Invention Application
- Patent Title: METHOD FOR OPERATING AN ELECTRICAL SYSTEM
- Patent Title (中): 操作电气系统的方法
-
Application No.: PCT/US2006/015996Application Date: 2006-04-25
-
Publication No.: WO2007005095A2Publication Date: 2007-01-11
- Inventor: BERNARDI, John, J. , MORRICAL, Brian, T. , EHRENHARDT, Kevin, D. , GOLDAMMER, Timothy, A.
- Applicant: CATERPILLAR INC. , BERNARDI, John, J. , MORRICAL, Brian, T. , EHRENHARDT, Kevin, D. , GOLDAMMER, Timothy, A.
- Applicant Address: 100 N.E. Adams Street, Peoria, IL 61629-6490 US
- Assignee: CATERPILLAR INC.,BERNARDI, John, J.,MORRICAL, Brian, T.,EHRENHARDT, Kevin, D.,GOLDAMMER, Timothy, A.
- Current Assignee: CATERPILLAR INC.,BERNARDI, John, J.,MORRICAL, Brian, T.,EHRENHARDT, Kevin, D.,GOLDAMMER, Timothy, A.
- Current Assignee Address: 100 N.E. Adams Street, Peoria, IL 61629-6490 US
- Agency: LUNDQUIST, Steve, D. et al.
- Priority: US11/170,175 20050630
- Main IPC: B60R16/02
- IPC: B60R16/02 ; B60L1/08 ; B60L1/12 ; H02J7/00 ; B60L1/00
Abstract:
A method for operating an electrical system (20) for a machine (10) is provided. The electrical system may include at least one power source (30) connected to a power-distribution network (21). The power-distribution network may include a first portion (26) with one or more power loads (34) connected thereto and a second portion (28) with one or more power loads connected thereto. The method may include repeatedly executing a load-priority cycle including operating in a first load-priority mode and subsequently operating in a second load-priority mode, during a power deficit. Operating in the first load-priority mode may include supplying power to the first and second portions of the power-distribution network, with a priority on supplying power to the first portion. Operating in the second load-priority mode may include supplying power to the first and second portions of the power-distribution network, with a priority on supplying power to the second portion.