METHOD FOR THE CONTROL AND PROTECTION OF A GAS TURBINE AND GAS TURBINE USING SUCH METHOD
    1.
    发明申请
    METHOD FOR THE CONTROL AND PROTECTION OF A GAS TURBINE AND GAS TURBINE USING SUCH METHOD 审中-公开
    使用这种方法控制和保护气体涡轮机和气体涡轮机的方法

    公开(公告)号:US20160010495A1

    公开(公告)日:2016-01-14

    申请号:US14797823

    申请日:2015-07-13

    Abstract: In a method for the control and protection of a gas turbine a gas turbine performance and lifetime indicative process quantity is estimated from a set of available process signals. The gas turbine performance and lifetime indicative process quantity is simultaneously evaluated by two different estimation methods, whereby a first estimation method has a high prediction accuracy, and a second estimation method has a high availability, a continuous adaptation of the second estimation method is conducted in order to align the output signals of the two estimation methods, and in case of a failure detected in the supervision of the first estimation method the adaptation of the second estimation method is stopped, and the output of the first estimation method is switched to the output of the second estimation method.

    Abstract translation: 在用于控制和保护燃气轮机的方法中,从一组可用的过程信号估计燃气轮机性能和寿命指示过程量。 通过两种不同的估计方法同时评估燃气轮机性能和寿命指示处理量,由此第一估计方法具有高预测精度,第二估计方法具有高可用性,第二估计方法的连续适应在 为了对准两种估计方法的输出信号,并且在监视第一估计方法时检测到故障的情况下,停止第二估计方法的调整,并且将第一估计方法的输出切换到输出 的第二估计方法。

    METHOD OF ESTIMATING THE MAXIMUM POWER GENERATION CAPACITY AND FOR CONTROLLING A SPECIFIED POWER RESERVE OF A SINGLE CYCLE OR COMBINED CYCLE GAS TURBINE POWER PLANT, AND A POWER GENERATING SYSTEM FOR USE WITH SAID METHOD
    2.
    发明申请
    METHOD OF ESTIMATING THE MAXIMUM POWER GENERATION CAPACITY AND FOR CONTROLLING A SPECIFIED POWER RESERVE OF A SINGLE CYCLE OR COMBINED CYCLE GAS TURBINE POWER PLANT, AND A POWER GENERATING SYSTEM FOR USE WITH SAID METHOD 有权
    估算最大发电量和控制单循环或组合循环气体发电厂的指定功率储备的方法,以及使用方法的发电系统

    公开(公告)号:US20130074513A1

    公开(公告)日:2013-03-28

    申请号:US13683359

    申请日:2012-11-21

    Abstract: An estimation unit can estimate, on a real-time basis, a maximum power generation capacity of a single cycle or combined cycle gas turbine power plant. For example, the actual power output and the maximum power generation capacity can be calculated relying on a mathematical process model. Subsequently, the calculated actual power output can be compared with the measured power output yielding a model-estimation error. Based on the model-estimation error, a correction signal can be deduced, to correct the calculated maximum power generation capacity. A controller can maintain a specified power reserve. The controller can use an estimate of the maximum power generation capacity as a reference, subtract a load offset, and apply the resulting signal as upper limit of the load set-point.

    Abstract translation: 估计单元可以实时地估计单个循环或联合循环燃气轮机发电厂的最大发电能力。 例如,实际功率输出和最大发电量可以依赖于数学过程模型来计算。 随后,将计算出的实际功率输出与测得的功率输出进行比较,产生模型估计误差。 基于模型估计误差,可以推导出校正信号,以校正计算出的最大发电量。 控制器可以保持指定的动力储备。 控制器可以使用最大发电量的估计作为参考,减去负载偏移,并将结果信号作为负载设定点的上限。

    GAS TURBINE AND METHOD TO OPERATE THE GAS TURBINE
    3.
    发明申请
    GAS TURBINE AND METHOD TO OPERATE THE GAS TURBINE 审中-公开
    气体涡轮机和操作气体涡轮的方法

    公开(公告)号:US20150082801A1

    公开(公告)日:2015-03-26

    申请号:US14492664

    申请日:2014-09-22

    CPC classification number: F23R3/346 F02C7/228

    Abstract: It is proposed a gas turbine and a method to operate the gas turbine. A fluid is supplied to the gas turbine by means of fluid paths. A first fluid path is divided into a second and third fluid path. A first control valve controls a fluid mass flow in the first fluid path. A second control valve controls a ratio of fluid mass flows in the second and third fluid paths.

    Abstract translation: 提出了一种燃气轮机和操作燃气轮机的方法。 流体通过流体路径供应到燃气轮机。 第一流体路径被分成第二和第三流体路径。 第一控制阀控制第一流体路径中的流体质量流动。 第二控制阀控制第二和第三流体路径中的流体质量流量的比率。