해중공원 복합시설물 및 그 시공방법
    1.
    发明授权
    해중공원 복합시설물 및 그 시공방법 有权
    水下公园综合设施和施工方法

    公开(公告)号:KR101852011B1

    公开(公告)日:2018-04-25

    申请号:KR1020170084960

    申请日:2017-07-04

    摘要: 본발명에의하면, 해안선에근접한위치에수직하게설치되어관람객의출입과해상전망기능을제공하는출입탑; 출입탑으로부터소정간격을가지면서해중에배열설치되는다수개의교각; 출입탑으로부터다수개의교각들사이에연속하여설치되는슬래브; 슬래브에위치되고출입탑에연통된상태로슬래브를따라다수개가연속하여설치되어내부중공을통하여관람객들의편의공간이용을위한편의공간출입용통로를제공하는박스형상의통행박스; 통행박스의상측면외주면에소정공간을가지면서커버설치되고관람객들의보행을위한관광용보행통로를제공하여바닷속동식물을감상하면서통행을가능하게하는투명한아크릴재질의관광통로용아크릴통체; 및통행박스의측면으로부터슬래브의측면부위외주면에소정공간을가지면서커버설치되고관람객들의편의를위한편의공간을제공하여바닷속동식물을감상하면서편의공간을이용하도록하는투명한아크릴재질의편의공간용아크릴통체를포함하는해중공원복합시설이제공된다.

    고정식 해양구조물의 해체방법
    2.
    发明公开
    고정식 해양구조물의 해체방법 无效
    固定式离岸结构的分解方法

    公开(公告)号:KR1020160068063A

    公开(公告)日:2016-06-15

    申请号:KR1020140172932

    申请日:2014-12-04

    发明人: 신찬효

    IPC分类号: E02B17/00 E02D29/09

    摘要: 고정식해양구조물의해체방법이개시된다. 본발명의실시예에따른고정식해양구조물의해체방법은한 쌍의레그플랫폼에의해형성된진입공간을구비한운반선을해체작업이필요한해양구조물이설치된해상으로이동시키는이동단계와, 운반선을이동시켜해양구조물의다리를한 쌍의레그플랫폼사이에형성된진입공간에삽입시키는진입단계와, 한쌍의레그플랫폼에설치된그리퍼를이용하여한 쌍의레그플랫폼사이에진입된해양구조물의다리를잡아고정시키는파지단계와, 그리퍼에의해파지된다리의아래쪽부분을절단시켜해양구조물의상부구조물을해저면에고정된다리에서분리시키는절단단계와, 절단된다리부분을그리퍼로파지한상태로해체작업을수행하는육상의해체작업장으로분리된상부구조물을운반선을이용하여예인하는운반단계및 육상의해체작업장으로운반된상부구조물을해체하는해체단계를포함한다.

    摘要翻译: 本发明涉及拆卸固定式离岸结构的方法。 根据本发明的实施例,该方法包括以下步骤:将设置有由一对腿平台形成的进入空间的承载件运送到海上拆除目标的近海结构; 通过移动托架将海上结构的腿部插入形成在一对腿平台之间的进入空间中; 通过使用设置在所述一对腿平台上的夹具来夹持和固定插入在一对腿平台之间的海上结构的腿部; 通过夹持器切割抓握的腿部的下部,以将离岸结构的上部结构与固定在海床上的腿分离; 将所述分离的上部结构由所述载体运送到所述夹持器保持所述切割腿部的陆地上的拆卸处理区域; 拆除上层结构运送至拆除加工区域。

    부유 저장식 가스 발전플랜트 및 그 가스 발전플랜트의 중공 스틸식 시공방법
    3.
    发明公开
    부유 저장식 가스 발전플랜트 및 그 가스 발전플랜트의 중공 스틸식 시공방법 审中-实审
    浮动和储存燃气发电厂和中空钢板类型施工方法

