-
公开(公告)号:EP2809467A4
公开(公告)日:2016-03-23
申请号:EP13743933
申请日:2013-01-30
Applicant: METALDYNE LLC
Inventor: CHERNENKOFF RUSSELL A
CPC classification number: F16C7/023 , B21K1/766 , B22F3/17 , B22F3/24 , B22F5/10 , B22F2003/248 , B22F2999/00 , C21D9/40 , C22C1/02 , C22C33/0264 , F16C9/04 , F16C33/14 , F16C2202/04 , F16C2204/64 , F16C2220/20 , F16C2220/46 , F16C2223/18 , F16C2240/06 , F16C2240/60 , F16C2360/22 , F16C2360/42 , F16J7/00 , B22F2202/07
-
公开(公告)号:EP1834118B1
公开(公告)日:2014-02-12
申请号:EP05854842.1
申请日:2005-12-21
Applicant: Metaldyne, LLC
CPC classification number: F16K15/044 , F01M1/08 , F01P3/08 , F16K15/025 , Y10T137/7914 , Y10T137/7927 , Y10T137/7937
-
公开(公告)号:EP3221072A2
公开(公告)日:2017-09-27
申请号:EP15861671.4
申请日:2015-11-23
Applicant: Metaldyne, LLC
Inventor: LECHIEN, Jeff
CPC classification number: B23K35/24 , B22F3/1021 , B22F7/064 , B22F2998/10 , B22F2999/00 , B23K35/0222 , B23K35/0244 , B23K35/30 , B23K35/302 , B23K35/3053 , B23K35/306 , B23K35/3066 , B23K35/3073 , B23K35/308 , B23K35/3086 , B23K35/36 , B22F7/06 , B22F2201/013 , B22F2201/02 , B22F2201/12 , B22F2201/30 , B22F2201/50 , B22F3/02 , B22F3/26 , B22F3/1007
Abstract: The present application describes an article having a first metal component joined to a second metal component by a metallurgic joint of presintered powdered metal interposed between contiguous surfaces of the first metal component and the second metal component. The present application also describes a composition for use in a brazing process comprising a presintered powdered metal. The present application also describes a process for brazing including the following steps: presintering a powdered metal; adding the presintered powdered metal to a first and second metal component; and heating the combination of the first and second metal components containing the presintered powdered metal until the powdered metal melts and joins the metal components to form a metallurgic joint.
Abstract translation: 本申请描述了一种制品,该制品具有第一金属部件,该第一金属部件通过介于第一金属部件和第二金属部件的相邻表面之间的预烧结粉末金属的冶金接头连接至第二金属部件。 本申请还描述了包含预烧结粉末金属的用于钎焊过程的组合物。 本申请还描述了一种用于钎焊的方法,包括以下步骤:预烧粉末金属; 将预烧结的粉末金属添加至第一和第二金属组分; 和加热包含预烧结粉末金属的第一和第二金属组分的组合,直到粉末金属熔化并接合金属组分以形成冶金接头。
-
公开(公告)号:EP3221072A4
公开(公告)日:2018-05-09
申请号:EP15861671
申请日:2015-11-23
Applicant: METALDYNE LLC
Inventor: LECHIEN JEFF
IPC: B22F3/10 , B22F1/00 , B22F3/02 , B23K1/00 , B23K35/02 , B23K35/24 , B23K35/30 , B23K35/36 , C22C1/00
CPC classification number: B23K35/24 , B22F3/1007 , B22F3/1021 , B23K35/0222 , B23K35/0244 , B23K35/30 , B23K35/302 , B23K35/3053 , B23K35/306 , B23K35/3066 , B23K35/3073 , B23K35/308 , B23K35/3086 , B23K35/36
Abstract: The present application describes an article having a first metal component joined to a second metal component by a metallurgic joint of presintered powdered metal interposed between contiguous surfaces of the first metal component and the second metal component. The present application also describes a composition for use in a brazing process comprising a presintered powdered metal. The present application also describes a process for brazing including the following steps: presintering a powdered metal; adding the presintered powdered metal to a first and second metal component; and heating the combination of the first and second metal components containing the presintered powdered metal until the powdered metal melts and joins the metal components to form a metallurgic joint.
-
公开(公告)号:EP2809467A1
公开(公告)日:2014-12-10
申请号:EP13743933.7
申请日:2013-01-30
Applicant: Metaldyne, LLC
Inventor: CHERNENKOFF, Russell A.
CPC classification number: F16C7/023 , B21K1/766 , B22F3/17 , B22F3/24 , B22F5/10 , B22F2003/248 , B22F2999/00 , C21D9/40 , C22C1/02 , C22C33/0264 , F16C9/04 , F16C33/14 , F16C2202/04 , F16C2204/64 , F16C2220/20 , F16C2220/46 , F16C2223/18 , F16C2240/06 , F16C2240/60 , F16C2360/22 , F16C2360/42 , F16J7/00 , B22F2202/07
Abstract: A method of forming a connecting rod, the method including the steps of: forming the connecting rod via a powder forging process; forming an integral wear resistant surface inside a bore of the connecting rod via an inductive heating process after completion of the powder forging process.
-
-
-
-