公开(公告)号:EP0838040B1
公开(公告)日:2002-05-22
申请号:EP96924063.9
申请日:1996-07-10
CPC分类号: G02B6/4464 , G02B6/30 , G02B6/4438 , G02B6/4463 , G02B6/502
摘要: A method is described of installing a lightweight (preferably less than 10 g/m) optical fibre unit into a tube by pulling using a pulling member. The pulling member may be attached to the pulling member by a braided sheath, or the pulling member itself be a braided tube.
-
公开(公告)号:EP1499917A2
公开(公告)日:2005-01-26
申请号:EP03784229.1
申请日:2003-06-26
申请人: Emtelle UK Limited
IPC分类号: G02B6/44
CPC分类号: G02B6/4438 , G02B6/4403 , G02B6/443
摘要: A fibre optic cable (1) includes a core of primary coated optical fibres (2) embedded in an inner layer (3) of acrylate material, having sufficient tensile strength when cured to lock at least the outermost fibres (2) in place and still allow the fibres to be easily broken out of the assembly for termination and splicing purposes. The hardness of the acrylate layer (3) is such that at least the outermost fibres (2) of the bundle are restricted from moving axially relative to the inner layer (3). The inner layer (3) is then surrounded by a loose thin jacket (4) formed from a mixture of high density polyethylene having a Shore hardness greater than or equal to 60 and a generally uniformly distributed slip agent, including a polyether modified poly (dimethylsiloxane) material such as polyether modified hydroxy functional poly (dimethylsiloxane) material. The mixture from which the outer layer (4) is formed is compacted by means of heat and pressure. The outer layer (4) may also contain a mineral filler, such as calcium carbonate and/or titanium dioxide, in order to improve the stability of the dimensions of the outer layer (4) as the temperature changes.
-
公开(公告)号:EP1281096B1
公开(公告)日:2005-10-26
申请号:EP01923801.3
申请日:2001-03-23
申请人: Emtelle UK Limited
CPC分类号: H02G1/086 , G02B6/4438 , G02B6/4464 , G02B6/4485
-
公开(公告)号:EP1791686A1
公开(公告)日:2007-06-06
申请号:EP05748309.1
申请日:2005-05-26
申请人: Emtelle UK Limited
CPC分类号: B29C47/92 , B29C47/0016 , B29C47/0023 , B29C47/8895 , B29C47/902 , B29C47/905 , B29C47/908 , B29C2947/92076 , B29C2947/92295 , B29C2947/92428
摘要: A method of manufacturing a tube (8) is disclosed. The method comprises forming a tube (8) by extrusion, causing a body (24) to move longitudinally relative to the internal bore of the tube (8), and determining whether the body (24) ceases to move relative to the tube (8) At least part of said extrusion step and said step of causing a body (24) to move relative to the internal bore of the tube (8) are carried out simultaneously, and the body (24) is caused to move relative to the internal bore of the tube (8) by means of at least one first tensile element (22) attached to said body (24).
-
公开(公告)号:EP1791686B1
公开(公告)日:2014-10-29
申请号:EP05748309.1
申请日:2005-05-26
申请人: Emtelle UK Limited
CPC分类号: B29C47/92 , B29C47/0016 , B29C47/0023 , B29C47/8895 , B29C47/902 , B29C47/905 , B29C47/908 , B29C2947/92076 , B29C2947/92295 , B29C2947/92428
-
公开(公告)号:EP1595175A1
公开(公告)日:2005-11-16
申请号:EP04711404.6
申请日:2004-02-16
申请人: Emtelle UK Limited
IPC分类号: G02B6/50
CPC分类号: G02B6/4464 , G02B6/4471 , Y10T29/49194 , Y10T29/49197
摘要: A method of installing a plurality of cables into a network (30) of ducts is disclosed. The method includes blowing a plurality of cables (34) through a first duct (31) such that a first portion (35) of each of tilt; cables (34) occupies the first duct (31). The plurality of cables (34) are also blown into a plurality of second ducts (32) such that each second duct (32) is occupied by a second portion (37) of at feast one of the plurality of cables (34).
-
公开(公告)号:EP1281096A1
公开(公告)日:2003-02-05
申请号:EP01923801.3
申请日:2001-03-23
申请人: Emtelle UK Limited
CPC分类号: H02G1/086 , G02B6/4438 , G02B6/4464 , G02B6/4485
摘要: An optical fibre cable (1) for installation in a duct (51) by means of fluid flow is described. The cable (1) has a signal transmitting portion comprising a plurality of elongate, flexible optical fibres, surrounded by a braided covering (10) formed from textile yarns (9). The apparatus (50) for installing the cable includes an air compressor (52) for supplying a blowing head (53) with a conditioned air supply substantially free of static electricity or moisture. The blowing head (53) includes drive wheels (not shown), the speed of rotation of which (and hence the speed of installation of the fibre cable (1), (101) is adjusted by means of s control unit (54) powered by power supply (55). The fibre cable (1), (101) is fed from a fibre pan (56) over guide (57) to the blowing´ head (53), which is fed with an air supply from compressor (52) which is regulated by dispenser (58).
-
公开(公告)号:EP1042696B1
公开(公告)日:2002-01-09
申请号:EP98958355.4
申请日:1998-12-07
申请人: Emtelle UK Limited
IPC分类号: G02B6/44
CPC分类号: G02B6/4464 , G02B6/4463
摘要: A method of inserting an unreinforced fibre optic member (5) into a duct (2) is disclosed. An elongate, flexible pull cord (3) is inserted into the duct (2) and is attached adjacent its rearward end to the fibre optic member (5) adjacent a forward end thereof. The forward end of the fibre optic member (5) is then introduced into the duct (2), and fluid such as air is caused to flow along the duct (2) to cause the pull cord (3) and fibre optic member (5) to move into the duct (2).
-
公开(公告)号:EP0838040A1
公开(公告)日:1998-04-29
申请号:EP96924063.0
申请日:1996-07-10
IPC分类号: G02B6
CPC分类号: G02B6/4464 , G02B6/30 , G02B6/4438 , G02B6/4463 , G02B6/502
摘要: A method is described of installing a lightweight (preferably less than 10 g/m) optical fibre unit into a tube by pulling using a pulling member. The pulling member may be attached to the pulling member by a braided sheath, or the pulling member itself be a braided tube.
-
-
-
-
-
-
-
-