    公开(公告)号:KR1020150026687A

    公开(公告)日:2015-03-11

    申请号:KR1020130125579

    申请日:2013-10-21

    摘要: 본 발명은 부유 저장식 가스 발전플랜트에 관한 것이다.
    본 발명에 따른 부유 저장식 가스 발전플랜트의 중공 스틸식 시공방법은 액화천연가스를 부유 구조물 안에 저장하고, 액화천연가스를 로딩 및 오프 로딩하는 카고 시스템; 상기 카고 시스템의 액화천연가스를 연료가스로 기화시켜 공급하기 위하여 상기 부유 구조물에 설치되는 연료가스 공급시스템; 및 상기 연료가스 공급시스템에서 공급하는 연료가스로 작동하는 가스 동력발생 유닛과, 상기 가스 동력발생 유닛에 의해서 전력을 생산하는 제1 발전기를 구비하는 가스 터빈/엔진 발전 시스템;을 포함하되, 상기 부유 구조물 하부에 설치된 중공 스틸 안에 콘크리트를 타설하여 상기 부유 구조물의 하부가 해저 면에 고정된다.

    摘要翻译: 本发明涉及一种浮动储存燃气发电厂。 根据本发明,浮式储气发电厂的中空钢型施工方法包括:将液化天然气储存在浮动结构中的货物系统,并装载和卸载液化天然气; 安装在浮动结构中的燃料气体供应系统,以便将货物系统中蒸发的液化天然气作为燃料气体供应; 以及燃气轮机/发动机动力系统,其具有由从燃料气体供给系统供给的燃料气体进行运转的燃气发电单元,具有由燃气发电单元发电的第一发电机。 浮动结构的下部通过将混凝土浇铸到安装在浮动结构的下部的中空钢中而固定在海底上。

    부유 저장식 가스 발전플랜트 및 그 가스 발전플랜트의 밸러스트 워터 탱크식 시공방법
    4.
    发明公开
    부유 저장식 가스 발전플랜트 및 그 가스 발전플랜트의 밸러스트 워터 탱크식 시공방법 审中-实审
    浮动和储存燃气发电厂和压载水罐类型施工方法

    公开(公告)号:KR1020150026686A

    公开(公告)日:2015-03-11

    申请号:KR1020130125578

    申请日:2013-10-21

    发明人: 김인일 이원준

    摘要: 본 발명은 부유 저장식 가스 발전플랜트에 관한 것이다.
    본 발명에 따른 부유 저장식 가스 발전플랜트의 밸러스트 워터 탱크식 시공방법은 액화천연가스를 부유 구조물 안에 저장하고, 액화천연가스를 로딩 및 오프 로딩하는 카고 시스템; 상기 카고 시스템의 액화천연가스를 연료가스로 기화시켜 공급하기 위하여 상기 부유 구조물에 설치되는 연료가스 공급시스템; 및 상기 연료가스 공급시스템에서 공급하는 연료가스로 작동하는 가스 동력발생 유닛과, 상기 가스 동력발생 유닛에 의해서 전력을 생산하는 제1 발전기를 구비하는 가스 터빈/엔진 발전 시스템;을 포함하되, 상기 부유 구조물의 밸러스트 워터 탱크 안에 콘크리트를 타설하여 상기 부유 구조물의 하부가 해저 면에 고정된다.

    摘要翻译: 本发明涉及一种浮动储存燃气发电厂。 根据本发明,浮式储气瓦斯发电厂的压载水箱式施工方法包括:将液化天然气储存在浮动结构中的货物系统,并装载和卸载液化天然气; 安装在浮动结构中的燃料气体供应系统,以便将货物系统中蒸发的液化天然气作为燃料气体供应; 以及燃气轮机/发动机动力系统,其具有由从燃料气体供给系统供给的燃料气体进行运转的燃气发电单元,具有由燃气发电单元发电的第一发电机。 浮动结构的下部通过将混凝土浇注到浮动结构的压载水箱中而固定在海底上。

