Integrated Sand Control Completion System and Method
    1.
    发明申请
    Integrated Sand Control Completion System and Method 有权
    综合砂控完井系统及方法

    公开(公告)号:US20070240881A1

    公开(公告)日:2007-10-18

    申请号:US11279832

    申请日:2006-04-14

    IPC分类号: E21B43/04 E21B43/11

    CPC分类号: E21B43/08 E21B43/10 E21B43/11

    摘要: An integrated sandface completion tool that can be positioned within a wellbore in a single trip and a method of providing a sandface completion in a wellbore. An embodiment of the integrated sandface completion tool includes a casing section having a casing wall, at least one explosive charge connected to the casing wall, and a screen assembly connected within the casing section forming a screen-casing annulus, the screen assembly having openings formed along a portion thereof and a port in selective communication with the screen-casing annulus. The method includes the steps of positioning the integrated completion tool in the wellbore, detonating the explosive charge and packing the screen-casing annulus with a material.

    摘要翻译: 可以在单次行程中定位在井筒内的综合砂面完井工具以及在井眼中提供砂面完井的方法。 综合砂面完井工具的一个实施例包括具有壳体壁的壳体部分,连接到壳体壁的至少一个炸药,以及连接在壳体部分内的筛网组件,形成筛网壳体环,筛组件具有形成的开口 沿其一部分和与屏幕 - 壳体环空间选择性地连通的端口。 该方法包括以下步骤:将集成的完井工具定位在井眼中,引爆炸药,并用一种​​材料包装屏蔽套管环。

    Well Completion System
    2.
    发明申请
    Well Completion System 有权
    完井系统

    公开(公告)号:US20070251690A1

    公开(公告)日:2007-11-01

    申请号:US11380755

    申请日:2006-04-28

    IPC分类号: E21B43/04 E21B43/11

    摘要: An assembly that is usable with a well includes a base pipe, a screen and at least one perforating charge. The base pipe includes at least one radial port to communicate well fluid, and the base pipe has an outer surface. The screen is mounted to the base pipe and is adapted to at least partially surround the base pipe. The radial port(s) of the base pipe are covered by the screen. The perforating charge(s) are mounted to the outer surface of the base pipe.

    摘要翻译: 可用于井的组件包括基管,筛网和至少一个穿孔装料。 基管包括至少一个用于连通流体的径向端口,并且基管具有外表面。 屏幕安装到基管上并且适于至少部分地围绕基管。 基管的径向端口被屏幕覆盖。 穿孔装料安装在基管的外表面上。

    Integrated sand control completion system and method
    3.
    发明授权
    Integrated sand control completion system and method 有权
    综合防砂完井系统及方法

    公开(公告)号:US07546875B2

    公开(公告)日:2009-06-16

    申请号:US11279832

    申请日:2006-04-14

    IPC分类号: E21B43/04 E21B43/11

    CPC分类号: E21B43/08 E21B43/10 E21B43/11

    摘要: An integrated sandface completion tool that can be positioned within a wellbore in a single trip and a method of providing a sandface completion in a wellbore. An embodiment of the integrated sandface completion tool includes a casing section having a casing wall, at least one explosive charge connected to the casing wall, and a screen assembly connected within the casing section forming a screen-casing annulus, the screen assembly having openings formed along a portion thereof and a port in selective communication with the screen-casing annulus. The method includes the steps of positioning the integrated completion tool in the wellbore, detonating the explosive charge and packing the screen-casing annulus with a material.

    摘要翻译: 可以在单次行程中定位在井筒内的综合砂面完井工具以及在井眼中提供砂面完井的方法。 综合砂面完井工具的一个实施例包括具有壳体壁的壳体部分,连接到壳体壁的至少一个炸药,以及连接在壳体部分内的筛网组件,形成筛网壳体环,筛组件具有形成的开口 沿其一部分和与屏幕 - 壳体环空间选择性地连通的端口。 该方法包括以下步骤:将集成的完井工具定位在井眼中,引爆炸药,并用一种​​材料包装屏蔽套管环。

    Safety method and apparatus for a perforating gun
    6.
    发明授权
    Safety method and apparatus for a perforating gun 有权
    穿孔枪的安全方法和装置

