A handling apparatus for platelike elements, such as prefab walls
    51.
    发明公开
    A handling apparatus for platelike elements, such as prefab walls 失效
    用于板材元素的处理设备,如预制件

    公开(公告)号:EP0115370A3

    公开(公告)日:1984-08-29

    申请号:EP84200111

    申请日:1984-01-27

    发明人: Penseel, Jacob

    IPC分类号: E04G21/16 E04F21/18

    摘要: A handling apparatus for platelike elements, such as prefab walls, comprising a wheeled frame having a substantially vertically directed supporting surface with a substantially horizontally directed supporting edge at its bottom. The supporting surface with the supporting edge is arranged parallel to a wheel shaft along a side edge of the frame. The frame is provided with at least one support wheel spaced behind the supporting surface, and spaced above the frame wheels, said support wheel being mounted in a support lowerable in vertical direction. The supporting surface and supporting edge may have lateral extension members and each support wheel support is preferably movable in a stepless controlled manner.

    摘要翻译: 用于板状元件(例如预制壁)的处理装置,包括具有基本上垂直定向的支撑表面的轮式框架,其底部具有大致水平定向的支撑边缘。 具有支撑边缘的支撑表面沿着框架的侧边缘平行于轮轴布置。 框架设置有至少一个支撑轮,该支撑轮间隔开支撑表面,并且在框架轮上方间隔开,所述支撑轮安装在可在垂直方向上下降的支撑件中。 支撑表面和支撑边缘可以具有侧向延伸构件,并且每个支撑轮支撑件优选地以无级控制的方式移动。

    System for mounting facade elements
    52.
    发明授权
    System for mounting facade elements 有权
    用于安装门面元件的系统

    公开(公告)号:EP2894269B1

    公开(公告)日:2017-12-06

    申请号:EP14198625.7

    申请日:2009-12-18

    IPC分类号: E04B2/96 E04G21/16

    摘要: The present invention relates to a method for mounting facade elements (12,12b-c) on a multi-storey building by means of a profile system comprising a first type of vertical profile (1) having a first portion (2) which is arranged to be placed facing the building, a second portion (3), which is arranged to be placed facing away from the building and slots (4a-b) arranged between the first and second potion on each side of the vertical profile (1) and extending along the longitudinal axis of the profile; and a second type of vertical profile (14) arranged to support a first facade element (12c), and the second type of profile is provided with a groove (15) extending along the longitudinal axis of the profile and designed to receive and support an edge (13) of a second facade element (12). The method comprises: a) mounting two vertical profiles (1a-b) of the first type at a second floor of the building so that the slots (4a-b) are facing each other, and above profiles (1 c-d) of the first and second type previously mounted on a first floor, and so that the longitudinal axes of the profiles are aligned, b) transporting a facade element (12) in a vertical direction guided by the grooves of the second type of profiles mounted on the first floor until it reaches the vertical profiles mounted on the second floor, c) entering the facade element into the slots (4a-b) of the first type of vertical profiles mounted on the second floor, d) continuing transporting the facade element in the vertical direction guided by the slots (4a-b) of the first type of vertical profiles mounted on the second floor until it reaches a mounting position, e) moving the facade element to an inner part (5) of the slots (4a-b).and f) attaching the facade element to the building.

    A method for mounting facade elements on a multi-storey building
    54.
    发明公开
    A method for mounting facade elements on a multi-storey building 有权
    Verfahren zur Montage von Fassadenelementen auf einemvielstöckigenGebäude

    公开(公告)号:EP2894277A1

    公开(公告)日:2015-07-15

    申请号:EP14198624.0

    申请日:2009-12-18

    IPC分类号: E04G21/14 E04B2/86 E04B2/96

    摘要: The present invention relates to a method for mounting facade elements (12,12b-c) on a multi-storey building by means of a profile system comprising a first type of vertical profile (1) having a first portion (2) which is arranged to be placed facing the building, a second portion (3), which is arranged to be placed facing away from the building and slots (4a-b) arranged between the first and second potion on each side of the vertical profile (1) and extending along the longitudinal axis of the profile; and a second type of vertical profile (14) arranged to support a first facade element (12c), and the second type of profile is provided with a groove (15) extending along the longitudinal axis of the profile and designed to receive and support an edge (13) of a second facade element (12). The method comprises: a) mounting two vertical profiles (1a-b) of the first type at a second floor of the building so that the slots (4a-b) are facing each other, and above profiles (1 c-d) of the first and second type previously mounted on a first floor, and so that the longitudinal axes of the profiles are aligned, b) transporting a facade element (12) in a vertical direction guided by the grooves of the second type of profiles mounted on the first floor until it reaches the vertical profiles mounted on the second floor, c) entering the facade element into the slots (4a-b) of the first type of vertical profiles mounted on the second floor, d) continuing transporting the facade element in the vertical direction guided by the slots (4a-b) of the first type of vertical profiles mounted on the second floor until it reaches a mounting position, e) moving the facade element to an inner part (5) of the slots (4a-b).and f) attaching the facade element to the building.