    수저터널의 재난방재 설계 및 시공방법
    5.
    发明公开
    수저터널의 재난방재 설계 및 시공방법 无效
    水下隧道灾害预防措施设计与施工方法

    公开(公告)号:KR1020130092531A

    公开(公告)日:2013-08-20

    申请号:KR1020130089949

    申请日:2013-07-30

    申请人: 김준모

    发明人: 김준모 황일선

    IPC分类号: E02D29/07 E21F16/02 E21F11/00

    摘要: PURPOSE: A disaster prevention design of an underwater tunnel, and a construction method thereof are provided to simplify a construction process and to prevent leakage by making and connecting a multi-tube type vertical structure and a mooring support structure on the ground. CONSTITUTION: A disaster prevention design of an underwater tunnel and a construction method thereof comprise the following steps. A mooring support structure is made and assembled on the ground. A tunnel tube connection box and a vertical multi-tube structure are all made on the ground. One structure is completed by assembling the three structures (a mooring support structure, a tunnel tube connection box, and a vertical multi-tube structure). The completed assembly structure is loaded on a ship, and then installed on a destination. [Reference numerals] (AA) Production and assembly process on the ground; (BB) Production of a mooring support structure, a tunnel tube connection box , and a vertical multi-tube structure; (CC) Assembling of three structures(a mooring support structure, a tunnel tube connection box, and a vertical multi-tube structure) on the ground; (DD) Loading of a completely assembled structure on a barge; (EE) Transport and maritime establishing installation process; (FF) Maritime transport of the completely assembled structure to a destination; (GG) Maritime installation of the completely assembled structure by using a crane for areas with low water depth; (HH) Dropping of the completely assembled structure into the sea for establishing installation in areas with high water depth; (II) Foundation, anchoring, and a tunnel tube installation process; (JJ) Fixing work of the established structure such as piling, onsite drilling, and anchoring; (KK) Installation of the tunnel tube which connects the connection box of the completely assembled structure and the mooring support structure; (LL) Waterproofing and sealing of the joint of the connection box and the tunnel tube; (MM) Connection opening of the connection box and the tunnel tube and upper deck installation processes; (NN) Opening and fixing of the gate of the connection box and the tunnel tube; (OO) Installation of a utility deck on the upper part of the vertical multi-tube above water; (PP) Installation of machinery and equipment such as an elevator and a drainage pump in the vertical multi-tube and the connection box; (S-05) Completion of installation in a target area

    摘要翻译: 目的:提供水下隧道的防灾设计及其施工方法,以简化施工过程,并通过在地面上制造和连接多管式垂直结构和系泊支撑结构来防止泄漏。 构成:水下隧道的防灾设计及其施工方法包括以下步骤。 在地面上制作和组装系泊支撑结构。 隧道管连接箱和垂直多管结构都在地面上。 通过组装三个结构(系泊支撑结构,隧道管连接盒和垂直多管结构)来完成一个结构。 完成的装配结构装载在船上,然后安装在目的地。 (附图标记)(AA)地面的生产和组装过程; (BB)生产系泊支撑结构,隧道管接线箱和垂直多管结构; (CC)在地面上组装三个结构(系泊支撑结构,隧道管连接箱和垂直多管结构); (DD)在驳船上装载完全组装的结构; (EE)运输和海上建立安装过程; (FF)将完全组装的结构运输到目的地; (GG)通过在水深较低的地区使用起重机海上安装完全组装的结构; (HH)将完全组装的结构物落入海中,在高深度的地区建立安装; (二)基础,锚固和隧道管安装工艺; (JJ)既定结构的固定工作,如打桩,现场钻孔和锚固; (KK)安装连接完全组装结构的接线盒和系泊支撑结构的隧道管; (LL)连接箱和隧道管接头的防水密封; (MM)连接箱和隧道管与上甲板安装过程的连接开口; (NN)连接箱和隧道管门的开启和固定; (OO)在水面上方的垂直多管上部安装实用甲板; (PP)在垂直多管和接线盒中安装电梯和排水泵等机械设备; (S-05)完成目标区域的安装

