HIGH VOLTAGE INSULATING SLEEVE FOR NUCLEAR WELL LOGGING
    71.
    发明公开
    HIGH VOLTAGE INSULATING SLEEVE FOR NUCLEAR WELL LOGGING 审中-公开
    用于核井测井的高压绝缘套管

    公开(公告)号:EP2666038A2

    公开(公告)日:2013-11-27

    申请号:EP12744806.6

    申请日:2012-02-07

    CPC classification number: H01B19/04 E21B47/01 Y10T29/49227

    Abstract: A well logging instrument includes an instrument housing to traverse a wellbore penetrating subsurface formations. An electrically operated energy source that emits ionizing radiation is disposed inside the housing. An insulating sleeve is disposed between the energy source and an interior wall of the housing. The insulating sleeve comprises a thin dielectric film arranged in a plurality of tightly fitting layers of dielectric material disposed adjacent to each other and successively. A thickness of each layer and a number of layers is selected to provide a dielectric strength sufficient to electrically insulate the energy source from the housing and to provide a selected resistance to dielectric failure resulting from the ionizing radiation.

    Abstract translation: 测井仪器包括穿过穿过地下地层的井筒的仪器外壳。 发射电离辐射的电动能源设置在壳体内部。 绝缘套筒设置在能量源与壳体的内壁之间。 该绝缘套管包括一个薄的介质膜,该介质膜被布置在多个彼此相邻并相继布置的介电材料的紧密配合的层中。 选择每个层的厚度和多个层以提供足以将能量源与外壳电绝缘的介电强度,并提供由电离辐射引起的对介电失效的选择的抗性。

    METHODS TO ENHANCE THE PRODUCTIVITY OF A WELL
    76.
    发明公开
    METHODS TO ENHANCE THE PRODUCTIVITY OF A WELL 审中-公开
    法井的提高生产率

    公开(公告)号:EP2633156A1

    公开(公告)日:2013-09-04

    申请号:EP11839820.5

    申请日:2011-11-03

    CPC classification number: E21B43/267

    Abstract: The application discloses a method of treating a subterranean formation of a well bore, including providing a first treatment fluid substantially free of macroscopic particulates; pumping the first treatment fluid into the well bore at different pressure rates to determine the maximum matrix rate and the minimum frac rate; pumping the first treatment fluid above the minimum frac rate to initiate a fracture; providing a second treatment fluid comprising a second carrier fluid, a particulate blend including a first amount of particulates having a first average particle size between about 100 and 2000 µm and a second amount of particulates having a second average particle size between about three and twenty times smaller than the first average particle size, such that a packed volume fraction of the particulate blend exceeds 0.74; pumping the second treatment fluid below the minimum frac rate; and allowing the particulates to migrate into the fracture.

    Systems and methods for measuring borehole caliper in oil-based mud
    80.
    发明公开
    Systems and methods for measuring borehole caliper in oil-based mud 审中-公开
    在Schlamm aufÖlbasis的系统和VerfahrenfürBohrlochmessschieber

    公开(公告)号:EP2607929A1

    公开(公告)日:2013-06-26

    申请号:EP11290610.2

    申请日:2011-12-23

    Abstract: Systems and methods for estimating standoff and/or caliper in a wellbore for oil-based mud drilling are provided. The systems include a sensor having a primary electrode and at least two secondary electrodes, and an electronics subsystem having a controller and a processor for driving the system and correlating current measurements with standoff and/or caliper. The electrodes are positioned relative to one another such that there is a distinct flow of current between the primary electrode and each secondary electrode. In operation, a single excitation frequency is applied to the primary electrode and a simultaneous measurement of current flowing between the primary electrode and each secondary electrode is obtained. Standoff is estimated from the measurements. The estimations can be independent of formation properties when an appropriate excitation frequency is used.

    Abstract translation: 提供了用于估算用于油基泥浆钻井的井眼中的间隙和/或卡尺的系统和方法。 该系统包括具有主电极和至少两个次级电极的传感器,以及具有用于驱动系统的控制器和处理器的电子系统子系统,并且将电流测量与支座和/或卡尺相关联。 电极相对于彼此定位,使得在主电极和每个次电极之间存在明显的电流。 在操作中,对主电极施加单个激发频率,并且获得在初级电极和每个次级电极之间流动的电流的同时测量。 距离估计是从测量。 当使用适当的激发频率时,估计可以独立于地层特性。

Patent Agency Ranking