    摘要翻译: 本发明涉及一种通过轮廓系统在多层建筑物上安装立面元件(12,12b-c)的方法,该轮廓系统包括具有第一部分(2)的第一类型的垂直轮廓(1) 被放置成朝向建筑物放置,第二部分(3)被布置成面向远离建筑物放置并且布置在竖直轮廓(1)的每一侧上的第一和第二部分之间的槽(4a-b)和 沿着轮廓的纵向轴线延伸; 以及布置成支撑第一外立面元件(12c)的第二类型的垂直轮廓(14),并且所述第二类型的轮廓设置有沿着轮廓的纵向轴线延伸的凹槽(15),并且被设计成接收和支撑 第二外立面元件(12)的边缘(13)。 该方法包括:a)将第一类型的两个垂直轮廓(1a-b)安装在建筑物的第二层,使得槽(4a-b)彼此面对,并且在第一 和先前安装在第一层上的第二类型,并且使得型材的纵向轴线对准,b)沿安装在第一层的第二类型的轮廓的槽引导的垂直方向传送立面元件(12) 直到其到达安装在二楼的垂直轮廓,c)将外立面元件进入安装在二楼的第一类型垂直轮廓的槽(4a-b)中,d)在垂直方向上连续运送立面元件 由安装在第二层的第一类型垂直轮廓的槽(4a-b)引导,直到其到达安装位置,e)将立面元件移动到槽(4a-b)的内部部分(5)。 和f)将外立面元件连接到建筑物。

    COLOUR STABILISED POLYOLEFINS
    55.
    发明公开
    COLOUR STABILISED POLYOLEFINS 审中-公开
    可可脂多糖

    公开(公告)号:EP1910457A1

    公开(公告)日:2008-04-16

    申请号:EP06776420.9

    申请日:2006-07-26

    摘要: A polyolefin composition which comprises: (a) a polyolefin containing transition metal catalyst residue (excluding metallic co-catalyst residues) at a level below 5 ppm based on the weight of the polyolefin; (b) optionally a first stabilizing component consisting of a phenolic antioxidant or mixture of phenolic antioxidants; (c) optionally a second stabilizing component consisting of a phosphite antioxidant or a mixture of phosphite antioxidants; and (d) a third stabilizing component which acts also as a color suppressant and which is a polyfunctional alcohol, amine or amide or mixtures thereof, with at least one of (b) and (c) present and with the proviso that if the phosphite antioxidant is trilauryl phosphite it must be used in combination with another phosphite. The preferred stabilizing components (b) is 1,3,5-tris(4-tert-butyl-3-hydroxy-2,6 dimethyl,benzyl)-1,3,5-triazine-2,4,6-(1H,3H,5H)-trione or mixed tocopherols. The preferred stabilizing component (c) is Tris(mono-nonylphenyl)phosphite, Tris(2,4-di-t-butylphenyl)phosphite or bis(2,4-di-t-butyl phenyl)pentaerythritol diphosphite. The preferred stabilizing component (d) which also acts as a color suppressant component (d) is dipentaerythritol or tri-isopropanol amine. The preferred polyolefins are polypropylene and polyethylene. The polyolefin composition also may contain a hindered amine stabilizer (HAS) and an acid scavenger (e.g. calcium stearate).