    수처리장의 도류벽 조립구조 및 이의 시공방법
    6.
    发明授权
    수처리장의 도류벽 조립구조 및 이의 시공방법 有权
    导轨水处理厂组装结构及其施工方法

    公开(公告)号:KR101286255B1

    公开(公告)日:2013-07-15

    申请号:KR1020130027132

    申请日:2013-03-14

    发明人: 이호석 정경자

    摘要: PURPOSE: A guide wall assembly structure of a water treatment plant and a construction method thereof are provided to prevent the corrosion and contamination of a water treatment plant due to the leakage of treatment water stored in the water treatment plant without forming a through-hole in a synthetic resin sheet used for finishing the column structure, bottom surface, and lateral wall of the plant. CONSTITUTION: A guide wall assembly structure (100) of a water treatment plant comprises a bottom connection part (150), one or more middle connecting parts (160), a top joint (170), a fixing member (180), a bottom surface fixing part (190), and a ceiling connection part (200). The bottom connection part connects synthetic resin sheets (130) finished on the bottom end and bottom surface of a guide wall (140). A middle connecting part connects a column structure (120) and the middle part of the guide wall. The top joint accepts the top end of the guide wall to connect. The fixing member fixes bottom, middle, and top connection parts with the guide wall. The bottom surface fixing part is mounted on the bottom connection part to be overlapped on a pair of guide walls which is in touch with the lateral side of the bottom connection part. The bottom surface fixing part is fixed by being settled in a synthetic resin sheet. The ceiling connection part connects the top connection part and the ceiling of a water treatment plant to prevent the movement of the guide wall.

    摘要翻译: 目的:提供一种水处理设备的引导壁组件结构及其施工方法,以防止水处理厂因存储在水处理设备中的处理水泄漏而导致腐蚀和污染,而不会形成通孔 用于整理植物的柱结构,底表面和侧壁的合成树脂片。 构造:水处理设备的引导壁组件结构(100)包括底部连接部分(150),一个或多个中间连接部分(160),顶部接头(170),固定部件(180),底部 表面固定部分(190)和天花板连接部分(200)。 底部连接部连接在导向壁(140)的底端和底面上完成的合成树脂片(130)。 中间连接部分连接柱结构(120)和引导壁的中间部分。 顶部接头接受导向墙的顶端连接。 固定构件将底部,中间和顶部连接部分与引导壁固定。 底面固定部分安装在底部连接部分上,以重叠在与底部连接部分的侧面接触的一对导向壁上。 底面固定部通过沉降在合成树脂片中而固定。 天花板连接部分连接水处理设备的顶部连接部分和天花板,以防止导向壁移动。

    경제타당성 및 재정건전성을 갖춘 해저터널
    7.
    发明公开
    경제타당성 및 재정건전성을 갖춘 해저터널 无效
    具有经济和财务可行性的地下隧道

    公开(公告)号:KR1020130055710A

    公开(公告)日:2013-05-29

    申请号:KR1020110121271

    申请日:2011-11-19

    申请人: 심상근

    发明人: 심상근

    IPC分类号: E02D29/063 E02D29/09

    摘要: PURPOSE: An undersea tunnel with economic efficiency and financial integrity is provided to activate cultural exchanges and tourist industry and develop public transportation facilities by crossing continents and lands. CONSTITUTION: An undersea tunnel with economic efficiency and financial integrity comprises a tunnel(3), a public transportation(4), and multipurpose buildings(5a-5d). The undersea tunnel is built by crossing the seabed(2) with multipurpose buildings at proper gaps between. The buildings are connected to the tunnel. The public transportation runs along the tunnel. A multipurpose building comprises a shopping mall, living accommodations, leisure facilities, and restaurants. The goods and commodities are delivered to the multipurpose building by vessels. The public transportation comprises a train or transportation similar to the train. [Reference numerals] (AA) Land 1; (BB) Land 2

