-
公开(公告)号:EP1403748A1
公开(公告)日:2004-03-31
申请号:EP02724660.2
申请日:2002-05-01
IPC分类号: G05B19/418 , G06F17/60
CPC分类号: G06Q10/04 , G05B19/41865 , G05B2219/32015 , G05B2219/32062 , G05B2219/32077 , G06Q10/0631 , Y02P90/20
摘要: A computer solves an item-based one-dimensional sub-optimization problem independently of the other items (305). For the item-based solution found, the computer determines whether machine interference between the items is eliminated and whether a work-in-process inventory is sufficient (309). If machine interference is not eliminated or the work-in-process inventory is not insufficient, then the computer updates a corresponding Lagrange multiplier (310, 311) and reexecutes step (305).
摘要翻译: 计算机独立于其他项目解决基于项目的一维子优化问题(305)。 对于找到的基于项目的解决方案,计算机可以确定项目之间的机器干扰是否被消除,以及在制品库存是否足够(309)。 如果未消除机器干扰或者半成品库存不足,则计算机更新相应的拉格朗日乘数(310,311)并重新执行步骤(305)。
-
公开(公告)号:EP1403748A4
公开(公告)日:2004-03-31
申请号:EP02724660
申请日:2002-05-01
CPC分类号: G06Q10/04 , G05B19/41865 , G05B2219/32015 , G05B2219/32062 , G05B2219/32077 , G06Q10/0631 , Y02P90/20
摘要: A computer solves an item-by-item linear partial optimization problem independently of other items (305). The computer judges if the mechanical interference between the items with reference to the obtained solution item by item is resolved and if the inventory of the goods in process is sufficient (309). If the mechanical interference is not resolved or if the inventory of the goods in process is not sufficient, the computer updates the corresponding Lagrange's multiplier (310, 311) and executes step 305 again.
-
公开(公告)号:EP1725964A4
公开(公告)日:2008-03-19
申请号:EP04814298
申请日:2004-12-16
发明人: LINDSTROM MIKKO , HAAG MIKAEL
IPC分类号: G05B19/418 , G06F19/00
CPC分类号: G05B19/41865 , G05B2219/31325 , G05B2219/32062 , G05B2219/32283 , G05B2219/45234 , Y02P80/40 , Y02P90/20 , Y10S707/99945
摘要: In a manufacturing system that has a plurality of sheet fabrication machines, to enhance the efficiency of the system, there are provided a plurality of databases each for storing particular data relating to the machines, the types of materials to be used, the tooling of the machines, etc. of the system. When a multi-dimensional model of a component part to be produced by the system is input to the system, selective data is retrieved from the various databases so that at least one machine of the plurality of machines of, the system is selected to produce the part from a worksheet of a chosen material. Concurrently, or shortly thereafter, a NC part program for programming the selected machine to execute the necessary operations in accordance with a flat drawing generated from the multi-dimensional model to fabricate the component part is generated based on selective data retrieved from the databases. With the NC part program, the selected machine performs the operations necessary for producing the component part from the sheet stock material chosen for the component part. If there are multiple component parts to be produced in the same production run, the system would sort the different parts and arrange for the ordered fabrication of the different parts by respective selected machines equipped with corresponding appropriate NC programs to eliminate any potential bottleneck or conflicts that may arise due to the fabrication of multiple parts by multiple machines during the same production run.
-
公开(公告)号:EP1403748B1
公开(公告)日:2007-10-24
申请号:EP02724660.2
申请日:2002-05-01
IPC分类号: G05B19/418
CPC分类号: G06Q10/04 , G05B19/41865 , G05B2219/32015 , G05B2219/32062 , G05B2219/32077 , G06Q10/0631 , Y02P90/20
摘要: A computer solves an item-by-item linear partial optimization problem independently of other items (305). The computer judges if the mechanical interference between the items with reference to the obtained solution item by item is resolved and if the inventory of the goods in process is sufficient (309). If the mechanical interference is not resolved or if the inventory of the goods in process is not sufficient, the computer updates the corresponding Lagrange's multiplier (310, 311) and executes step 305 again.
-
公开(公告)号:EP1725964A2
公开(公告)日:2006-11-29
申请号:EP04814298.8
申请日:2004-12-16
发明人: LINDSTROM, Mikko , HAAG, Mikael
IPC分类号: G06F19/00
CPC分类号: G05B19/41865 , G05B2219/31325 , G05B2219/32062 , G05B2219/32283 , G05B2219/45234 , Y02P80/40 , Y02P90/20 , Y10S707/99945
摘要: In a manufacturing system that has a plurality of sheet fabrication machines, to enhance the efficiency of the system, there are provided a plurality of databases each for storing particular data relating to the machines, the types of materials to be used, the tooling of the machines, etc. of the system. When a multi-dimensional model of a component part to be produced by the system is input to the system, selective data is retrieved from the various databases so that at least one machine of the plurality of machines of, the system is selected to produce the part from a worksheet of a chosen material. Concurrently, or shortly thereafter, a NC part program for programming the selected machine to execute the necessary operations in accordance with a flat drawing generated from the multi-dimensional model to fabricate the component part is generated based on selective data retrieved from the databases. With the NC part program, the selected machine performs the operations necessary for producing the component part from the sheet stock material chosen for the component part. If there are multiple component parts to be produced in the same production run, the system would sort the different parts and arrange for the ordered fabrication of the different parts by respective selected machines equipped with corresponding appropriate NC programs to eliminate any potential bottleneck or conflicts that may arise due to the fabrication of multiple parts by multiple machines during the same production run.
-
-
-
-