Además, una columna de lado (CL) está configurada para soportar el aerogenerador (A). Las columnas (CV, CL) que no soportan el aerogenerador (A) tienen un peso configurado para mantener el centro de masas del conjunto formado por plataforma (1) y aerogenerador (A) en la vertical del centro de carena de la plataforma (1).
-
公开(公告)号:WO2022229436A1
公开(公告)日:2022-11-03
申请号:PCT/EP2022/061578
申请日:2022-04-29
Applicant: ITREC B.V.
Inventor: WIJNING, Diederick Bernardus , ROODENBURG, Joop
Abstract: The invention relates to a vessel for installation of a pile for supporting a wind turbine, the vessel comprising a hull, a lifting device, and a pile gripper. The lifting device comprises a base, an elongate, upright superstructure, and a lifting assembly and the pile gripper comprises a gripper base and a gripper device. According to the invention, the pile engagement device and the gripper device are, by respective movabilities thereof in an X-Y plane relative to the vessel, whilst both engaging a pile, and whilst supporting the pile, simultaneously movable relative to the hull from an inboard retaining position in which the pile engagement device is in the upper position and the pile is above the hull, to an outboard installation position of the pile in which the pile is outside the contour of the vessel.
-
5.
公开(公告)号:WO2022207048A1
公开(公告)日:2022-10-06
申请号:PCT/DK2022/050062
申请日:2022-03-28
Applicant: MAERSK SUPPLY SERVICE A/S
Inventor: HASHOLT, Steen Tange
Abstract: A semi-submersible service vessel (100) for a floating installation (102) has a hull (104) and a ballasting system. The ballasting system is arranged to selectively lower the hull (104) to a first draft and raise the hull (104) to a second draft. The second draft is smaller than the first draft. At least one submersed elongate lifting fork is fixed to the hull (104) and is configured to extend across the underside of the floating installation (102) and engage the underside of the floating installation (102) when the hull (104) is raised from the first draft to the second draft. Wherein the at least one lifting fork is arranged to lift the entire floating installation (102) when the hull (104) is raised from the first draft to the second draft, and a method of servicing a floating installation (102) with a semi-submersible service vessel (100).
-
公开(公告)号:WO2022148789A1
公开(公告)日:2022-07-14
申请号:PCT/EP2022/050166
申请日:2022-01-05
Applicant: ITREC B.V.
Inventor: WIJNING, Diederick Bernardus , ROODENBURG, Joop
Abstract: The invention relates to a crane for assembly and installation of offshore wind turbines on an offshore location, to a vessel for assembly and installation of offshore wind turbines on an offshore location, and to a method for assembly and installation of offshore wind turbines on an offshore location. According to the invention the crane is provided with a base section and a top section, wherein the top section is rotatable supported by a bearing, and can be rotated with the wind turbine hoisting device relative to the base section about a vertical axis, wherein a first trolley guide is mounted to a top section of the installation crane for guiding a vertically mobile wind turbine supporting trolley. According to the invention the vessel is provided with one or more assembly stations on different sides of the installation crane.
-
公开(公告)号:WO2021244724A1
公开(公告)日:2021-12-09
申请号:PCT/DK2021/050179
申请日:2021-06-04
Applicant: STIESDAL OFFSHORE TECHNOLOGIES A/S
Inventor: STIESDAL, Henrik , ERIKSEN, Uffe Lykke
Abstract: An offshore floating structure (100) comprises a floater (200) with positive buoyancy and a keel (300) with negative buoyancy, as well as active and passive suspenders (400) connecting nodes of the keel (300) and the floater (200) with each other. When the keel (300) at the offshore site is lowered by making the active suspenders (440) longer, the passive suspenders (420), which have a fixed length and are held taut, causes the keel (300) to rotate about the vertical during lowering.
-
公开(公告)号:WO2023046909A1
公开(公告)日:2023-03-30
申请号:PCT/EP2022/076536
申请日:2022-09-23
Applicant: SOLETANCHE FREYSSINET
Inventor: LEBON, Jean-Daniel , DONNEZAN, Benoît , RICARD, Jean-Philippe
IPC: B63B35/44 , B63B77/10 , B63B5/18 , B63B73/10 , B63B73/30 , B63B73/46 , B63B73/40 , B63B75/00 , F03D13/25
Abstract: A method for constructing a wind turbine concrete floater (1) comprising a central connector (2) from which radial arms (3; 4; 5) extend, the central connector (2) carrying a central stability tower (9), and each arm carrying an outer stability tower (7), the method comprising: - Prefabricating the arms (3; 4; 5), central connector (2) and at least parts of the stability towers (7; 9), - Pre-assembling the central connector (2) with one arm (3) to form a primary pre-assembly (21), - Mounting temporary flotation devices (30) onto the arms (3, 4, 5) to provide additional buoyancy to them, - Floating the primary preassembly (21) and floating the other arms (4, 5) of the floater, - Assembling offshore said primary preassembly (21) with said other arms (4, 5).
-
公开(公告)号:WO2023015254A1
公开(公告)日:2023-02-09
申请号:PCT/US2022/074536
申请日:2022-08-04
Applicant: DEEP REACH TECHNOLOGY, INC.
Inventor: WU, Shukai , HALKYARD, John
Abstract: A method and system for horizontally mating an offshore wind turbine generator assembly, typically including a tower and wind turbine nacelle and blades, with a substructure platform to form an integrated substructure unit, wet towing the unit to installation site offshore, and then installing the unit independent of cranes and derricks.
-
公开(公告)号:WO2023279623A1
公开(公告)日:2023-01-12
申请号:PCT/CN2021/131228
申请日:2021-11-17
Applicant: 江苏亨通蓝德海洋工程有限公司
IPC: B63B77/10
Abstract: 一种浮式船舶起吊结构及其方法,起吊结构包括:船本体(3)和吊车主体(4),船本体(3)与吊车主体(4)连接,船本体(3)的两端至少设有四组压载舱(1),压载舱(1)与船本体(3)连接,压载舱(1)的一侧设有负压筒(2),负压筒(2)与船本体(3)连接,通过负压筒(2)的受力大小,压载舱(1)之间相对应且相互配合调拨压载水。
-
-
-
-
-
-
-
-
-