DEVICE FOR DISPLAYING DATA USED BY ELECTRONIC COMPONENT MOUNTING MACHINE
    1.
    发明公开
    DEVICE FOR DISPLAYING DATA USED BY ELECTRONIC COMPONENT MOUNTING MACHINE 审中-公开
    设备一台机器用于安装使用的数据电子元件DISPLAYING

    公开(公告)号:EP3032935A1

    公开(公告)日:2016-06-15

    申请号:EP13891322.3

    申请日:2013-08-09

    IPC分类号: H05K13/04

    摘要: A device displays contents of data used by an electronic component mounting machine. The data includes necessity information regarding a plurality of optional functions. The optional functions are functions which are selectively used among the functions of the electronic component mounting machine, and the necessity information is information which describes necessity of use of each of optional functions. The device includes an extraction processing section and a display section. The extraction processing section extracts the necessity information regarding a plurality of optional functions from the data used by the electronic component mounting machine. The display section visually displays the necessity information regarding the plurality of optional functions extracted by the extraction processing section.

    摘要翻译: 甲装置显示电子部件安装机上所用的数据的内容。 该数据包括信息必要性关于可选功能的多个。 的和任选的功能是有选择地将电子部件安装机的功能中使用的功能,该必要性信息是描述每个使用的可选功能的必要性信息。 该装置包括在提取处理部和显示部。 提取处理部提取的必要性信息的关于从由所述电子部件安装机中使用的数据可选功能的多个。 显示部分可视地显示的必要性信息关于由所述提取处理部提取的可选功能的多元性。

    PRODUCTION PLAN DETERMINING METHOD AND DETERMINING DEVICE
    2.
    发明授权
    PRODUCTION PLAN DETERMINING METHOD AND DETERMINING DEVICE 有权
    生产计划确定方法和确定装置

    公开(公告)号:EP2819496B1

    公开(公告)日:2017-11-22

    申请号:EP12869413.0

    申请日:2012-02-20

    发明人: OTANE Shigenao

    IPC分类号: H05K13/04

    CPC分类号: H05K13/08

    摘要: An object is to provide a determination method and a determination apparatus for a production plan which can shorten time for a setup change by interposing an interruption production in an optimal position with respect to the production plan in which production is performed using an electronic component mounting apparatus. The determination method for a production plan includes an interposing-available candidate search process in which an interposing-available candidate in which the interruption production can be interposed within an initial production plan is searched for, a time calculation process for a prior/posterior setup change, in which time for the prior/posterior setup change which is required for the setup change before and after the interruption production is calculated for each searched for interposing-available candidate, and a production plan determination process in which the interruption production is interposed in the interposing-available candidate selected in the initial production plan so as to determine the production plan.

    PRODUCTION PLAN DETERMINING METHOD AND DETERMINING DEVICE
    3.
    发明公开
    PRODUCTION PLAN DETERMINING METHOD AND DETERMINING DEVICE 有权
    方法和设备建立生产计划

    公开(公告)号:EP2819496A1

    公开(公告)日:2014-12-31

    申请号:EP12869413.0

    申请日:2012-02-20

    发明人: OTANE Shigenao

    IPC分类号: H05K13/04

    CPC分类号: H05K13/08

    摘要: An object is to provide a determination method and a determination apparatus for a production plan which can shorten time for a setup change by interposing an interruption production in an optimal position with respect to the production plan in which production is performed using an electronic component mounting apparatus.
    The determination method for a production plan includes an interposing-available candidate search process in which an interposing-available candidate in which the interruption production can be interposed within an initial production plan is searched for, a time calculation process for a prior/posterior setup change, in which time for the prior/posterior setup change which is required for the setup change before and after the interruption production is calculated for each searched for interposing-available candidate, and a production plan determination process in which the interruption production is interposed in the interposing-available candidate selected in the initial production plan so as to determine the production plan.