    摘要翻译: 一种聚烯烃组合物,其包含:(a)基于聚烯烃的重量,含量低于5ppm的含聚烯烃的过渡金属催化剂残余物(不包括金属助催化剂残余物); (b)任选的由酚类抗氧化剂或酚类抗氧化剂的混合物组成的第一稳定组分; (c)任选的由亚磷酸酯抗氧化剂或亚磷酸酯抗氧化剂的混合物组成的第二稳定组分; 和(d)还具有作为抑色剂的第三稳定组分,其是与(b)和(c)中的至少一种存在的条件是多官能醇,胺或酰胺或其混合物,条件是如果亚磷酸酯 抗氧化剂是亚磷酸三月桂酯,它必须与另一种亚磷酸酯组合使用。 优选的稳定化组分(b)是1,3,5-三(4-叔丁基-3-羟基-2,6-二甲基苄基)-1,3,5-三嗪-2,4,6-(1H ,3H,5H) - 三酮或混合的生育酚。 优选的稳定化组分(c)是亚磷酸三(单壬基苯基)酯,亚磷酸三(2,4-二叔丁基苯基)酯或二(2,4-二叔丁基苯基)季戊四醇二亚磷酸酯。 还用作抑色剂组分(d)的优选的稳定组分(d)是二季戊四醇或三异丙醇胺。 优选的聚烯烃是聚丙烯和聚乙烯。 聚烯烃组合物还可以含有受阻胺稳定剂(HAS)和酸清除剂(例如硬脂酸钙)。

    DEVICE FOR INSTALLING LIGHT-WEIGHT PANEL UNITS
    56.
    发明授权
    DEVICE FOR INSTALLING LIGHT-WEIGHT PANEL UNITS 有权
    设备技术应用光面板单位

    公开(公告)号:EP1023510B1

    公开(公告)日:2005-07-20

    申请号:EP98947587.6

    申请日:1998-10-14

    申请人: Inkeroinen, Jukka

    发明人: Inkeroinen, Jukka

    IPC分类号: E04G21/16 B66F11/04

    摘要: A lifting device (20) for installing lightweight prefabricated elements (21) in place on a wall or ceiling of a building. The lifting device comprises an intermediate storage (37) for the lightweight prefabricated elements and a lifting unit (22) provided with a gripping means (23, 36) for transferring the lightweight prefabricated elements from the intermediate storage to the installation site. According to the invention, the lifting device equipped with the intermediate storage incorporates at least one work station (26) for the installer (35) installing the lightweight element (21) in place. When there are two work stations (26a, 26b), the first work station (26a) is intended for the installer (35a) installing the first end of the lightweight prefabricated element (21) in place, and the second work station (26b) for the installer (35b) installing the opposite end of the lightweight prefabricated element in place. In a most preferred embodiment, the work stations (26a, 26b) are connected to turning booms (25a, 25b), which are mounted on the frame (24) of the lifting device so that the work stations are movable in both vertical and lateral directions.

    Nacelle élévatrice et procédé de pose d'un élément de cloison au moyen d'une telle nacelle
    57.
    发明公开
    Nacelle élévatrice et procédé de pose d'un élément de cloison au moyen d'une telle nacelle 审中-公开
    高空作业平台和方法,用于通过使用这样的工作平台安装壁元件

    公开(公告)号:EP1350755A1

    公开(公告)日:2003-10-08

    申请号:EP03356035.0

    申请日:2003-02-27

    申请人: Pinguely-Haulotte

    发明人: Beji, Salah

    IPC分类号: B66F11/04 E04F21/18

    摘要: Cette nacelle élévatrice comprend un ensemble auto-moteur (2) équipé d'une structure (5) apte à élever plus ou moins une plate-forme principale (6) de support de charge et/ou de personnel (O). La plate-forme principale (6) est allongée et équipée, au niveau de chacune de ses extrémités (6A, 6B), d'une plate-forme secondaire (7, 8) dont la hauteur ( h 7 , h 8 ) par rapport à la plate-forme principale (6) est réglable au moyen d'une structure élévatrice secondaire (9, 10) prenant appui sur la plate-forme principale (6).
    Application, notamment, à la pose d'éléments de bardage (B).

    摘要翻译: 升降机用于构建外观组件具有带有剪刀式连杆机构的驱动马达(2)(5)以升高和降低一个平台(6)承载的负载。 负载平台具有次级平台(7.8),其具有高度上可调节的。 第二提升驱动控制第二平台的到主平台的相对高度。 权利要求书包括的处理分区和利用提升外观组件的方法。

    Apparatus for positioning a load
    58.
    发明公开
    Apparatus for positioning a load 审中-公开
    一种用于定位的负载装置

    公开(公告)号:EP1132546A3

    公开(公告)日:2002-04-03

    申请号:EP01302096.1

    申请日:2001-03-07

    IPC分类号: E04G21/16

    摘要: Apparatus for the positioning of a cladding panel (1) comprises a trestle (2) having a load-bearing surface (15), for supporting a load support beam (16) having load-engagement means (19, 40) projecting beyond the load-bearing surface (15) of the trestle (2). A second trestle (21) provides means (22, 24, 25) for counteracting the turning moment acting on the load support beam (16) when carrying the cladding panel (1). The position of the cladding panel (1) is adjustable by varying the position of the load support beam (16) on the load-bearing surface (15) of trestle (2).

