INFORMATION PROCESSING DEVICE, POWER-CONSUMING BODY, INFORMATION PROCESSING METHOD, AND PROGRAM
    3.
    发明公开
    INFORMATION PROCESSING DEVICE, POWER-CONSUMING BODY, INFORMATION PROCESSING METHOD, AND PROGRAM 审中-公开
    INFORMATIONSVERARBEITUNGSVORRICHTUNG,STROMVERBRAUCHENDERKÖRPER,INFORMATIONSVERARBEITUNGSVERFAHREN UND PROGRAMM

    公开(公告)号:EP3065246A4

    公开(公告)日:2017-08-02

    申请号:EP14857088

    申请日:2014-09-29

    申请人: NEC CORP

    IPC分类号: H02J3/00 G06Q50/06 H02J13/00

    摘要: A time range setting unit (110) sets an operation startable time point at which an operation can be started and a target operation end time point which is the latest time point among time points at which the operation is to be ended, with respect to each of plural power demanding objects (20). A necessary operation time setting unit (120) sets a necessary operation time with respect to each of the plural power demanding objects (20). A shape information acquisition unit (130) acquires shape information from a schedule management device (40). The shape information indicates an assumed shape of a transition line that represents transition in the amount of supplied power in a target period. A demand transition setting unit (140) sets power demand transition information indicating transition in an electric energy demand in the target period so that the necessary operation time is obtained and so that the transition in the electric energy demand generated by the plural power demanding objects (20) being operated accords with the assumed shape.

    摘要翻译: 时间范围设定部(110)针对各时间点设定能够开始操作的操作可开始时间点和结束操作的时间点中的最新时间点即对象操作结束时间点 的多个电力需求物体(20)。 必要运转时间设定部(120)针对多个电力需求对象(20)分别设定必要的运转时间。 形状信息获取单元(130)从日程管理装置(40)获取形状信息。 形状信息表示表示目标期间的供给电力量的推移的推移线的假想形状。 需求转变设定单元(140)设定表示对象期间中的电力需求的转变的电力需求转移信息,以便获得必要的运转时间,并且使得由多个电力需求对象生成的电力需求的转变( 20)正在运行符合假定的形状。