Tight Formation Water Shut Off Method with Silica Gel
    1.
    发明申请
    Tight Formation Water Shut Off Method with Silica Gel 有权
    用硅胶紧密形成水切断方法

    公开(公告)号:US20080035343A1

    公开(公告)日:2008-02-14

    申请号:US11740346

    申请日:2007-04-26

    IPC分类号: E21B33/13

    摘要: A delayed gelling system useful in conformance control in the production of petroleum from subterranean formations, especially low permeability formations, is disclosed. The gelling system comprises a basic silica sol, an activator comprising a hydroxyl donor, and an optional syneresis inhibitor. In the disclosed method of using the gelling system, the gelling system may be pumped into formations with excessive water and/or gas production and thermally activated in the formation at downhole conditions to form a hard gel to reduce water and/or gas production.

    摘要翻译: 公开了一种用于从地下地层,特别是低渗透性地层生产石油的一致性控制中的延迟胶凝体系。 胶凝体系包括碱性硅溶胶,包含羟基供体的活化剂和任选的脱水收缩抑制剂。 在所公开的使用胶凝体系的方法中,胶凝体系可以被泵送到具有过多的水和/或气体产生的结构中并且在井下条件下在地层中热激活以形成硬凝胶以减少水和/或气体的产生。

    Tight formation water shut off method with silica gel
    2.
    发明授权
    Tight formation water shut off method with silica gel 有权
    用硅胶紧密形成水切断方法

    公开(公告)号:US07458424B2

    公开(公告)日:2008-12-02

    申请号:US11740346

    申请日:2007-04-26

    IPC分类号: E21B33/13

    摘要: A delayed gelling system useful in conformance control in the production of petroleum from subterranean formations, especially low permeability formations, is disclosed. The gelling system comprises a basic silica sol, an activator comprising a hydroxyl donor, and an optional syneresis inhibitor. In the disclosed method of using the gelling system, the gelling system may be pumped into formations with excessive water and/or gas production and thermally activated in the formation at downhole conditions to form a hard gel to reduce water and/or gas production.

    摘要翻译: 公开了一种用于从地下地层,特别是低渗透性地层生产石油的一致性控制中的延迟胶凝体系。 胶凝体系包括碱性硅溶胶,包含羟基供体的活化剂和任选的脱水收缩抑制剂。 在所公开的使用胶凝体系的方法中,胶凝体系可以被泵送到具有过多的水和/或气体产生的结构中并且在井下条件下在地层中热激活以形成硬凝胶以减少水和/或气体的产生。

    DELAYED POLYACRYLAMIDE-CO-ALUMINUM HYDROXYL CHLORIDE GEL
    3.
    发明申请
    DELAYED POLYACRYLAMIDE-CO-ALUMINUM HYDROXYL CHLORIDE GEL 审中-公开
    延迟聚丙烯酰胺 - 铝 - 氯化铝氯化铝凝胶

    公开(公告)号:US20080035344A1

    公开(公告)日:2008-02-14

    申请号:US11462862

    申请日:2006-08-07

    IPC分类号: E21B33/138 C09K8/44

    摘要: A delayed gelling system useful in conformance control in the production of petroleum from subterranean formations is disclosed. The gelling system comprises an acidic aqueous solution of acid-soluble or cationic polyacrylamide, an at least partially neutralized acid aluminum salt, an activator comprising a hydroxyl donor, and an optional gel modifier. The gelling system may be pumped into formations with excessive water production and thermally activated in the formation at downhole conditions to form a co-gel of polyacrylamide interspersed in an inorganic gel network to reduce water production.

    摘要翻译: 公开了一种用于从地层生产石油的一致性控制中的延迟胶凝体系。 胶凝体系包括酸溶性或阳离子聚丙烯酰胺的水溶液,至少部分中和的酸铝盐,包含羟基供体的活化剂和任选的凝胶改性剂。 胶凝系统可以被泵送到具有过度产水并且在井下条件下在地层中热活化的地层中,以形成分散在无机凝胶网络中的聚丙烯酰胺的共凝胶以减少水的产生。

    OPENHOLE PERFORATING
    4.
    发明申请
    OPENHOLE PERFORATING 有权
    开窗执行

    公开(公告)号:US20110042089A1

    公开(公告)日:2011-02-24

    申请号:US12938093

    申请日:2010-11-02

    IPC分类号: E21B43/11

    摘要: An underbalanced perforating system is disclosed for use in openhole completions to maximize the wellbore and matrix cleanup efficiency, to connect natural fracture patterns, and/or to enable application of new drilling fluid technology in difficult subsurface environments. The perforating system can be used for any hydrocarbon bearing formations with any lithology.

    摘要翻译: 公开了一种用于露天完井的欠平衡穿孔系统,以最大限度地提高井筒和基体清理效率,连接天然断裂模式,和/或使得在困难的地下环境中能够应用新的钻井液技术。 穿孔系统可用于任何具有任何岩性的含烃地层。

    COILED TUBING CONVEYED COMBINED INFLOW AND OUTFLOW CONTROL DEVICES
    5.
    发明申请
    COILED TUBING CONVEYED COMBINED INFLOW AND OUTFLOW CONTROL DEVICES 失效
    联轴器输送组合流入和流出控制装置

    公开(公告)号:US20100108313A1

    公开(公告)日:2010-05-06

    申请号:US12606303

    申请日:2009-10-27

    CPC分类号: E21B43/12 E21B17/20

    摘要: Methods and systems of hydrocarbon production where wellbore stimulation and production is achieved in a single wellbore run-in, and inflow control devices are installed in an existing wellbore completion. A coiled tubing string is conveyed into a substantially horizontal portion of a wellbore, where the coiled tubing string has a production tubular configured to execute both stimulation and recovery operations. The production tubular can include an inflow control device to be installed in an existing wellbore.