    METHOD AND DEVICE FOR INSTALLING LIGHT-WEIGHT PANEL UNITS
    59.
    发明授权
    METHOD AND DEVICE FOR INSTALLING LIGHT-WEIGHT PANEL UNITS 失效
    方法和设备安装轻质面板元素

    公开(公告)号:EP0755475B1

    公开(公告)日:2000-03-01

    申请号:EP95912275.5

    申请日:1995-03-17

    申请人: Inkeroinen, Jukka

    发明人: Inkeroinen, Jukka

    IPC分类号: E04G21/16

    摘要: PCT No. PCT/FI95/00145 Sec. 371 Date Nov. 27, 1996 Sec. 102(e) Date Nov. 27, 1996 PCT Filed Mar. 17, 1995 PCT Pub. No. WO95/25210 PCT Pub. Date Sep. 21, 1995A method for installing light-weight panel units according to which the light-weight panel units are installed on a wall or roof in such a way that at least two panel units at a time are moved to the vicinity of the installation site. After that, the panel units that have been moved are installed in place one by one. The installation device incorporates an intermediate storage unit, in which can be stored at least two light-weight panel units. The intermediate storage unit can be moved during installation to the installation site in the vicinity of a wall or roof and it incorporates equipment which transfers one light-weight panel unit at a time to the installation site.

    摘要翻译: PCT号 PCT / FI95 / 00145秒。 371日期1996年11月27日二段。 102(e)中的日期1996年11月27日提交的PCT 1995年3月17日的PCT公布。 号 WO95 / 25210的PCT公布。 九月日期 21,用于雅于安装在墙壁或屋顶中寻求的方式轻质面板单元丁安装轻质板单元1995年a方法并在至少两个板单元在一个时间被移动到安装位点附近。 在此之后,面板单位thathave被移动通过一个安装在地方之一。 安装器件集成在中间存储单元,在其中可以存储在至少两个光重量面板单元。 中间存储单元可以在安装期间,在墙壁或屋顶的附近移动到安装位置和它结合设备哪一个轻质面板单元在一个时间到安装现场传送。

    Vorrichtungen und Verfahren zum Handhaben plattenförmiger Elemente
    60.
    发明公开
    Vorrichtungen und Verfahren zum Handhaben plattenförmiger Elemente 审中-公开
    Vorrichtungen und Verfahren zum HandhabenplattenförmigerElemente

    公开(公告)号:EP0960992A2

    公开(公告)日:1999-12-01

    申请号:EP99110015.7

    申请日:1999-05-21

    IPC分类号: E04G21/16 B62B3/10

    摘要: Die Erfindung betrifft die Handhabung plattenförmiger Elemente (16,17,18). Herkömmlich werden bei der Montage vorgefertigter Wandelemente die Wandelemente von Arbeitskräften zum Montageort getragen und dort von Hand aufgerichtet. Dies ist nachteilig wegen der großen Anzahl der für diesen Arbeitsgang benötigten Arbeitskräfte. Die Erfindung löst das Problem diesen Arbeitsgang günstiger zu gestalten. Die Erfindung schlägt daher vor wenigstens ein auf einer ersten Kante im wesentlichen aufrecht stehendes plattenförmiges Element (16,17,18) aufzunehmen, das plattenförmige Element über eine seiner Ecken zu kippen, insbesondere derart, daß es in eine schrägliegende Position gelangt, in der eine der ersten Kante benachbarte zweite, insbesondere kurze, Kante nach unten weist und im wesentlichen waagerecht ausgerichtet wird und es in einer auf der zweiten Kante im wesentlichen aufrecht stehende Position aufgerichtet wird.

    摘要翻译: 重型面板处理系统 预制混凝土模块施工。 该系统使用多个轮式支撑件,其具有第一凸缘(14),面板在其上倾斜边缘并承载在接近垂直的位置。 该系统具有其他地面支撑(3),使面板能够倾斜到水平位置。 这通过在倾翻期间滚动的弯曲轮廓法兰(12)来辅助。 面板以最少的手动方式移动。