-
1.
公开(公告)号:WO2023084437A1
公开(公告)日:2023-05-19
申请号:PCT/IB2022/060826
申请日:2022-11-10
申请人: ETESIAS S.R.L.
摘要: The present disclosure relates to a self-supporting element (1) for the construction of structures, comprising a first and a second side wall (2, 3) wherein at least one between the first and the second side wall (2, 3) is made of cementitious material. The first and the second side wall (2, 3) are positioned in a predetermined positional relationship and are separated from each other by an air volume (4). According to the invention, the element (1) comprises at least one dividing partition (5), placed between the first and the second side wall (2, 3). The dividing partition (5) has a curved profile at least partially doubled and is configured to mitigate the thermal convection within the air volume (4). The present invention further relates to the method of manufacturing the element (1).
-
公开(公告)号:WO2023077196A1
公开(公告)日:2023-05-11
申请号:PCT/AU2022/051325
申请日:2022-11-04
发明人: EMBLIN, Alan Gayne
IPC分类号: E04B2/32 , E04B2/86 , E04G11/06 , E04B1/94 , E04B2/00 , E04B2/02 , E04B2/58 , E04C2/36 , E04C5/01
摘要: The present disclosure relates to a formwork system, comprising: a plurality of panels, comprising at least a first panel and a second panel, wherein each of the panels comprises a first edge and a second edge, the first and second edges being on opposite sides of the panel; an elongate joiner configured to connect the first panel to the second panel by coupling with the first edge of the second panel and the second edge of the first panel; and, a plurality of brackets, each of the brackets having two coupling portions, the coupling portions being located at opposite ends of the bracket, wherein each coupling portion is configured to couple with the elongate joiner.
-
公开(公告)号:WO2023039745A1
公开(公告)日:2023-03-23
申请号:PCT/CN2021/118477
申请日:2021-09-15
申请人: 中铁上海工程局集团第三工程有限公司 , 中铁上海工程局集团有限公司
IPC分类号: E04B1/68 , E04B2/00 , E04F13/076
摘要: 本发明提供一种装配式预制夹心保温外墙板的排水防渗装置,包含:柔性防水材质的多个软管;沿所述软管的长度方向,在软管上开有连通软管内、外部的多个排水孔;所述软管嵌入设置在建筑物相邻夹心保温外墙板之间的拼接缝内,并位于相邻的外叶墙板之间;所述排水孔贴合外叶墙板的侧面,外叶墙板的渗水通过排水孔流入软管内,通过所述多个软管连接形成夹心保温外墙板的排水通道。本发明还提供一种装配式预制夹心保温外墙板的防水处理方法。本发明能够用于装配式高层建筑外墙的防渗漏处理,有效避免后期外墙渗水造成室内装修返工,具有很大的市场前景。
-
公开(公告)号:WO2023015680A1
公开(公告)日:2023-02-16
申请号:PCT/CN2021/119884
申请日:2021-09-23
申请人: 中建科工集团有限公司
摘要: 墙板结构与建筑用墙体,包括至少两个子部墙板(110)和至少一个金属连接件(120);金属连接件(120)至少与两个相邻子部墙板(110)相连接,以使多个子部墙板(110)沿第一方向依次间隔连接,相邻两个子部墙板(110)之间具有预留间隙(113)。当地震发生时,墙板结构自左向右发生倾斜,即沿墙板结构长度方向发生倾斜,金属连接件(120)位于预留间隙(113)的部位发生形变,相邻两个子部墙板(110)发生左右错位,从而对墙板结构进行耗能,进而降低墙板结构在地震时产生的损坏。
-
公开(公告)号:WO2023272345A1
公开(公告)日:2023-01-05
申请号:PCT/AU2022/050663
申请日:2022-06-28
申请人: NXGEN HOMES PTY LTD
发明人: IMVRIOTIS, Alexander
摘要: Disclosed is a load bearing system for a residential structure. The load bearing system comprises two or more structural load bearing columns, at least one beam extending between and connected with respect to in-use upper ends of the two or more structural load bearing columns, and at least one cladding panel mounted to 5 extend between a foundation of the residential structure and the at least one beam. The columns are mounted to a foundation of the residential structure in spaced relation to the or each other column and comprise a periphery defined by hollow-section members and one or more internal bracing elements extending between the hollow-section members.