    公开(公告)号:US06298924B1

    公开(公告)日:2001-10-09

    申请号:US09641828

    申请日:2000-08-18

    IPC分类号: E21B43117

    CPC分类号: F42D1/055 E21B43/11857

    摘要: An apparatus for use in a subterranean well includes a downhole energy source, a first switch, a second switch, a detonator, a first controller and a second controller. The first switch has a first predetermined state to transfer energy from the energy source, and the second switch has a second predetermined state to transfer the energy from the energy source. A detonator receives the energy from the energy source when the first switch and second switches are concurrently in the first and second predetermined states. A first controller independently detects a predetermined stimulus that is transmitted from the surface of the well and causes the first switch to enter to first predetermined state based on the detection by the first controller. A second controller independently detects the predetermined stimulus transmitted from the surface of the well and causes the second switch to enter the second predetermined state based on the detection by the second controller.

    摘要翻译: 一种用于地下井的装置包括井下能量源,第一开关,第二开关,雷管,第一控制器和第二控制器。 第一开关具有从能量源传递能量的第一预定状态,并且第二开关具有第二预定状态以从能量源传递能量。 当第一开关和第二开关同时处于第一和第二预定状态时,雷管从能量源接收能量。 第一控制器独立地检测从井的表面发送的预定的刺激,并且基于第一控制器的检测使第一开关进入第一预定状态。 第二控制器独立地检测从井的表面发送的预定刺激,并且基于第二控制器的检测使第二开关进入第二预定状态。

    METHODS FOR DETERMINING FORMATION STRENGTH OF A WELLBORE
    7.
    发明申请
    METHODS FOR DETERMINING FORMATION STRENGTH OF A WELLBORE 有权
    确定井筒形成强度的方法

    公开(公告)号:US20130186688A1

    公开(公告)日:2013-07-25

    申请号:US13554649

    申请日:2012-07-20

    IPC分类号: E21B47/06

    CPC分类号: E21B47/06 E21B21/08 E21B43/26

    摘要: A system and a method may determine formation strength of a well. The system and the method may use pressure measurements and temperature measurements to determine controlled fracture pressures before the uncontrolled fracture pressure is reached. The system and the method may use pressure measurements and temperature measurements to determine closure stresses while drilling and may use the closure stresses with core and log measurements to optimize a hydraulic stimulation program.

    摘要翻译: 系统和方法可以确定井的地层强度。 该系统和方法可以使用压力测量和温度测量来确定在达到不受控的断裂压力之前的受控断裂压力。 系统和方法可以使用压力测量和温度测量来确定钻井时的闭合应力,并且可以使用具有岩心和对数测量的闭合应力来优化液压刺激程序。

    PERFORATING WITH WIRED DRILL PIPE
    8.
    发明申请
    PERFORATING WITH WIRED DRILL PIPE 有权
    用有线钻孔管执行

    公开(公告)号:US20100230105A1

    公开(公告)日:2010-09-16

    申请号:US12724187

    申请日:2010-03-15

    IPC分类号: E21B43/116 E21B43/11

    CPC分类号: E21B43/11857 E21B47/04

    摘要: Embodiments of the invention include methods and systems for perforating a well using a wired work string assembly. According to embodiments of the invention, the method includes positioning a wired work string assembly in a wellbore, the work string assembly comprising a plurality of wired pipe communicatively coupled at each joint, a depth correlation tool, and a perforating gun assembly. A depth of the perforating gun assembly is determined from a depth correlation tool positioned within the wellbore, and an electrical signal related to the depth of the perforating gun assembly is transmitted to a surface above the wellbore. Firing of the perforating gun assembly is initiated via a signal transmitted from the surface above the wellbore. An electrical signal from the wellbore is transmitted to the surface to confirming the firing of perforating gun assembly. The system includes various tools for perforating the well using the disclosed methods.

    摘要翻译: 本发明的实施例包括使用有线工作串组件对井进行穿孔的方法和系统。 根据本发明的实施例,该方法包括将有线工作串组件定位在井眼中,工作串组件包括在每个关节处通信地连接的多个有线管,深度相关工具和穿孔枪组件。 穿孔枪组件的深度由位于井眼内的深度相关工具确定,并且与射孔枪组件的深度相关的电信号被传送到井眼上方的表面。 通过从井筒上方的表面传输的信号启动射孔枪组件的射击。 来自井筒的电信号被传递到表面以确认射孔枪组件的点火。 该系统包括用于使用所公开的方法穿孔的各种工具。