公开(公告)号:US11494280B2
公开(公告)日:2022-11-08
申请号:US16844443
申请日:2020-04-09
Applicant: HEWLETT PACKARD ENTERPRISE DEVELOPMENT LP
Inventor: David F. Heinrich , Scott Faasse
IPC: G06Q30/04 , G06F11/30 , G06F11/34 , G06F1/3206 , G06F9/50
Abstract: Examples described herein relate to consumption monitoring device and method for changing a client for its use of a networked resource. The consumption monitoring device may receive information regarding an out-of-band (OOB) performance parameter from a manageability controller corresponding to a networked resource subscribed by the client. The consumption monitoring device may determine a resource consumption metric corresponding to the networked resource for the client based at least on the information regarding the OOB performance parameter received from the manageability controller. The client may be charged based on the resource consumption metric.
-
公开(公告)号:US11366673B1
公开(公告)日:2022-06-21
申请号:US17183751
申请日:2021-02-24
Applicant: Hewlett Packard Enterprise Development LP
Inventor: Patrick Schoeller , David Heinrich , Scott Faasse
IPC: G06F9/44 , G06F1/32 , G06F9/4401 , G06F1/3296 , G06F1/3287
Abstract: Example implementations relate to system and method of managing transitioning of a computing system to a power-on state from a standby-power state. The computing system includes a manageability controller, an initialization controller, an auxiliary device, and a processor. In such examples, the manageability controller may first determine an initialization status of the auxiliary device from a data corresponding to the auxiliary device, when the computing system is transitioning from the standby-power state to the power-on state. In one or more examples, the initialization status may include the auxiliary device in an initialized stage or a non-initialized stage. Later, the manageability controller may direct the initialization controller to delay the transitioning of the computing system from the standby-power state to the power-on state, in response to determining that the initialization status of the auxiliary device is in the non-initialized stage.
-
公开(公告)号:US20210318941A1
公开(公告)日:2021-10-14
申请号:US16844443
申请日:2020-04-09
Applicant: HEWLETT PACKARD ENTERPRISE DEVELOPMENT LP
Inventor: David F. Heinrich , Scott Faasse
IPC: G06F11/30 , G06F11/34 , G06F1/3206 , G06F9/50 , G06Q30/04
Abstract: Examples described herein relate to consumption monitoring device and method for changing a client for its use of a networked resource. The consumption monitoring device may receive information regarding an out-of-band (OOB) performance parameter from a manageability controller corresponding to a networked resource subscribed by the client. The consumption monitoring device may determine a resource consumption metric corresponding to the networked resource for the client based at least on the information regarding the OOB performance parameter received from the manageability controller. The client may be charged based on the resource consumption metric.
-
公开(公告)号:US20190278355A1
公开(公告)日:2019-09-12
申请号:US15916894
申请日:2018-03-09
Applicant: Hewlett Packard Enterprise Development LP
Inventor: Scott Faasse
Abstract: In example implementations, an apparatus is provided. The apparatus includes a context switch block, a processor performance state block, and a task execution block. The context switch block is to perform a context switch. The processor performance state block is to load a processor with a processor performance state stored in a context information associated with a task. The task execution block is to execute the task with the processor operating at the processor performance state loaded from the context information.
-
-
-