    摘要翻译: 目的:提供经济效益和财务廉洁的海底隧道,激活文化交流和旅游业,跨越陆路开发公共交通设施。 规定:经济效益和财务完整的海底隧道包括隧道(3),公共交通工具(4)和多功能建筑(5a-5d)。 海底隧道是通过海底(2)与多用途建筑物之间的适当间隙穿过而建造的。 建筑物连接隧道。 公共交通工具沿着隧道运行。 多功能建筑包括购物中心,客厅,休闲设施和餐厅。 货物和商品由船只运送到多用途建筑物。 公共交通工具包括火车或类似火车的交通工具。 (附图标记)(AA)土地1; (BB)土地2

    강관말뚝 기초와 조립식 구조물을 사용한 해상풍력 구조물 및 그 시공 방법
    8.
    发明授权
    강관말뚝 기초와 조립식 구조물을 사용한 해상풍력 구조물 및 그 시공 방법 有权
    使用钢管桩基础和预制结构的海上风力涡轮机结构及其构造方法

    公开(公告)号:KR101171201B1

    公开(公告)日:2012-08-07

    申请号:KR1020110142806

    申请日:2011-12-26

    摘要: PURPOSE: An offshore wind power structure having a steel pipe foundation and a construction method thereof are provided to be reused by easily replacing a nacelle while applying a concrete tower structure. CONSTITUTION: An offshore wind power structure having a steel pipe foundation comprises a steel pipe pile(140), a foundation connection(150), a tower(110), berthing and inspection facilities(160), and a apparatus for connecting a steel pipe pile. The steel pipe pile is fixed under the sea. The foundation connection is precast, and connected to an upper part of the steel pipe pile. The foundation connection comprises a concrete spread foundation, a tower foundation, a steel pipe pile foundation, and a work hole. The tower foundation is installed in the center of the concrete spread foundation. The steel pipe pile foundation is connected to a lower part of the concrete spread foundation. The work hole is penetrated through the concrete spread foundation.

    摘要翻译: 目的:提供一种具有钢管基础及其施工方法的海上风力发电结构,通过在施加混凝土塔架结构的同时轻松更换机舱来重新使用。 构成:具有钢管基础的海上风力发电结构包括钢管桩(140),基础连接(150),塔架(110),停泊和检查设施(160),以及用于连接钢管 桩。 钢管桩固定在海下。 基础连接是预制的,并连接到钢管桩的上部。 基础连接包括混凝土铺设基础,塔架基础,钢管桩基础和工作孔。 塔式基础安装在混凝土铺设基础的中心。 钢管桩基础连接到混凝土铺设基础的下部。 工作孔穿透混凝土铺设基础。

    셀식 가물막이 공법
    9.
    发明公开
    셀식 가물막이 공법 有权
    细胞类型临时LEVEE保护方法

    公开(公告)号:KR1020110092659A

    公开(公告)日:2011-08-18

    申请号:KR1020100012206

    申请日:2010-02-10

    发明人: 박호성 김민석

    摘要: PURPOSE: A construction method of a cell type temporary levee is provided to construct a cell type temporary levee at an accurate position by installing sheet piles at an accurate position. CONSTITUTION: A construction method of a cell type temporary levee is as follows. A temporary structure, composed of multiple templates, is assembled in a construction field(S101). The temporary structure is transferred to an installation position on the sea using a sea crane(S102). The transferred temporary structure is set at an installation position(S104). Pin files are inserted into multiple insertion holes formed on the outer surfaces of the templates of the temporary structure and are inserted into a sea bottom(S106). Chaser piles are coupled to the top of each pile(S107). Working plate forms are installed in each chaser pile(S108). Multiple master piles are installed outside the temporary structure(S109). Multiple sheet piles are located between the outer surface of the temporary structure and each master pile(S110).