    摘要翻译: 在单井井管中实现井眼刺激和生产的碳氢化合物生产方法和系统以及流入控制装置安装在现有的井眼完井中。 连续油管柱被输送到井眼的基本上水平的部分,其中连续油管柱具有被配置为执行刺激和恢复操作的生产管。 生产管状物可以包括要安装在现有井眼中的流入控制装置。

    Methods and Compositions for Controlling Water Production
    6.
    发明申请
    Methods and Compositions for Controlling Water Production 审中-公开
    控制水生产的方法和组成

    公开(公告)号:US20090143257A1

    公开(公告)日:2009-06-04

    申请号:US12030273

    申请日:2008-02-13

    IPC分类号: C09K8/00

    CPC分类号: C09K8/508

    摘要: A composition for treatment of a subterranean formation, which may be used for water control, is comprised of at least one of 1) a premix of an oleochemical polyol, at least one of polyisocyanate, polycyanate and polyisothiocyanate, and a blocking agent to temporarily block all or a portion of free reactive groups of said at least one of polyisocyanate, polycyanate and polyisothiocyanate. Alternatively, or in addition, the composition may be comprised of a solvent and 2) a polyurethane prepolymer formed by reacting an oleochemical polyol and at least one of polyisocyanate, polycyanate and polyisothiocyanate. A blocking agent may also be used with the polyurethane prepolymer. The composition may be used in a method of treating a subterranean formation penetrated by a wellbore by introducing the composition into the formation through the wellbore. In another embodiment, a method of treating a subterranean formation penetrated by a wellbore is carried out by forming a treatment fluid containing at least one of 1) palmitic acid or its derivatives and 2) palm oil and at least one of an hydrolyzing or oxidizing agent to facilitate formation of palmitic acid or its derivatives. The treatment fluid also includes a source of a monovalent ions. The treatment fluid is introduced into the wellbore for treatment of the subterranean formation.

    摘要翻译: 用于处理可用于水控制的地层的组合物包括以下中的至少一种:油性化学多元醇,多异氰酸酯,聚氰酸酯和多异硫氰酸酯中的至少一种的预混物和用于暂时阻断 所述或一部分所述至少一种多异氰酸酯,聚氰酸酯和多异硫氰酸酯的游离反应性基团。 或者或另外,组合物可以由溶剂组成,和2)通过使油化学多元醇与多异氰酸酯,聚氰酸酯和多异硫氰酸酯中的至少一种反应形成的聚氨酯预聚物。 聚氨酯预聚物也可以使用封端剂。 该组合物可以用于通过将组合物通过井筒引入地层来处理由井眼渗透的地层的方法。 在另一个实施方案中,通过形成含有1)棕榈酸或其衍生物中的至少一种的处理流体和2)棕榈油和水解或氧化剂中的至少一种来处理由井眼渗透的地层的方法 以促进形成棕榈酸或其衍生物。 处理液还包括一价离子源。 将处理流体引入井筒中用于处理地下地层。

    Selective stimulation with selective water reduction
    7.
    发明授权
    Selective stimulation with selective water reduction 有权
    选择性减水的选择性刺激

    公开(公告)号:US07008908B2

    公开(公告)日:2006-03-07

    申请号:US10302075

    申请日:2002-11-22

    IPC分类号: E21B33/13 C09K3/00

    摘要: A method for preferentially treating a subterranean formation having at least one primarily oil producing layer and at least one primarily water producing layer. The method involves the steps of providing a water shut-off gel into the formation to preferentially treat the water producing layers. This is followed by providing a viscoelastic fluid into the formation, where the viscoelastic fluid is broken by hydrocarbon, thereby remaining and viscosifying primarily in the water producing layers. Finally, a reactive fluid, such as an acid fluid, is provided. The reactive fluid treats primarily the oil producing layers because the viscoelastic fluid and the water shut-off gel prevent the reactive fluid from substantially entering the water producing layers.

    摘要翻译: 一种用于优先处理具有至少一个主要产油层和至少一个主要产水层的地层的方法。 该方法包括以下步骤:向地层提供截水凝胶以优先处理水生产层。 随后将粘弹性流体提供到地层中,其中粘弹性流体被烃破坏,从而主要在水生产层中保留和增粘。 最后,提供反应性流体,例如酸性流体。 反应性流体主要处理油产生层,因为粘弹性流体和水截止凝胶防止反应流体基本上进入产水层。

    Coiled tubing conveyed combined inflow and outflow control devices
    8.
    发明授权
    Coiled tubing conveyed combined inflow and outflow control devices 失效
    卷管输送组合的流入和流出控制装置

    公开(公告)号:US08286704B2

    公开(公告)日:2012-10-16

    申请号:US12606303

    申请日:2009-10-27

    IPC分类号: E21B43/00

    CPC分类号: E21B43/12 E21B17/20

    摘要: Methods and systems of hydrocarbon production where wellbore stimulation and production is achieved in a single wellbore run-in, and inflow control devices are installed in an existing wellbore completion. A coiled tubing string is conveyed into a substantially horizontal portion of a wellbore, where the coiled tubing string has a production tubular configured to execute both stimulation and recovery operations. The production tubular can include an inflow control device to be installed in an existing wellbore.

    摘要翻译: 在单井井管中实现井眼刺激和生产的碳氢化合物生产方法和系统以及流入控制装置安装在现有的井眼完井中。 连续油管柱被输送到井眼的基本上水平的部分,其中连续油管柱具有被配置为执行刺激和恢复操作的生产管。 生产管状物可以包括要安装在现有井眼中的流入控制装置。