-
公开(公告)号:WO2022257173A1
公开(公告)日:2022-12-15
申请号:PCT/CN2021/101109
申请日:2021-06-19
申请人: 浙江明筑新材料有限公司
IPC分类号: E04B2/00 , E04B1/74 , E04F13/072 , E04F13/22 , A41G1/00 , A01M13/00 , F24F5/00 , F25D1/02 , C08L101/00 , C08K5/00
摘要: 一种自带降温和增温功能且具有驱蚊效果的仿真植物墙,涉及仿真植物墙技术领域,包括墙体(1),所述墙体(1)的前侧设置有墙板(3),所述墙板(3)的前侧设置有若干驱蚊植物叶(4),且墙板(3)的前侧对应驱蚊植物叶(4)的位置处均开设有连接孔(9),若干所述驱蚊植物叶(4)平铺于墙板(3)的前侧形成仿真植物墙面。其设计巧妙,结构简单,通过快拆接头(45)可以便于驱蚊植物叶的快速拆装,方便对驱蚊植物叶进行擦拭清洁,保证其色泽的亮鲜,避免因长时间积灰导致影响视觉观感,叶片采用可以驱蚊的注塑料注塑而成,进而可以起到驱蚊效果,避免因蚊虫隐匿其中导致影响使用体验,采用柔性灯带制成的叶脉不仅可以起到支撑叶片的效果,还可以提升整体的观感,增加视觉冲击。
-
公开(公告)号:WO2022241063A1
公开(公告)日:2022-11-17
申请号:PCT/US2022/028896
申请日:2022-05-12
IPC分类号: E04B1/61 , E04B2/08 , E04B2/00 , E04B1/38 , E04B1/02 , E04B1/34321 , E04H1/1205
摘要: A lightweight modular shelter, and method for assembling a shelter. The shelter includes first and second panels and first and second panel connectors. The panel connectors have a panel edge channel operatively connected to sides of the first and second panels, and have a connector plug and a connector socket. The connector plug of the first panel connector is inserted into the connector socket of the second panel connector, such that the first panel and the second panel are operatively connected. The shelter may also include a bottom track, where the first panel, the second panel, the first panel connector, and the second panel connector are mated to the bottom track. Methods include attaching the panels and connectors, along with corner connectors, to the bottom track to form a freestanding structure. Roof panels and connectors and gable panels and connectors may be attached thereto.
-
公开(公告)号:WO2022127539A1
公开(公告)日:2022-06-23
申请号:PCT/CN2021/132730
申请日:2021-11-24
申请人: 中国电建集团贵阳勘测设计研究院有限公司
摘要: 本申请公开了一种冷弯薄壁型钢轻混凝土复合一体墙板结构,墙板本体的左、右两端分别浇筑连接有凸形型钢和凹形型钢,凸形型钢的凸出部位与凹形型钢的凹陷部位结构对应;所述凸出部位两侧壁之间设有1个安装管,安装管的两端分别与凸出部位的侧壁内表面固定连接,安装管中背向安装有2根螺杆,2根螺杆之间设置有弹簧,2根螺杆穿过凸出部位后伸出至其外部;所述凹陷部位的两侧壁内表面各设有1个水平设置的套管,套管经侧壁的连接端与外部导通。通过设置凸形型钢和凹形型钢,凸形型钢上设置安装管、螺杆、弹簧,凹形型钢上设置有套管,吊装过程中,只需要保证端部平齐,水平移动即可使得螺杆卡入套管中,大大提高了吊装安装效率。
-
公开(公告)号:WO2022116023A1
公开(公告)日:2022-06-09
申请号:PCT/CN2020/133212
申请日:2020-12-02
申请人: 南京溧水高新创业投资管理有限公司
发明人: 郑娉婷
摘要: 一种城市用建筑外墙绿化装置,包括竖直固定安装板(1)、植物种植机构以及植物防护顶板(2);所述竖直固定安装板(1)上均匀配置有若干固定安装孔;所述植物防护顶板(2)的一端与所述竖直固定安装板(1)固定连接,所述植物防护顶板(2)相对于所述竖直固定安装板(1)倾斜设置,所述植物防护顶板(2)连接所述竖直固定安装板(1)的一端高于远离所述竖直固定安装板(1)的一端;所述植物种植机构包括若干植物种植盒(3)和植物浇水管(4),所述植物种植盒(3)为无顶盒体,若干个所述植物种植盒(3)均匀排布成行安装在所述竖直固定安装板(1)的外侧,所述植物种植盒(3)的后侧与所述竖直固定安装板(1)固定连接,所述植物浇水管(4)配置于所述植物种植盒(3)的上方。
-
10.
公开(公告)号:WO2022087286A1
公开(公告)日:2022-04-28
申请号:PCT/US2021/056080
申请日:2021-10-21
发明人: COLLINS, Arlan E. , WOERMAN, Mark L. , D'AMATO, Mark , HINCKLEY, Eric P. , DANZ, Calder , ALLEN, Christopher J. , PAUL, Dale V.
摘要: Floor-ceiling corridor panels are provided for a building that includes load bearing walls that are able to withstand vertical loads and lateral loads. The building may be a low-rise building or a mid-rise building. The floor-ceiling corridor panels, as well as the load bearing walls, corridor panels, utility walls, and other parts of the building are pre-manufactured off‑site and then installed on-site at the site of the building. The floor-ceiling corridor panels are hung from the load bearing walls and are capable to receive and transfer lateral forces, loads, and drag.
-
-
-
-
-
-
-
-
-