    摘要翻译: 目的:提供细胞型临时堤坝的施工方法,通过在正确的位置安装板桩,在准确的位置构建细胞型临时堤坝。 构成:细胞型临时堤坝的施工方法如下。 由多个模板构成的临时结构在构造领域中组装(S101)。 使用海上起重机将临时结构转移到海上的安装位置(S102)。 传送的临时结构设置在安装位置(S104)。 销文件被插入到形成在临时结构的模板的外表面上的多个插入孔中并插入到海底(S106)中。 追踪桩与每堆的顶部相连(S107)。 在每个追击桩中安装工作板形式(S108)。 多个主桩安装在临时结构之外(S109)。 多个板桩位于临时结构的外表面和每个主桩之间(S110)。

    수중 구조물과 수중 구조물의 시공방법
    10.
    发明公开
    수중 구조물과 수중 구조물의 시공방법 失效
    水下结构及其构造方法

    公开(公告)号:KR1020090047804A

    公开(公告)日:2009-05-13

    申请号:KR1020070113843

    申请日:2007-11-08

    申请人: 박호근

    发明人: 박호근

    摘要: 본 발명은 교각을 포함하는 수중 구조물에 있어서, 교각과 이격되게 위치하되, 하상 아래의 지반에 콘크리트가 타설되어 서로 연결설치된 기초파일과, 교각의 외측 일부분 또는 전부분에 위치하되, 기초파일의 상부 일부분과 끼워지도록 일부분에 제 1 요철부가 포함되어 형성되고, 제 1 요철부의 상부 일부분에 제 1 요철부와 대응되도록 제 2 요철부가 포함되어 형성되며, 제 2 요철부중 요부의 내부 일부분과 제 1 요철부중 철부의 내부 일부분을 관통하는 관통홀이 포함되어 형성되고, 제 2 요철부중 철부의 상부 일부분에 철근 또는 PC 강선이 포함되어 설치된 연결부와, 관통홀에 삽입되고 콘크리트가 타설되어 서로 연결설치된 기초파일과 선택적으로 체결되는 체결부 및 철근 또는 상기 PC 강선을 감싸도록 일부분에 연결홈이 포함되어 형성된 우물통을 포함하는 수중 구조물을 제공한다.
    또한, 본 발명은 교각을 포함하는 수중 구조물의 시공방법에 있어서, 교각과 이격되도록 위치시키되, 거푸집을 이용하여 하상 아래의 지반에 콘크리트를 타설하여 기초파일을 서로 연결설치하는 기초파일 설치단계와, 교각의 외측 일부분 또는 전부분에 위치시키되, 거푸집을 이용하여 기초파일의 상부 일부분과 끼워지도록 일부분에 제 1 요철부를 포함하여 형성시키고, 제 1 요철부의 상부 일부분에 제 1 요철부와 대응되도록 제 2 요철부를 포함하여 형성시키며, 제 2 요철부중 요부의 내부 일부분과 제 1 요철부중 철부의 내부 일부분을 관통하는 관통홀을 포함하여 형성시키고, 제 2 요철부중 철부의 상부 일부분에 철근 또는 PC 강선을 포함하여 형 성시키는 연결부 설치단계와 관통홀에 삽입하여 콘크리트가 타설되어 서로 연결설치된 기초파일을 선택적으로 체결하는 체결부 설치단계와, 철근 또는 PC 강선을 감싸도록 거푸집을 이용하여 일부분에 연결홈을 포함하여 형성시키는 우물통 설치단계 및 우물통을 크레인으로 인양하여 연결부에 장착하고, 모르타르를 연결홈의 내부에 주입하여 양생시키는 양생단계를 포함하는 수중 구조물의 시공방법을 제공한다.
    수중 구조물, 제 1 요철부, 제 2 요철부, 체결부